1. INTRODUCTION AND BACKGROUND


Attention to water, sanitation and forestry policies in South Africa has turned to implementation.  The new policies and associated legislation are not only about ensuring adequate quality and quantity of water for human need; they are also about protecting the resources available for current and future use.  Due to the extent and multiplicity of the management functions associated with water quality management, it is no longer considered to be the sole obligation of a single authority, but is now increasingly the responsibility of all levels of the community, including industry, local government as well as individual water users.

The Committee, as mandated by the Constitution and Rules of Parliament, undertook oversight visits to the Limpopo and North West Provinces.  This was to gauge the manner in which the responsibility of water, sanitation and forestry issues are being addressed by different levels of the community, including industry, local government, as well as individual water users.

1.1. Objectives

To this end, the objectives of the oversight visit were to:

Identify municipalities falling within Project Consolidate, and monitor and evaluate the challenges and solutions that are currently being formulated to ensure the addressing of water, sanitation and forestry policies.
Examine the manner in which Catchment Management Agencies (CMAs), tasked with the management of water resources at the scale of Water Management Areas are working toward the sustainability of both the resource base, as well as water delivery mechanisms. 
Investigate the way in which CMAs are informed by local-level representation through Catchment For and/or Committees, water User Associations, Water Services Authorities and Water Service Providers.
Examine the way in which local governance structures, in the form of district and local municipalities participate in the water management and supply side as Water Service Authorities and Water Service Providers.
Focus on the human and financial resources set aside for water quality protection, enforcement, monitoring and oversight.
Obtain detailed information and first-hand insights into the Working for Water Programmes.
Focusing on the Kruger National Park’s to address issues of water conservation projects, biodiversity and the protection of ecosystems, in light of other overriding priorities.
Evaluating management effectiveness, in areas of veld and fire control.
Job creation in the water and forestry sectors.
The targets to be met on water, sanitation and bucket eradication.
The impact of the mining sector on the state of rivers in these two provinces.

Whilst all the above objectives could not be undertaken simultaneously, the issues were divided into different foci for different areas within respective provinces.

The Committee undertook a study tour to the two provinces during the period of 30 July – 4 August 2006. The Committee members split into two multiparty delegations that visited the two provinces.

1.2              Limpopo Province delegation

Ms C C September, (Leader of the Delegation) (ANC), Ms T E Lishivha (ANC), Mr J D Arendse (ANC), Mr K Moonsamy (ANC), Ms M L Kompe-Ngwenya (ANC), Mr M W Sibuyana (IFP).

1.3              Officials from the Limpopo Province

Mr. A Matukane – Chief Director Department of Water Affairs and Forestry, Mr. S L Rampedi – Head of Department: Dpt. of Local Government and Housing, Mr. Papo Maloka – CEO (SALGA), Mr. Willie Modisha – Chairperson Lepelle Northern Water, Mr. Collins Chabane – MEC: Department of Economic Development, Environment and Tourism, CLLR. Martha Maphaga – Mayor Greater Marble, CLLR. Dickson Masemola – Executive Mayor Greater Sekhukhune, Mr. Ockie Van Den Berg – DWAF, Mr. T Nkadimeng – Municipal Manger: Sekhukhune, CLLR. Sam Mamekoa – Mayor: Greater Tubatse Municipality, CLLR. Thabita Mohlala – Speaker of Mopani District, CLLR. Gloria Valoyi – Mayor of Ba-Phalaborwa Local Municipality, Dr Thomas Gyedu-Ababio – Manager: Kruger National Park, Mr. Tim Maake – Manager: Mopani Municipality
Dr T Simelane – Director: Forestry Policy and Strategy, CLLR. Humphery Makgobi – Executive Mayor: Mopani District Municipality, CLLR. Ms Suzan Sibiya, CLLR. Norman Makumbane – Mayor Thulamela Municipality, Mr. Mulovhedzi – Municipal Manager: Vhembe District, CLLR. Irene Mutsila – Executive Mayor Vhembe District Municipality, CLLR. Glory Mashaba – Mayor: Nzhelele, Mr. S Mbedzi – DWAF, Mr. M S Selamolele – Speaker: Blouberg Local Municipality, CLLR. Refilwe Kubjana – Mayor, Ms Tracey Malatyi – Municipality Manager: Capricorn District municipality, CLLR. Motalane Monakedi – Executive Mayor Capricorn District Municipality.

1.4              North West Province delegation

Mr. TDH Ramphele (Leader of delegation) (ANC), Ms P Bhengu (ANC), Ms J Semple (DA), Mr. PHK Ditshetelo (UCDP).

1.5              Officials from the North West Province

Mr. Chadwick Lobakeng: Regional Director – DWAF, Mr. Bongani Msimang: Support Staff – DWAF, Rev. SH Letlape: Director: Department of Local Government and Housing, Ms S Mayoli: Regional Programme Leader: Working for Water - DWAF

2. LIMPOPO PROVINCE

2.1. Overview of the Progress on Delivery of Water in the Limpopo Province – Written Presentations

Provincial Overview:  Department of Water Affairs and Forestry

Limpopo Province consists of 5 District and 25 Local Municipalities. The
Province has 12 Water Service Authorities. Sekhukhune, as one of the District Municipalities, has been declared a rural nodal point.

The progress in water services reflects the following:

From an initial backlog of 4.1 million in 1995, the water backlog has been reduced to 2.7 million.  18 villages have been targeted in which job creation will take place.
Free Basic Water (FBW):  3.7 million out of 5.8 million people have been provided with FBW.  The poor represent 2.1 out of the 3.7 million.
In terms of planning, Water Services Development Plans (WSDPs) have been developed for all water services authorities and updated bi-annually.
Water has been prioritised, for example, R443 million out of R821 million within the Municipal Infrastructure Grant (MIG) is for Water and Sanitation.
DWAF officials provide support through Project Consolidate to Municipalities in planning, implementation and institutional development.
Interim operation of schemes by DWAF:  the operations subsidy is R526 million for the 2006/07.
Transfers:  all Water Service Authorities (WSAs) have signed transfer agreements with the exception of one.
Of the 5640 staff, DWAF has seconded 700 staff to Sekhukhune, 220 to Mogalakwena, and transferred 44 to Lephalale.  Municipalities are taking over customer care functions.

The progress in water resources development reflects the following:

The water resources development planning supports the Provincial Growth and Development Strategy (PGDS). The linking of the following strategies, that of the National Water Resource Strategy (NWRS) and Strategic Framework for Water Services has been developed, and linking this to the PGDS is underway.

The second draft of the Limpopo Water Strategy has been developed.  The next step would be to hold a provincial workshop to finalise the document would be scheduled.  This will be presented to the MEC for Local Government.

The large projects in Limpopo under the NWRS comprise the Nandoni Dam (Olifants River) which will be raised by 5 metres, and de Hoop Dam (Steelspoort River). Construction on de Hoop Dam is expected to begin in 2006.  The Nwamitwa Dam (Great Letaba River) was approved by the Limpopo Exco in September 2005. A project co-ordinating committee was established to:  investigate financing options; undertake international negotiations and environmental impact assessments.  The Inyaka Dam (Marite River) was completed in 2001. The Modjadi Dam Weirs:  Nondweni (Letaba River), Xikundu (Luvuvhu). The Tzaneen Dam (Great Letaba River) rising has been planned.

The progress made in terms of water resources institutions comprise the following:

There are 3 main water management areas, Limpopo, Luvuvhu/Letaba, and Olifants, managed by Mpumalanga Province.
The catchment management is currently done by DWAF (Proto-CMAs).
6 Water User Associations have been established in the Limpopo Province (Nzhelele, Thabina, Lebalelo, Great Letaba, Mutala and Mutshimbwe).
Representative monitoring points are established at strategic points, for example, rivers/streams, dams, major aquifers, discharge points from mines and industries.

The challenges impaling the water resources institutions comprise the following:

There are difficulties in consolidating the roles and responsibilities of the following stakeholders in water services:  regulator (DWAF), authorities (WSA) and supporters (DLGH and DWAF).  The providers (Water boards, local municipalities), especially regional water services providers.
Ensuring adherence to Water Services regulations and standards is a problem, especially to assure good services to customers (quality, quantity, affordability and sustainability).
Ensuring adherence to master plans for water resources and water services is also a problem.
Funding for water services to take water from water resources to households is not available.
Disaster management:  drought, floods and waterborne diseases are undertaken through the disaster management committee and joint operational committee. 
The methods to address the water and sanitation backlogs are long term measures in terms of water resource development, restrictions, drilling boreholes to urgent problem areas, tinkering, water demand management and cost recovery.
Cost effective utilisation of water resources, for example the use of groundwater, recycling, floods, close operation of dam levels, emergency preparedness plan.
Promotion of water conservation/demand management.
Monitoring of water quality and quantity in terms of awareness campaign and cost recovery.
Financing of water services infrastructure and operations and maintenance budgets.
Illegal connections and stolen equipments.
Long-lead time to establish catchment management agencies (CMAs) and user associations, for example public participation process.
Solving the overall water deficit for Limpopo Province, for example, agriculture and mining.

iv.               The progress made in terms of forestry comprises the following:

Commercial Forests manages 5000 hectares of gum and pine.  Indigenous forest management conserves 15 000 hectares of natural forests.  The forestry development division focuses on the forestry resources programmes.  The forestry oversight division regulates the sector according to the National Forest Act (NFA) and National Veld and Forest Fire Act (NVFFA).  The forestry institutional support focuses on provincial growth and development strategies, integrated development planning and local economic development.

In terms of the forestry enterprise development (community empowerment, it comprises forestry enterprise programmes (small timber growers, small mining timber suppliers, etc). Livelihood support programmes are bee keeping projects, bird watching, woodcarving, etc.  The forestry awareness programmes comprise Arbour Week, Arbour City Award, Edu-Plant and Greening Strategy.

2.2 Working for Water Programme

The Working for Water Programme is an Expanded Public Works Programme intervention led by the Department of Water Affairs and Forestry. The integrated approach followed for the Working for Water is:

Technical – clearing of invasive alien plants.
Social – HIV and AIDS training and life skills development.
Economic = contractor development – building of strategic partnerships.

The working for water’s implementation of cooperative governance identified the projects within the district municipalities and operations are done in line with the integrated development plan for social upliftment and poverty alleviation.

A memorandum of agreement has been signed between the Department of Labour and the Department of Water Affairs and Forestry. The Department of Labour funds skills development/training of workers and contractors. Aquatic weeds and the rivers worked thus far are Letaba River in the Tzaneen area and the Wilge River in the Groblersdal area.  The species targeted are the water hyacinth, and kariba weed. The method of work consists of aerial and hand spraying of herbicide and biological control agents.


Expenditure – April – June 2006

Employment Created To-Date

Number of People

Women

Youth

Disabled

Total Number of People

223

39

0

388

5

1

0

13

15

7

0

25

14

3

0

29

0

0

0

0

0

0

0

0

0

0

0

0

257

50

0

455


2.3 Project Consolidate and Disaster Management:  Department of Local Government and Housing

Since 2004, Municipalities have encountered a number of challenges.  This prompted the Government to adopt a targeted programme of intervention, Project Consolidate.  The Department of Provincial and Local Government undertook a study to profile municipalities in terms of the following indicators:

Municipalities affected by 4 main basic service delivery measures:  electricity, water, sanitation and refuse removal.
Municipal services debt and billing systems.
Municipalities performing less than 30% of their assigned functions.
Municipalities under section 139 interventions. 
Municipalities in financial distress.

In Limpopo, the following 15 municipalities were identified as Project Consolidate based on the above criteria.

Sekhukhune DM           

Greater Tubatse
Greater marble hall
Fetakgomo
Makhuduthamaga
Groblersdal

Capricorn

Blouberg
Lepelle-Nkumpi
Agagang

Mopani

Greater Letaba
Greater Giyani
Maruleng

Waterberg        

Thabazimbi

Vhembe           

Makhada
Mutale
Thulamela.


In terms of the progress made as a province, with regard to Project Consolidate, the following was noted:

All the Project Consolidate municipalities passed council resolutions in support of the programme.
All municipalities developed municipality action plans.
Provincial programme of action developed.
Action plans for respective elements developed.
Provincial steering committee constituted and functional.
8 element leaders appointed.
Constituted working teams at all the Project Consolidate municipalities during January 2006.07.30 undertook audits on service delivery for the province.  1996 and 2001 census information and service delivery between 2000 – 2005.
District profiles compiled (basic services, led, financial viability, institutional transformation and capacity building, governance and public participation.


2.4 Overview of Water and Sanitation Services in the Greater Sekhukhune District Municipality

The District consists of five local municipalities.  They are Greater Groblersdal, Greater Marble Hall, Greater Tubatse, Fetakgomo and Makhuduthamaga.  The total population of the District is approximately 1 024 748 people.  55% of the population consist of women, 56 of the population is under the age of 20, approximately 23% of the population does not have formal education and 23% of the population has primary education, 22 has secondary education and only 1% has tertiary education.

The District settlement patterns are largely rural with approximately 500 dispersed villages.  The main contributions to the economy are community services (52%), mining (20%) and trade (17%).  Tourism, agriculture and manufacturing have significant potential to be further enhanced.  Only 30, 9% of the population is employed.  Employment stands at 69, 1%.  The District still faces huge infrastructural backlogs on basic services – water – 69%, sanitation – 80% and electricity – 60%.

Water and Sanitation Provision

33 070 households do not have access to any sanitation service whilst 127 331 rely on pit latrines that are not ventilated. Current sanitation backlog is estimated at 80%, that is, households below RDP standards. 69% of our population still does not have access to water at RDP standards.

The Greater Sekhukhune District Municipality supplies the 6000 free litres of water, and indigent accounts are paid in areas where there are meters and billing takes place. Water is supplied through water tankers to some villages without infrastructure. 162 000 households benefit annually from Free Basic Water in the GSDM. An amount of R15, 0 million allocated for Free Basic Water in the last financial year, has been fully utilised. An amount of R17, 0 million is allocated for Free Basic Water provision during the 06/07 financial year

Some of the challenges noted were the following:

The implementation of the Section 78 process and resolutions taken by Council was proving to be a problem as buy-in by all into the process was problematic.
Re-organizing former DWAF staff into municipal structures has its own challenges.
The implementation and supervision of recruiting and retaining technical skills for project planning was a problem.
An additional R1, 9 billion is allegedly required to eradicate the backlog. This figure excludes the De Hoop Dam development.
Current grant funding appears inadequate to ensure National targets are met.
The construction of the De hoop Dam and raising of the Flag Boshielo Dam wall is crucial to water supply in the District.
 Water demand management measures to be implemented.
Capacity of emerging service providers.
The complex geographic terrain of the district poses a problem.
The high water pumping costs at Nebo Plato is a critical issue.
Small and scattered villages remains challenged in receiving water supply.
The WSDP documentation process is completed, but many gaps still remain.  It is a process to accumulate and build information base.
The vandalism of infrastructure still creates problems.
The District still has major backlogs with regard to water and sanitation.

The recommendations, suggested by the presentation incorporated the following:

Given the low-income levels in the District, appropriate and affordable delivery models in line with RDP standards should be developed.
Low revenue base challenges the institutions to emerge with new financial models to build the local economy thereby ensuring their sustainability.
Sustainable infrastructure is needed to support economic development.
Sector departments need to improve the allocation of resources to the district as a Presidential Node.
Integrated planning is required between the three spheres of government and also public entities in infrastructure provision.
Institutional support around issues of planning, project management, financial management, are needed.

In response to the manner in which the District Municipality is addressing the challenges, the following was noted:

The development of a cost recovery system. An implementation strategy for the cost recovery system has been developed.
Tariff structures have been developed and will be implemented in October 2006.
By-laws have been developed and will be implemented in October 2006.  An implementation strategy for the by-laws has been developed.
Operation and maintenance of transferred DWAF Schemes are in progress.
The implementation of decisions taken during the Section 78 process will be concluded by December 2006.
A three-year implementation process has been devised to implement a refurbishment programme of all transferred DWAF infrastructure.

  Overview of Water and Sanitation Services in the Vhembe District Municipality

Vhembe District Municipality was established on 5 December 2000 and consists of four Local Municipalities, namely: Thulamela, Makhado, Musina and Mutale. It covers an area of 21 407 sq km. The District settlement pattern is largely rural with about 772 communities. The District Municipality has a population of 1.376 374 people and 264 687.31 household. 89, 7% of population resides in a rural area

Water and Sanitation Provision

The District still faces huge infrastructural backlogs on basic services:  Water – 53% and sanitation – 73%.  The District has 22 regional and functional schemes, 1 172 operational supplementary boreholes, 14 water treatment works, 5 sewage works, 9 ponds and 183 dry, collapsed and vandalized boreholes.  Approximately 1001/c/d purified bulk water is being distributed to communities.

In terms of water provision, the infrastructure backlog to RDP street taps is 53% (approximately 729 136 people). 527 communities (85.9%) experience operation and maintenance problems and poor infrastructure conditions. Only 51 communities have adequate water infrastructure. About R528 million is needed to eradicate the backlog.  R264 million per annum is needed to reach the national targets.

The water and sanitation provision for the District is as follows:

The Makhado Local Municipality, a Presidential project, sources underground water.  The scheme, a pre-paid meter one was completed in 1998.   The community has vandalized the scheme, as there is opposition to the installation of prepaid meters.  The objective of the prepaid meters was to conserve water as the source is limited. There is a shortage of water in some areas. In the Vuwani area, the Water scheme is unable to supply water to the area.. Water does not reach the reservoir as pipes were connected to old ones. Water is supplied by truck once a week to the area. Water quality challenges occur in the Hanani village too.

In the Tshitale region, there is also a reliance on underground water. At Mulima and Likhade there are one electrical borehole and two boreholes equipped with hand pumps. The water reticulation does not cover more than 30% of the village. Villagers in Lambani collect water from Likhade or from the river. At Pfanani there is only one borehole which pumps to the reticulation system and demand is very high.
At Muwaweni, Madadzhi, Geradine, Mangovhe, Salaunavhe and Slanger, two boreholes are connected to the reticulation system for Madadzhi, Geraldine and Mangovhe.  Demand is very high.  Water reticulation cannot cover 40% of the village.  At Muwaweni, Slanger and Salaunavhe, two boreholes equipped with diesel driven pumps water to reticulation system (Muwaweni).  The demand is also very high at Salaunavhe and Slanger, two hand pumps supply water to the villages.

At Nthabalala, there are boreholes supplying water to the area.

At the Nzhelele Water Scheme, all the villages to the West receive water from the Mutshedzi Dam.  There are a number of illegal connections. There is also an augmentation from the boreholes. Villages to the south get water from Tshifhire Water Scheme.  On the North West villages like Mudimeli and Pfumembe get water from the Sandwel. Currently there are technical problems, but work is being undertaken to rectify these.

At the Thulamela Local Municipality, water is provided by boreholes in the following areas: Mavunde, Sambandou, Mahuwi, Shanzha Tshitavha, Tswera and Mangaya. A bulk water supply project (R10m) for the above areas to be implemented in the current financial year (2006/2007). With access to water problems, also it was reported in September 2005, that cases were reported of a disease at the clinic. People from these villages fetch water from streams, in some algae surround water accompanied by animals using the water too. Out of the three public boreholes, only one is functioning.

The District anticipates reaching the 2010 national sanitation target.  24 022 VIPs have been constructed as of 2001.  The sanitation backlog is at 73%.  R11,232 million has been spent on sanitation for 2005/06, and a further R25 million has been budgeted for 2007 to construct VIP toilets.

The following challenges of water and sanitation provision were highlighted in the presentation:

Sanitation:  Lack of resources and water services infrastructure.  At present, about R545 million is required to eradicate the backlog.  R136 million per annum is needed to reach the national target of 2010.  The sustainability of the VIPs, with regard to maintenance is emerging as a problem.

Water:  Non-adherence to the operation manuals poses a problem.  The water is no longer good for consumption, as water contains calcium.  Cost recovery also poses a problem.  No integrated planning on the settlement development.  Copper water pipes are stolen to make rings.  Illegal connections cause major disruptions.

The general problems highlighted by the presentation revealed the following:

Lack of demand management.
Lack of reasonable cost recovery.
Refurbishment of schemes was expensive.
The demand exceeded the design capacity.
The population growth versus demand has not been factored in.
The operation and maintenance costs are high.
Vandalism and stealing of engines for water services systems, for example, valves, telemetry and boreholes prove to be costly.
The lack of underground water and limited sources exacerbates the water situation.

Vhembe District Municipality provided the following recommendations:

Water quality monitoring needed to be rigorously undertaken.
Operation and maintenance funds to be carefully considered.
Demand management and cost recovery issues to be examined.
Outstanding issues, such as transfer agreements, WSP process, resources to meet the national targets are to be urgently addressed.

 Overview of Water and Sanitation Provision in the Capricorn District Municipality

Capricorn traverses parts of the Sand Catchment Area, Mogalakwena Catchment Area and Olifants Catchment.  There is little economic activity, and most of the population is mainly dependent on agricultural activities and mining. In the Blouberg Municipality, shortages of water exist in the Springfield-Lesfontein. Although a water project was established in 1986, it is not purified and is too salty. Trucks supply water to the local community when the salt block the pipes, however in instances where the trucks arrive too late, the community resort to the streams which is not suitable for human consumption. 


Water and Sanitation Provision

A significant growth in water demand is expected due to planned mining developments at Lephalale and Mokopane.  Currently, water requirements are broadly balanced with water resources.  Water is being imported to Sand River Catchment (Polokwane) from Olifants and Groot Letaba.  Groundwater is not optimally used to supply rural domestic needs in certain areas.  The opportunities for further dams are limited.  The Mogalakwena Catchment has been identified for compulsory licensing.

The water resources are obtained from the following:

Blouberg – depends on ground water.
Agagang – mainly ground water.
Moleole – mainly ground water.
Capricorn – ground water, water from Groot Letaba River and Olifants River.
Lepelle-Nkumpi – ground water and smaller dams and Flag Boshielo Dam on Olifants River.

The reconciliation option to increase water resources in this area is the construction of the New De Hoop Dam.

Other measures to meet demands:

In terms of water conservation and demand management: Diversify tariffs, monitor night flows, to manage pressure and leakage, and to achieve savings in urban and rural areas, as well as the agricultural sector.
Re-use of effluent will also be a contributory factor.
Increased ground water use.
Leasing of water.
Re-allocation of water entitlements.
Conjunctive use of water.
Assurances of supply optimisation.

The recommendations that emerged from this presentation incorporated the following:

DWAF needs timely information on future developments and water requirements. 
Water Service Development Plans, Integrated Development Plans and Provincial Growth and Development Strategies need to be regularly reviewed and communicated.


 Presentation by the South African Local Government Association (SALGA)

SALGA’s presentation provided detail on the following:

Background on the Masibambane Programme Management in the Province (Provincial Collaborative Structure).
Strategic Framework for Water Services.
Provincial Water Strategy.
Transfer/Section 78 processes.
Provincial Joint Response Facility.

The Masibambane Programme evolved as a forum, which represents the water sector with representations from the District and Local Municipalities.  The Cabinet approved a Strategic Framework for Water Services (2003) sets out a vision for the sector with specific goals and targets, and clearly describes the roles of all key sector partners.  Masimbambane Limpopo used the National Strategic Framework to develop Provincial Water Services Strategy.  The Provincial Water Services Strategy was approved and adopted by the Provincial Water Summit.  The Collaborative Committee is spearheaded and chaired by SALGA, DWAF and DLGH.

The current status of the Provincial Water Strategy, reflects the following:

Consultations with Water Service Authorities were undertaken in the Province and a second draft strategy was developed.  This will be work-shopped with sector stakeholder. 

In terms of the Transfer/Section 78 processes, DWAF engaged in a process of transferring water schemes and personnel to Water Services Authorities.  A total of 84 schemes and 5654 personnel form DWAF were to be transferred to WSAs by 31 March 2006.  Three schemes in Vhembe DM and two schemes in Sekhukhune DM required Cabinet decision for them to be transferred as their value is above R100 million each.

The Provincial Joint Response Facility Programme was created by partnerships between DBSA-DF, SALGA Limpopo, DWAF and water sector stakeholders in Limpopo Province to address the needs of WSAs in Section 78 assessment as required in terms of Municipal Systems Act, and to transfer schemes from DWAF.

In response to a Presidential directive on councillor training and capacitation programme, DWAF, SALGA and DLGH rolled out an intensive councillor induction programme in all District Municipalities.

The challenges highlighted by SALGA encompassed the following:

The clarification of contractual obligations between DWAF and WSAs had to be dealt with.
Suspensive clause had to be incorporated in the final transfer agreement.
Parliamentary approval required for schemes in excess of R100 million.
There is still a need to support the receiving authorities on the post-transfer challenges. 
A need exists to develop support programmes for after care of these schemes.
WSAs need Human Resource support in their transfer processes.

Olifants River Resources Development Project

The President in his 2003 State of the Nation Address announced the construction of a dam in the Olifants River system to unblock the rich mineral deposits in the Limpopo Province.  With such a catalyst, it is economical to supply water to towns, industries and poorly serviced rural communities in the Sekhukhune area.  The first phase of the Olifants River Project comprises the raising of the Flag Boshielo Dam, which is already 95% complete.

Cabinet in 2004, approved Phase 2A of the Project comprises the implementation of the De Hoop Dam on the Steelpoort River in the short term as the need for water services and mining increase.  The De Hoop Dam is the only feasible option to supply water to the Nebo Plateau where approximately 800 000 people reside, the vast majority of whom have totally insufficient access to potable water due to the general scarcity in the area.

Phase 2A was included in Government’s Programme of Action for 2006 in pursuit of achieving goals for supplying basic water services, to support the Growth and Development Strategy of the Limpopo Province with associated growth opportunities in support of the Accelerated and Shared Growth Initiative of South Africa (ASGISA), whilst providing an anchor project for the development of the Dilokong Corridor.  The Project is developed with the support and cooperation of the Mpumalanga and Limpopo Provinces and Local Government.

The main aim is the creation of a large storage dam at De Hoop on the Steelpoort River to commence partial impoundment and delivery of water by the spring of 2009, and final completion and commission during 2010.

A section of the provincial road P169 – 1 (R555) between Middelburg and Burgersfort will be submerged by the future De Hoop Dam, and therefore requires alignment.  The realigned route of about 20 kilometres will pass the new dam on the western side.  The tender design is 95% complete.

An appeal was made by the South African National Parks against the record of decision of the above project. SANParks noted their concern around options of the environmental authorisation and the challenges faced by SANParks in protecting biodiversity and DWAF on the other hand with giving effect to the Reserve.

SANParks and DWAF agreed that the concerns of SANParks could be divided into:

Matters directly pertaining to the proposed project.
Matters of a wider water resource policy and management nature that concern SANParks in general.

With respect to matters directly pertaining to the proposed project, it was agreed that DWAF would, at all stages of the project, involve SANParks in matters relating to rivers that drain into the national parks, and in this particular case, it was agreed that SANParks, as a key stakeholder, needed to participate during the implementation of this project.  It would be proposed that Condition 3.2.1.2 be widened in order to allow for representation by SANParks in the Environmental Monitoring Committee. 

With respect to matters of a wider water resource policy…SANParks in general, DWAF agreed that these could best be dealt with bilaterally with the two institutions.  The agreed approach would consider the following:

It was agreed that liaison between the two needed to be formalised to deal with matters of mutual interest.  One of the standing agenda points of a liaison committee would be regular assessments of the status of water resources including all SANParks conservation areas, including KNP rivers, to inform decisions on possibly restricting water use, that is, to ensure that the required flow is available for maintaining healthy ecosystems.

DWAF complied with the requirements of the SADC revised Protocol on Shared Watercourses in informing the countries sharing the Limpopo River Basin with South Africa, namely Botswana, Zimbabwe and Mozambique about the intended construction of the De Hoop Dam.  No objections were raised.

A delay in the building of the dam are been experienced due to the environmental objections.

An integrated extended public works approach does not appear to be followed currently.

Challenges faced by the Kruger National Park in terms of water     conservation projects, biodiversity and the protection of ecosystems

The Reserve is described as the only right to water by the National Water Act (36 of 1998).  While South Africa’s National Water Act and Water Policy provide the legislative and policy framework for water allocations, the implementation and monitoring thereof seem to be lacking is many departments, or is being delayed.  Subsequently, the rivers draining through the KNP has deteriorated over the past years.  The rivers draining through the KNP are used for different purposes, including agriculture, mining, industrial, dams for purification purposes to serve human needs and finally for biodiversity conservation.  All these varied uses, is also the need to allow some amount of water to drain into the neighbouring country, Mozambique.  The ‘reserve’ is however not been implemented and the consequences are extremely demanding on the KNP. 

The rivers draining through the KNP are greatly over-utilised.  Pollution from various sources compound the problem, thereby degrading the riverine habitat and reducing the supply and quality of the river water.  The KNP has the mandate to preserve it biodiversity in the national interest.   The quantity and quality of the rivers are continuously deteriorating to the detriment of the biodiversity, and this makes it difficult for the KNP to achieve its mission.  There are various threats to the ecosystem in all the rivers, involving the KNP when it comes to water availability. 

Water quality has also deteriorated over time.  A contributing factor to the deteriorating water quality is over abstraction.  The little water that remains in the system become saturated with dissolved substances to such an extent that it becomes unsuitable for some of the sensitive species in the water. 

The building of dams and numerous weirs for the balancing of water in the river systems has not helped the problem either.  Big dams like the Nandoni Dam on the Luvuvhu River has no fish ways.  This prevents the migration of aquatic biodiversity from one end to the other.  These structures on the rivers have contributed to the accumulation of silt/sediment in the system.  Dams and weirs also serve as traps for invasive plants.  These invasive aquatic plants are washed down the river whenever there are floods, and this makes it difficult for the KNP invasive control unit to eradicate these unwanted species.

The only environmental reserve determined for the KNP Rivers that is being implemented is that of the Sabie River.  Although all the rivers have in-stream flow requirements determined by DWAF, none is being implemented. 

The recommendations noted by the presentation, incorporated the following:

Institutional:  The water resources of South Africa must be managed to ensure that the resources are sustainable for both current and future use.  The Government has a responsibility to ensure that water is managed to achieve social and economic benefits in a manner that is environmentally sustainable. 

Legislation:  Implementation/Application of relevant legislation, including Chapter 18 of Agenda 21, White Paper on National Water Policy, Protected Areas Act, Biodiversity Act, National Water Act and National Water Resource Strategy.  South Africa has a strong legislative framework through the National Water Act for providing water resources management measures.  Water resources would be better if these adhered to.  These include:


Restrictions on water use.
Development and implementation of catchment water management plans.
Development and implementation of water allocation plans for all prescribed water resources in the State.
Extensive community consultation during the preparation of all water plans.
Review of the condition of the water resources.
Compilation, maintenance and updating of information concerning the State’s natural resources.
Sharing of information on the natural resources.

The Reserve: Reserve determination (comprehension) for all the rivers involving the KNP should be undertaken as a matter of urgency. Thereafter, a proper monitoring system should be in place by all stakeholders concerned. A much more concerted action and proper law enforcement should then be embarked on to help solve the problems over the long-term. In the meantime, operating rules being developed by DWAF in conjunction with stakeholders should be used to ensure equitable and judicious use of the water resources. The implementation of the ‘operating rules’, and the available data, in the absence of the comprehensive reserve should be regarded as a priority for the benefit of all users.

Catchment Forums:  The River Forums that have been established throughout the catchments serve as platforms, to among other things, the creation of awareness on the plight of the rivers in the KNP.  Members include municipalities, farmers, the industries, mines, communities, government departments and the KNP.  Many more of these forums should be established. A need exists to work on the important issue of, ‘How water resource users and stakeholders will be able to influence decision-making and contribute to resource management (use patterns)?’ For example, through integrated management – involving everyone who has a stake or interest in the water resource.  Managing conflicts between stakeholders with different interests and creating buy-ins with/for the problem/vision at hand.  Educating people about the problems, and to work out solutions together in relation to legislation and other guidelines.

Environment inspectors:  Environmental inspectors to supplement the efforts of government departments are an important option.  Such inspectors, with the technical and operational expertise can contribute to the sound management of water resources.

Inter catchment transfers:  The transfers out of a catchment.  In making its determination whether transfers may be permitted, the department should:

Protect present, and consider projected stream uses of the losing river basin generally, and of the losing river specifically including, but not limited to, present agricultural, municipal, industrial and in-stream uses, and assimilative needs.
Protect water quality of the losing river basin.
Consider reasonably foreseeable future water needs of the applicant for the water to be transferred, including methods of water use, conservation, and efficiency of use.
Consider beneficial impact on the catchment and its local subcatchments of any proposed transfer, and the capability of the applicant to implement effectively its responsibility under the requested permit.
Consider the nature of the permittee’s use of water to determine whether the use is reasonable and beneficial.
Consider whether the proposed project shall promote and increase the storage and conservation of water.
Consider the feasibility of alternative sources of supply and their comparative costs.
Consider availability of water in the losing river basin to respond to emergencies, including drought.
Consider whether the project shall have any beneficial or detrimental impact on fish and wildlife habitat, aesthetics, or recreation.
Consider such other facts and circumstances as are reasonably necessary to carry out the purpose of the NWA.

Catchment management agencies:  CMAs should monitor, control and or implement the development along the rivers, research and policy development, information and education of the public, alien species control, wetlands development and protection, bank erosion, resource protection, water quality monitoring with respect to physical, chemical, microbiological and biological components.  Further tasks that the agencies could undertake are:  to promote and ensure a high level of awareness amongst and support from managers (internal and external), water users, action groups, politicians and the public.  Co-operative governance, information management, delegated authority driving partnerships, communication at all levels, alignment of initiatives, ecological integrity versus economic and social development and conservation targets versus river classification.

For each prescribed resource, a water allocation plan should be prepared in close conjunction with the stakeholders.  Water allocation plans will provide information on water that is available for use as well as for the environment, and policies on the allocation and transfer of water.  Where immediate controls are required to manage water resources that are under pressure, a notice of restriction or prohibition may be applied.  This temporary control ‘holds’ water use at current levels while the capacity of the resource, its ability to provide for future growth and the need to prescribe the resource are assessed.

Lepelle Northern Water

Lepelle Northern Water (LNW) Board was established in 1997 by the Minister of Water Affairs and Forestry in terms of the Water Service Act, 1997. The area of jurisdiction of the board starts at Hoedspruit and Sekhukhune in the South, Mogalakwena municipal area in the west and it extend to Capricon, Vhembe and Mopani district municipal areas. LNW operates eight schemes which produce a total of 211 Ml/day of potable water and 120 Ml/day of industrial water.

Lepelle Northern Water operates within parameters set out in the Water Services Act, 1997 and strives towards achieving a balance between a number of key requirements. Given the challenge the Board faces of transforming itself into a supplier of equal and efficient services to all members of the population under its jurisdiction, the following three functions have been identified as being of particular relevance:
 
Achieving financial viability.
Promoting the efficiency of water services authorities.
Taking cognizance of the needs of water services institutions, consumers and users.

The highlights of the financial component of Lepelle showed the following:

The Olifants/Sand partnership loan of R218 million was successfully redeemed at the end of October 2005.  The loan was a result of ministerial directive to the Board in 1995 to construct a pipeline from Olifants scheme to Perkusbult, drought situation in Polokwane and surrounding areas.
Public private partnership with Anglo Platinum, Mogalakwena Municipality and Lepelle Northern Water:  R90 million pipeline was placed to improve security of supply. 
Public private partnership with Anglo-Platinum, Polokwane Municipality and Lepelle Northern Water:  R28 million pipeline was placed to improve security of water.
The Board has successful refinanced the Ebenezer Loan taken from DWAF at 15.75% with a loan from DBSA at 9.2% resulting in interest savings of R12 million over the term of the loan.
General Reserve Fund – the deficits at R7 million (2004/05) from R24 million in 2003/04.

In terms of tariff policy, the following was noted:

The Board uses a full absorption costing method when determining tariffs.  The tariffs of the Board are scheme based and take into account the cost drivers associated to the scheme.
In determining and approving the tariffs, the Board consults with the stakeholders as provided for in the MFMA, section 42.
The tariff adjustments or increases are tabled in Parliament by the Minister of Water Affairs and Forestry for approval.  The Board has taken a policy decision in 2000 on tariff equalization over the next ten (10) years.  The equalization process has been phased in the tariff over the past five years.

The strategic challenges noted by the presentation:

The Board has presented its services to the WSAs of Vhembe, Sekhukhune, Mopani and Capricorn pending the finalisation of their Municipal Systems Act (32 of 2003), section 78 processes.

There are uncertainties around the transfer of assets and personnel to WSAs (Assets = R2, 089 million and personnel = 4731).  The Board has positioned itself to assist the receiving municipalities in the transfer process.

The bulk infrastructure development of de Hoop Dam and Flag Boshielo pipeline to Mokgalakwena.  The Board will cost and quantify assistance to the indigents in the area of operation.

The assurance of supply of water for Capricorn and Polokwani Municipalities is a problem as the Ebenezer Scheme is vulnerable to drought (no inter basin transfer) and could not meet the requirements of the city.  The Olifantspoort Scheme is designed for a capacity of 30ML/day and is currently stretched to 42 ML/day.  The cross border schemes of Middle Letaba and Olifantspoort are considered a challenge as they serve different Water Service Authorities.

The Ba-Phalaborwa municipality debt to Lepelle Northern Water is a challenge.  The Municipality experienced difficulties and could not fulfil its obligations and the accumulated arrear amount is at R110 million.  The Board informed the Premier, Minister of Water Affairs and Forestry, MEC Local Government and Housing and Mopani District Municipality.  The matter is receiving priority attention.  To date, all stakeholders have agreed to put the credit control measures in abeyance against the municipality.  A submission was forwarded to the Director-General and Minister for assistance.  The Board will consider a contribution on the interest portion of the debts.

The following plans to address the above strategic challenges were noted:

An institutional model is complete for Lepelle Northern as per the Strategic Framework for water services.

Cost recovery solution for municipalities experiencing difficulties, such as Sekhukhune District Municipality.

Lepelle Northern Water has positioned itself, and is ready to offer assistance during transfers of assets in Mopani, Sekhukhune, Vhembe and Capricorn.

Software solutions have been developed, which will be suitable for rural areas, and can assist quantifying the indigents.

Fast tracking certain aspects of the Olifants River Water Services Development – a provision of R150 million has been made for the fast tracking of Phase 2E and 2D of Olifants River Development.  An investment of R3 billion to be unlocked.
2.8 Discussions from Written Presentation

2.8.1 The challenges faced by local government and housing in assisting municipalities to optimise delivery of water and sanitation

Serious municipal infrastructure backlogs were noted, and these impeded the facilitation of access to basic services.  Whilst these have been addressed by the Consolidated Municipal Infrastructure Programme, aimed at dealing with the current infrastructure backlog, in some municipalities, posed a bigger problem.  In 2004, the MIG was introduced to consolidate Water Services Projects.  The Department intends to facilitate the development of Municipal Infrastructure Plans to guide future municipal infrastructure investment and development.   Water provision is still a major challenge, and where there is considerable progress, the programme is hampered by the lack of access to reliable infrastructure, and the delays in appointments of water services providers as per the requirements of the section 78 processes.

The department is still faced with the challenge of effective coordination of municipal Integrated Development Plan process.  A number of the IDPs are not yet legally compliant.  The challenge is to ensure that IDPs become legally compliant and the content supports both social and economic development.

Municipalities: Capacity Assessments of Functions, incorporating authority, service provision, budget information and income information, staffing and equipment – an overview

 

Sanitation

Water

Sekukhune District Municipality

The Greater Marble Hall LM does not understand its authority for this function.
All the municipalities performing the function have made provisions for the service in their 2005/06 operating budgets.
Tubatse is the only municipality that does not have staff allocated to perform this function.  Only Groblersdal and Marble Hall LMs have equipment available to perform this function.

Marble LM does not understand its authority for this function.
Only Makhudutamaga has a completed section 78 and a service level agreement in place.
Tubatse is the only municipality that does not have staff allocated to perform this function. 
Tubatse and Fetakgomo are the only municipalities that do not have equipment available to perform this function.
Marble, Sekukhune and Groblersdal are the only municipalities that have made provisions for this function as part of their 2005/06 operating budgets.

Vhembe District Municipality

All municipalities understood their authority for the sanitation function.  However, only Vhembe DM is authorised to render this function.
With the exception of Musina, all municipalities indicated that section 78 investigations have been completed.  Only Mutale and Makhado indicated that they were using the services of an external service provider.
All municipalities, with the exception of Mutale, have provided budgets for the function.

All municipalities understood their authority for the water function during the 2005 assessment.
Three municipalities, Vhembe, Mutale and Makhado, make use of an external service provider, and have a service level agreement in place.  Furthermore, all 3 municipalities indicated that a section 78 had been completed.
Staffing was available for the function in all municipalities, except Musina and Mutale.
With the exception of Thulamela, all municipalities have equipment available for the function.


The information above highlighted to the delegation issues that need to be factored when focusing on the capacity assessments of functions of municipalities.  These can range from budget provision for water and sanitation, staff available for the function, equipment available for the function, service level agreements, sections 78 processes, as well as details of service provision.
The process undertaken to transfer staff was a major issue.
All municipalities prioritised the issue of receiving bigger budgets. 
Water provision to the mining sector as opposed to communities was raised as a problem.
New technologies needed to be developed to address the sanitation issue that is locale specific to the Limpopo region.
A review of legislation, policies and programmes may be required to address water and sanitation issues.

2.9 Findings at Site Visits

2.9.1 Flag Botshielo Dam

The raising of the dam is to provide water services to the adjacent communities.

2.9.2 Mokopane Dam

The dam is  going to serve the communities in the surrounding areas.

2.9.3 Proposed De Hoop Dam site and the Proposed ESKOM Power

The committee also visited the site where the Proposed Hoop Dam will be built and where the Eskom Power supplier will be generating water.
A delay in building of the dam is caused by environmental objections, now been looked at by the Department of Environmental Affairs and Tourism.

2.9.4 Shingwezi River

This is the river running inside the Kruger National Park.
Most of the years, the river is dry and becoming difficult for the animals to get water.
It is alleged that building of dams inside the Park is not an option as it can change the diversity of the Park.



2.9.5 Sand Mining

The illegal sand mining is a problem.
Some of the species died because of this problem.
An investigation team should be placed to look at the issue

2.9.6 Working for water project

The team consists of 10 employees.
The project is of good help to the community and it also managing the spices well.

2.9.7 Nandoni Dam

The dam is well built and ready to serve the community with water.
The purification is expected to be completed in September 2007.
After that, the municipality will be responsible for supplying of water to communities.

2.9.8 Tswera Community

The community of Tswera has no water.
They drink water from the streams and sometimes the streams dried out and they have to travel long distances to get water.
Boreholes would be the solution.

2.9.9 Tshitavha community

The community depends on rivers for water and they experienced problem of people dying from diarrhoea.
The community needs proper sources of water, purified water from the dams.
Sometimes they get water from the boreholes, and the water is full of mud and needs to be cleaned.
The village has a wetland and the fountain and the people drink from the fountain and the water is not safe.

2.9.10 Nzhelele Municipality (Water User Association)

The Water User Association was formed, a Chairperson was elected but not yet operational, as DWAF has not informed them of whether the association has compiled so as to begin their functions.
The Nzhelele Dam services only farmers and it should serve the communities around as well.
The existing schemes do not cater for all the water needs water in the community.

2.9.11 Nze Community  

The village does not have water.
They get water from the boreholes and the water sometimes is full of mud.
There is water across the road, but crossing the road is not safe, especially for the children.

2.9.12 Magau Community

There is a shortage of water, and it is difficult for learners to wash to go to school.
Communities have to pay for water.
They were promised to get water from Nandoni Dam, but this is not forthcoming.
There is a problem of illegal connections, which cause over spillage of water. The very little water they receive, is misused by spillage (children).

2.9.13 Springfield – Blouberg Local Municipality

Springfield Community

The village has water but the problem is that the water is salty.

3. NORTH WEST PROVINCE

3.1. OVERVIEW OF THE PROGRESS ON DELIVERY OF WATER AND SANITATION IN THE NORTH WEST PROVINCE

North West is spatially a medium-size province, covering 116 320 km2, and home to approximately 3.7million people. The Province is predominantly rural, with 65.1% of the population living in rural areas and 34.9% in urban areas. However, the rate of urbanisation is increasing, mostly due to the lack of employment opportunities in rural areas. Approximately 54% of the surface area has been transformed by agriculture. The North West Province has a dualistic agricultural economy, which comprises a well-developed commercial sector and a predominantly subsistence sector in communal areas. There are approximately 7,600 commercial farms. The number of small-scale farmers in the former Bophuthatswana amounts to approximately 147,000. Three major irrigation schemes are located on the Crocodile, Vaal and Harts Rivers. The Vaal-Harts Irrigation Scheme covers a total area of about 43,700 hectares with wheat, maize and groundnuts taking 36%, 23% and 22% respectively of the total irrigated fields. The Province generates 94% of South Africa’s platinum production, and produces 46% of South Africa’s granite and 25% of its gold.

Major challenges facing the province are the following:

Low population density and relative inadequate infrastructure, especially in the remote rural areas.
Inherited enormous backlog in basic service delivery and maintenance.
Predominantly poor population with high levels of illiteracy and dependency that seriously affect their productivity and ability to compete for jobs.
Significant inequalities between the rich and poor as well as disparities between urban and rural.
The Province is faced by HIV/Aids as a social and economic challenge.
Available resources are unevenly distributed and offer limited potential for improved delivery of services and growth.

3.1.1 Project Consolidate

The Project Consolidate programme was initiated in the North West Province in 2005 and 17 of the 21 municipalities were inducted into the programme with a total allocation of R422 million to fund the development of infrastructure.  Of the total amount allocated, R409 million was spent within twelve months on a variety of projects in areas such as water reticulation, sanitation, roads, storm water, solid waste, electricity and community facilities.

Table
1

Bojanala Platinum District Municipality

Central District Municipality

Bophirima District Municipality

Southern District Municipality

Moretele Local Municipality

Ratlou Local Municipality

Kagisano Local Municipality

Ventersdorp Local Municipality

Madibeng Local Municipality

Tswaing Local Municipality

Lekwa-Teemane Local Municipality

Maquassi Hills Local Municipality

Rustenburg Local Municipality

Mafikeng Local Municipality

Mamusa Local Municipality

Matlosana Local Municipality

Moses Kotane Local Municipality

Ditsobotla Local Municipality

Greater Taung Local Municipality

 

 

Ramotshere Moiloa Local Municipality

Molopo Local Municipality

 


Table 1. Project Consolidate municipalities in the North West Province  

Among the interventions made through Project Consolidate was the deployment of experts from different parts of the country to come and assist municipalities in the province in areas of administration and general management. Among the municipalities that benefited from this initiative were Mafikeng, Rustenburg and Moretele. In addition, experienced retired engineers have been deployed to each district municipality to help strengthen service delivery and project management capacity.

Basic Water Supply:  Infrastructure Backlogs

Approximately 0,92 million people receive water below RDP level.
Basic water supply backlog has almost halved in the last ten years from 46% in 1994 to 26% in 2005.
Limited local water resource availability.
Need mostly extension of bulk services infrastructure to serve urban clusters, which are located relatively far apart.
The demand for higher services levels requires co-funding and upgradeability of basic services
It is estimated that it will cost approximately R1.013 billion to eradicate the backlog, with an annual funding not less than R338 million per annum.
There is a need to address the remaining 26% less than 3 years to achieve the Government’s target of 2008.

Table
2

District Municipality

Population
(Census 2001)

Population
(Estimate 2005)

Population Below RDP (Water)

1           CENTRAL DM

953 672

1 034 481

312 520

BOJANALA DM

1 395 184

1 514 488

366 300

BOPHIRIMA DM

476 666

517 056

174760

SOUTHERN DM

770 258

835 525

67 544

Total

3 596 780

3 901550

921123


Table 2. People receiving water below RDP level.

Basic Sanitation:  Infrastructure Backlogs

Approximately 1,94 million people are below RDP sanitation levels, 70 000 with bucket system (2% of the population) and 1 872 734 million with unimproved pits (52% of the population). 
The sanitation backlog has only been reduced by 10% in the last 10 years.
It will cost approximately R1.3 billion to eradicate the backlog, with an annual funding not less than R260 million per annum.

Table
3

District Municipality

Population
(Census 2001)

Population
(2005 Estimate)

Population Below RDP Sanitation

2           CENTRAL DM

953 672

1 034 481

566 663

BOJANALA DM

1 395 184

1 514 488

844 089

BOPHIRIMA DM

476 666

517 056

334 343

SOUTHERN DM

770 258

835 525

197 639

Total

3 596 780

3 901550

1 942 734


Table 3. People receiving sanitation services below RDP level.

3.2. Overview of the site visit to Lebohang Gweriri informal settlement

The leader of the delegation requested a visit to one settlement near Mafikeng to establish the progress made in providing water and sanitation to the rural area in the surrounding. An impromptu visit was made to Lebohang Gweriri, an eight year old informal settlement near Rooigrond Prison. The community comprises of more than 250 households who are mainly evicted farm dwellers and most of the adult population is unemployed. The community does not have planned infrastructure and have very minimal access to basic services.   

Information received from a local Ward Councillor indicated that the settlement has been included in the current Integrated Development Plan of the municipality. However, throughout its existence settlement has not been serviced because of monetary constraints.

The community purchase water from an adjacent landowner and there is sporadic supply of water from water tanks provided by the municipality. The source of water is more than 3 kilometres from the settlement. A borehole has been drilled but DWAF was concerned that the planning in relation to the drilling was not properly done. There are no toilets and DWAF was concerned that the drilled hole was very close to the pit toilets. The distance was less than 15 meters and DWAF indicated that the distances could result in ground water pollution. Department of Provincial and Local Government represented in the delegation and they seemed to have no idea on the development in the area.

3.2.1 Findings and Issues raised

The community have very limited access to portable water and they often purchase water from a nearby landowner. Those who cannot afford to buy water, collect their water from a community borehole/windmill, which is located approximately 3 kilometres away from the community.
One the challenges related to access to water is that the two sources of water are located at a considerable distance and outside the community.  This is a problem for women and girls as it increases the risk of being assaulted as well as increases the burden of fetching water.
A new borehole was recently drilled by the municipality and not yet operational. However, the delegation discovered that this location of the new borehole was against regulations. The borehole is located less than 15 meters away from several pit latrines, and that increases that risk contamination.
For sanitation, the community depends on self-made dry pit latrines.  Some of these latrines are located very close to the new borehole and may contaminate the water source.
The delegation established that there was lack coordination between government departments and stakeholders, which resulted in the community being misinformed and projects not properly implemented. For example DWAF was not aware of challenges in the area.
Other challenges for the community include access to health and education for children. A mobile clinic often visits the area at least once a month. The visit usually falls in the middle of the week and the community is not informed in advance. Children walk a distance of approximately 6 kilometres to attend school.


3.3 The Site Visit to the Molopo Working For Wetlands Project

Working for Wetlands Programme is one of the Special Public Works Programmes of South Africa. It is also a multi departmental funded programme housed within the South African National Biodiversity Institute, a parastatal for Department of Environmental Affairs and Tourism (DEAT). There are four wetland rehabilitation projects in the Northwest Province:

Borakalalo Wetland Rehabilitation project
Rustengburg Wetland rehabilitation Project
Molopo wetland Rehabilitation project
Heuningvlei Wetland Rehabilitation project.

Rehabilitation measures applied on the wetlands include Gabion structures, Concrete, Earth, ecologs, earthworks and bioengineering. The delegation visited the Molopo Working for Wetlands Project, in Mafikeng. The rehabilitation measure applied at the Molopo Working for Wetlands Project consisted mainly of gabion structures.


3.3.1 Findings and Issues raised

The Molopo wetland is located in a privately owned land and as a result access to the wetland area is sometimes restricted.  Access to the wetland was a significant problem in the early stages of the project, as the farmer did not understand its purpose and value. Effective communication with the landowner and subsequent realization of the benefit of the project by the landowner made a significant contribution to addressing this problem.
The Gabions were constructed by a local broad-based black economic empowered (BBBEE) company, which employed only local people. The majority of the people employed were unskilled women.
The project had a total funding of R909166 and employed 24 people. 
Some of the women involved in the project were able to use their newly acquired skills to start their own businesses or find employment.
    
3.4 Overview of the Role of the Development Bank of Southern Africa (DBSA) in Water and Sanitation projects in the Northwest 

The Development Bank of Southern Africa (DBSA) reiterated its commitment to drive Socio-Economic Reconstruction and Development in the North-West Province through its support of projects which aim to improve access to basic services, eradicate poverty, decrease unemployment and address underdevelopment. The DBSA is visited the Province to renew a Memorandum of Cooperation with the North-West Provincial Government and the signing of the new Memorandum coincided with an oversight visit by the Portfolio Committee on Water and Forestry and the Select Committee on Finance.

To date, DBSA has invested over R2.8-billion to fund more than 30 projects in the North-West Province. Of the above amount, R282.2-million has been invested in sanitation and R378.7-million has been spent building and upgrading roads.  DBSA combines its investment support with technical assistance grants to ensure sustainable development outcomes. Within the North West, R8.7-million in technical assistance grants has been provided for more than 60 projects.  Grant funding is also channeled through the DBSA Development Fund to help build financial, institutional and technical capacity in municipalities and other government departments. Since 2002, the Development Fund has approved R22.5-million for 32 projects in the province. The Bank has also been involved in various knowledge-sharing initiatives both at provincial and municipal level. For instance, DBSA assisted with the formulation and implementation of the North West Provincial Growth and Development Strategy (PGDS).

3.4.1 Findings and Issues raised

Recent projects funded by the Development Bank of Southern Africa included the following projects: 

For the eradication of sanitation backlogs (R100 million).

The development of Magalies Water bulk infrastructure (R149, 5 million).
Taung Flood Disaster Programme (R500 thousand)

Ventersdorp Land Use Management Scheme (R380 thousand).
Merafong Resettlement Programme (R40 million).
Klerksdorp refinancing of capital (R65 million).
The extension of the Ventersdorp municipal office building (R2, 4 million).
Moses Kotane Street Lighting (R5 million).


The DBSA’s Siyenza Manje programme, a project aimed at supporting the Sanitation Programme included, especially the bucket eradication programme, is being implemented in the following areas:

Mamusa
Maquassi Hills
Lekwa-Teemane
Tswaing
Ditsobotla

The recently signed memorandum of understanding (MOU) between the Northwest Provincial government and the DBSA will have a tremendous impact on the eradication of water and sanitation backlogs in the Northwest Province. One of the primary key involvement areas for the DBSA is in the area of improving sanitation services, and communities stand to benefit from the agreement.    

3.5. Overview of the Greater Taung flood disaster 

The western part of Greater Taung Local Municipality (GTLM) has been in various level of flood since 20 February 2006. Between January and June 2006 the area received an average of 1380 mm of rain, which is far above the average yearly rainfall of 418-mm. The most affected areas were:

Takaneng

Qhoe
Gasebusho
Vaaltein
Letlhapong
Ntswanahatshe
Maganeng
Khaukhwe
Matlapeng
Choseng
Tamasikwa
Loselong

The flood caused substantial damage to infrastructure and disrupted the socio-economic activities of the area. In summary, approximately, 3 328 households were affected by the flood and more than

700 households continue to live in emergency tents. It is estimated that 1032 houses collapsed or suffered serious structural damages. The cost of replacing damaged houses is estimated to be R73 million, through the Peoples Housing Programme. Currently, the North West Department of Housing has approved the construction of 2000 houses.

The Tamasikwa Bridge was swept away by the flood and will have to be rebuilt.  Moretele, Matlapaneng and Choseng bridges are not accessible and must be rehabilitated (access resurfacing). Approximately 60 km of rural road needs to be rehabilitated. The Reivilo-Lykso road has been seriously damaged and will need to be reconstructed (most of the road was under water). The cost to repairing the road infrastructure in the Greater Taung Local Municipality is estimated to be less than R 41 million.

Water supply in the affected villages had been polluted increasing the cases of diarrhea and other water-borne diseases. Since then, measures have been taken to educate the local populations how to decontaminate their drinking water. Water sources in the Vaaltyn, Tamasikwa and Letlhapong areas were found to have been polluted by E-coli and other coli forms. Sedibeng Water has introduced measures to provide safe portable water including providing the service of water tanks in the affected areas. Most water quality problems have been resolved.

The rural farming areas have been severely affected (approximately 54 horses, 43 cattle, 31 goats and 145 sheep have died). Commercial areas have lost 117 cattle, 24 horses 395 sheep and 17 goats. Animal diseases are wide spread and foot rot amongst sheep is particularly a problem. The department of Agriculture incinerated dead carcasses, as a way of avoiding potential health Hazards. Irrigation pivots along the Harts River were flooded causing millions of Rands of Damage.

3.5.1 Findings and Issues raised

A plan to relocate communities away from flood prone areas was drafted and integrated in the spatial development framework (SDF) of the local municipality. Alternative land has been identified.

Plans are currently underway to address the reconstruction of roads and bridges and other damaged infrastructure. Some projects have already begun.
The Greater Taung Local Municipality received 86 beds and 400 blankets as a donation for those households that were severely affected. The local municipality has since decided to retain the 86 donated beds. The aim is to hand them over when beneficiaries receive new houses.
Approximately R 1, million was donated into the GTLM Disaster Fund, including a R500 000 donation from DBSA. The funds will be used to fund repairs to infrastructure and provide relief to those families that need follow up relief in the form of bedding and food.


3.6. Site visit to the Qhoe housing project

The village of Qhoe is one of those that have been severely affected by the flood. According to a local traditional leader, the community has not recovered from the damage caused by the flood. Apart from lack of shelter and housing to most members of the community, access to clean drinking water remains one of the most significant challenges in the community.

3.6.1 Findings and Issues raised:

The houses that were being built in Qhoe were part of the 2000 flood relief houses to be built.

The delegation raised concerns that the houses were very small and may not accommodate an average rural family.  Apart from the size of the houses, the stands that were built were also too small and may impair future expansions of the houses and the development of in-the-yard substance farming (i.e. vegetable gardens).

Concerns were raised on issues around the integration of sanitation and water services in the housing project. The housing project did not address the problem of access to water for the new prospective occupants nor did it address the issue of sanitation.

Concerns were also raised about the quality and durability of the houses and the role of the Department of Housing in the area of quality control. The delegation observed cracks on some of the drying house foundations and questioned the durability of the structures.       
The Mayor MS Boitumelo Mahlangu indicated that the Province is building the houses. As a result the municipality is not aware of the service arrangements being planned for the area. 

It became clear that the Peoples Housing Process is not being followed, as the community was only involved as workers. The Chief also raised concern at the payment rate of the members engaged in the project.

The manner in which the project was conducted compromised delivery of services in that it was not aligned to the IDP or WSDP of the municipality.

Disaster Management Committee coordinated from Bophirima District was of great help to the community in the floods. The information from the Director of municipality was very sound, and it is clear that this service need support.

The delegation raised a concern that that the area was declared a disaster area only after the incident of woman that was trapped in the floods and lost a baby on the way to hospital. DWAF and PDLG need to work to ensure that the processes of declaring disaster in times of floods and veld fire are more standard and situation should not be left till crises proportion before communities can be helped.


3.7 Presentation by the Vaalharts Water User Associations

The Vaalharts Water User Association was established in 2001. The Minister approved the constitution of the Water User Association and certain powers and duties in terms of the National Water Act have been delegated to the Vaalharts Water User Association. The principle function of Vaalharts WUA is to supply bulk raw water in the most economical way, according to the lawful entitlement of all water users, within the borders of the operational area of the Association, with the least possible losses and disruptions. The Association does not supply purified water to any water user, but supplies raw water to Water Service Authorities such as municipalities. The Association does not supply any sanitation infrastructure or services. Irrigation water represents 96. 2% of the total amount of water supplied by the Association, and Industrial and Household water, 3.8%. This forms the basis of the Association’s income.


3.7.1 Challenges and issues raised

The infrastructure (irrigation canals, storm water drainage canals and appurtenant structures) is more than 60 years old and enormous amounts of monies are needed for maintenance and refurbishment.

The infrastructure is well monitored to avoid disruptive failures, and to curb water losses as far as possible. The fragile financial well being of the Association is closely linked to the volatile agricultural environment from where its revenue comes from (96.2% of its water sales).
No major growth is expected within the borders of the Association’s area of operation, and henceforth growth in revenue will mainly be in raising the water tariff. This, on the other hand, can only be done if it is affordable to the water users.

Emerging farmers receive minimal support and assistance, however DWAF indicated that the subsidy for emerging farmers is available. However this support is limited due to the fact that the redundant Provincial Department of Agriculture was not able to offer support.

Farmers also mentioned that the fees they have to pay are high because they also have to pay TCTA.

3.8. Overview of water and sanitation in the Lekwa-Teemane municipality area

In February 2006, there was an outbreak of cholera in the area and 1273 people were treated for the illness. The main source of the outbreak was established to be from polluted water that was originating from the Bloemhof water purification plant. The water was found to be high in turbidity and also contained various pollutants. To remedy the situation, Sedibeng Water was requested to assist the Municipality with monitoring and water quality management until qualified plant operators for both Bloemhof and Christiana are appointed next year (2006/7). The involvement of Sedibeng Water has significantly improved the standard and quality of water purification processes in the Bloemhof water purification plant.    

3.8.1 Challenges and issues raised:


The outbreak was caused by sewage leakage that was flowing into the Vaal River raw water abstraction point. At the time of the leakage, the raw water abstraction point was not protected and there was very little quality control measures undertaken in the Bloemhof water purification plant.

Lack of resources and qualified technicians was cited as some of the most significant challenges affecting the operation of the Bloemhof water purification plant. 

It was indicated that the Department of Water Affairs, Sedibeng Water and local government structures have collaborated in the effort of drafting emergency plans to address the situation in Bloemhof.

A bucket eradication programme is being implemented in the surrounding areas under the local municipality.

3.9. Presentation on progress on the establishment of Catchment Management Areas (CMA) and Water User Associations (WUA)

3.9.1. Crocodile/Marico Catchment Management Area

Nine forums were established to support the public participation process.
A coordination and liaison committee was formed.
Business units and theme teams were formed in each forum.
The CMA proposal was completed in October 2002, approved by the Minister in 2004 and gazetted in September 2005.
The Advisory Committee was established in 2006 and the Governing Board will be in place by the end of March 2007.
The CMA will be functional in 2008. 

3.9.2 Upper Vaal CMA

Public participation forums have been established.
The establishment process of the CMA will start in 2007/2008.
The Governing Board will be appointed in 2009/10.

3.9.3 Middle Vaal CMA

The Klerksdorp, Orkney, Stilfontein and hartebeesfontein (KOSH) forum was established in 2006/07.
The CMA proposal will be submitted in 2007/08 and the Governing Board will appointed by 2010.

3.9.4 Lower Vaal CMA

The establishment process for this CMA started in 2004 and two reference groups, Molopo and Vaal/Harts, were formed.
The proposal will be submitted to the Minister in 2008 and the Governing Board will be appointed in 2009/10.

3.9.5 Progress made on the establishment of WUAs

In the Crocodile/Marico area, 22 irrigation boards were transformed into new WUAs.
For the Upper Vaal area, 5 irrigation boards are in the process of being transformed into two new WUAs.
In the Middle Vaal area, one WUA has been formed, one irrigation board is the process of being transformed and one Government Water Scheme (GWS) is also in the process of being converted into a WUA. 
For the Lower Vaal, one irrigation board is in the process of being disestablished, four WUAs have been established since 2004 and two more WUAs will be established. 

3.9.6 Issues raised:
   

The delegation enquired about the representation and participation by emerging farmers in the formation of Water User Associations. The participation of resource poor farmers, especially women, in the transformation of irrigation boards and formation of WUAs was emphasized.
The newly established WUAs face various challenges. Most WUAs do not have the capacity in terms relevant skills and resources to provide adequate services to their members.
Lack of support from the dysfunctional Provincial Department of Agriculture has a tremendous negative impact on the functioning of the WUAs.
Lack of participation or involvement by local councilors has resulted, in some cases, in minimal participation by local communities, especially emerging small farmers.    

3.10. Visit to the Bloemhof water purification plant 

The delegation took a guided tour of the Bloemhof Water Purification Plant, including the Vaal raw water abstraction site. The Bloemhof Water Purification Plant receives water from the Vaal River through a collection sump in the river. The capacity of the plant is 13 million litres per day.


3.10.1 Challenges experienced in the plant:     

The raw water abstraction point is situated downstream of a sewage pump station which continuously overflows due to technical problems. The sewage overflows from the pump station into the Vaal River and into the abstraction point. As a solution, the Department of Water Affairs and Forestry and other stakeholders have developed an action plan to address the problem.

3.11 Overview of water and sanitation in the Bojanala Platinum District Municipality

The total estimated population of the Bojanala Platinum District Municipality is approximately 1 185 329 million people consisting of 333 740 households. This implies an average household size of approximately 3.7 people per household.  The largest number of households within the district resides in areas classified as dense rural settlements (112 769) and rural villages (94 634).

 The total number of households residing in urban settlements is approximately 84 000.
The population growth in the rural areas is estimated at 1.01 % and in the urban areas as 1.64 %.

Approximately 68% of these residential consumers receive water above the minimum RDP standards and 32% below.

Nearly 90% of all residential consumers units in the urban areas within the District receive water services at minimum RDP standards.

The proportion of consumer units receiving water below RDP standards varies between 38.6% in the case of rural villages, 42.9% in dense rural settlements to as high as 58.9% in scattered settlements.

Table
4

Municipality

No. of  households below RDP

% Households below RDP

Moretele

20 838

50 %

Madibeng

28 547

32 %

Rustenburg

33 081

28 %

Kgetleng Rivier

1 981

20 %

Moses Kotane

21 967

36 %


Table 4.  Households receiving water below minimum RDP Standards

Table
5

Municipality

No. of households below RDP

% Households below RDP

Moretele

37 388

87 %

Madibeng

62 392

68 %

Rustenburg

53 346

68 %

Kgetleng Rivier

3 465

45 %

Moses Kotane

42 649

69 %


Table 5.  Households with sanitation below minimum RDP Standards


Approximately 61% of residents receive sanitation at levels below the minimum RDP standards
Only 24% residents in the district have got access to a sanitation system which discharge to a water treatment works. In the urban areas 84 % of residents have access to sanitation facilities above RDP standards.

All five local municipalities in the District are authorised Water Services Authority (WSA):

Moretele Local Municipality receives its bulk water from Tshwane Metropolitan Council.

Madibeng Local Municipality receives its bulk water from Rand Water.

Rustenburg Local Municipality receives bulk of its bulk water from Magalies Water and Rand Water.

Moses Kotane Local Municipality receives its bulk water from Magalies and Botshelo Water.

Kgetlengrivier Local Municipality has its own bulk supply (dam).

3.12 Presentation on the Rustenburg Water Services trust

The rapid growth in and around Rustenburg, in the North West province, mainly caused by increased mining activities, has led to the sewage-purification works becoming overloaded. Approximately 40% of households in the municipal are have below RDP level sanitation, with most of these households using conventional pit-latrines. Rustenburg local municipality appointed the Mati ya Vanhu Consortium, comprising Bigen Africa, ABSA bank and Magalies Water, as its partners to solve the problem by refurbishing and upgrading the existing sewage-treatment works from 22 Ml/day to 24 Ml/day and the upgrading and refurbishing of the Bospoort water-purification works to allow it to cope reliably with the water quality of the dam.

The three-phased sewage-treatment portion of the project involves the building of a new 15 Ml/day activated sludge unit, designed for full biological nutrient removal in phase one and completion is scheduled for May 2006. Upgrading of the existing 10 Ml/day activated-sludge units to treat 15 ml/day, also with full biological nutrient removal, will be completed by November 2006. Phase three, which will be completed by July 2007, involves the refurbishment of the existing 12 Ml/day biological filter plant to regain full functionality. The sludge management of the plant will also receive attention. The refurbished water-purification works at Bospoort will be able to accommodate and treat the eutrophic water in the Bospoort dam. The existing sedi-mentation tanks will be preceded by a new dissolved-air flotation process, sedimentation tanks will be changed from gravity tanks to sludge blanket settling tanks.

The Rustenburg local municipality did not have the financial means to fund the upgrade, and therefore the consortium proposed the establishment of a business unit, the Rustenburg Water Services Trust, to implement the refurbishments. The legal status of the trust is that of a municipal business entity and funding was obtained from the ABSA bank. The R280 million debt, over 18 years, is serviced by selling effluent to the mines as process water, selling potable water from the Bospoort water-purification works to the municipality at current Rand Water tariffs and charging the municipality a tariff for sewage treatment. The combined income stream is sufficient to service all of the trust’s debt as well as its operational and maintenance requirements and any surplus funds will be allocated to the municipality to expand the water services.

Magalies Water, as a third partner of the team, will be responsible for the operation and maintenance of all facilities and it will also take over the existing municipal water laboratory from the Rustenburg local municipality and incorporate it into its larger operation centralised at the Vaalkop water-purification plant. The project will bring a number of advantages to the Rustenburg area, and the mines especially will benefit from a reliable supply of industrial water.


3.12.1 Concerns raised by the delegation:

While the delegation applauded the formation of the trust, concerns were raised about the long-term affordability of water by poor communities, as there is no guarantee that the trust will continue, in the long-term, to provide water at affordable rates.
Concerns were also raised about the impact that the Trust might have on borrowing capacity of the Municipality.  
Water loss due to leakage remains a problem for the Rustenburg Local Municipality; however plans are underway to remedy the situation.     

3.13
Presentation on the Control Veld and Forest fires

The objective of the National Veld and Forest Fire Act (101 of 1998) is to prevent wild veld and forest fires. The Act puts the responsibility of fighting fires on landowners. The Act is implemented attentively to other related Acts such as the Disaster Management Act (57 of 2002) and the Fire Brigade Act (99 of 1987), which are administered by the Department of Provincial and Local Government.

A Fire Protection Association (FPA) is a voluntary organization formed by landowners and a local municipality for the purpose of fighting veld and forest fires. All governments departments managing state land within the boundaries of a Fire Protection Association should also be members.
 A Fire Protection Association has to be registered for a year before it is required to submit an annual report and its effectiveness evaluated.

Three Fire Protection Association have recently finished their first one-year circle and will be assessed on the 21 and 22 August 2006, and they are:
 
Kgetleng River Fire Protection Association,
Moses Kotane Fire Protection Association
Potchestroom Fire Protection Association,

A training plan for Fire Protection Associations the 2006\7 financial year has been developed and is ready for implementation.

3.13.1 Challenges experienced:

Staff Shortages in the Department (DWAF) to deal with FPAs. 
No dedicated officials to implement and ensure compliance.
Structural problems within FPAs.
Information and Knowledge management
Resistance by land–owners to form FPAs
Exclusion of some land-owners
Fires incidents not reported
Funding of FPAs
Institutional arrangement of FPAs

3.14 Site Visit To Magalies Water Purification Plant 

The delegation took a guided tour of the automated Magalies Water Purification Plant.  Various mechanical and technical improvements were made to enhance the performance of the plant. 

3.14.1 Issues raised by the delegation:

The delegation noted that the plant was operated by a single person and was not labour intensive. The automation of the Plant has resulted in few people being employed in the Plant.
In the view of the shortage of technical skills in the area of hydrology, the Plant presents an opportunity for skills development and learnerships, especially for the youth.   

3.15 Overview of Water and Sanitation in Madibeng Municipality

The Madibeng are receives water from the Brits Water Purification Plant and the Haartebeesport Water Purification Works. The quality of water is tested every month at the Magalies Water laboratory. There are four sewage treatment plants in the area:

Brits water treatment plant (capacity of 8 million litres, it is being upgraded to 16 million litres).
Mothotlung (capacity of 2.4 million litres).
Letlhabile (capacity of 4 million litres).
Rietfontein (capacity of 1.8 million litres).

Urban residential areas in Madibeng have a level three access to water services. However, most households in the rural areas face challenges with regard to access to water and sanitation services. Currently, the municipality has undertaken a project to supply water to 10 000 and 3200 households in Mmakau and Bapong respectively. Approximately 20 232 households receive water below RDP level. The number of households using the bucket system is estimated at 20 000.       

3.15.1 Challenges

The current Municipal Infrastructure Grant (MIG) is not sufficient to address the current backlogs in water and sanitation.
The Brits Water Purification Plant needs to be upgraded to cater for the growing water demand in the Madibeng area.

3.16 Overview of Hartbeespoort Dam Pollution

The Hartbeespoort Dam is the oldest Government Irrigation Scheme in South Africa. The dam has a catchment of 4112 km², which is drained by the Crocodile River and its tributaries, the most important of which are the Jukskei, Hennops and the Magalies Rivers.  With a mean annual rainfall of 685mm, the initial runoff to the dam was estimated at 163 million m³. Since 2000, this volume has already doubled due to the development in the catchment, which resulted in increased run-off and return-flows from wastewater treatment plants. The shoreline of the dam when is full is approximately 56 km long and the surface area 2 062 ha.  The average loss by evaporation is 25 million m³ (25 000 Ml) per annum.  Two main irrigation canals the North and East (30 km and 48 km respectively) and West (56 km) both have capacities of 8.5 m³/s.  The total length of branch canals is 532 km, which serve a farming community of 14 665 ha (12 952 ha lined furrows & 1 713 old furrows). Recently mining activities are also supplied with industrial water

The operation and maintenance of the irrigation system to address algal growth in the channels is extremely costly and not very effective. Chemical dosing with sulphuric acid and copper sulphate and biological control with Chinese carp are also in use. However, the algae are mostly removed mechanically, which is very labor intensive. Due to the age of the scheme, the maintenance cost is also extremely high, and the loss in the system is as high as 40%.  Due to rapid development upstream of the dam (i.e. Johannesburg, Ekurhuleni and Tshwane Metro) the volume of water, which also adds to the increasing load of pollution that reaches the dam, have dramatically increased. The trend will most likely continue in future as the urban areas are expected to grow. In the presence of other environmental factors such as low rainfall and warm windless weather conditions, excessive growth of algae, such as the potentially toxic blue-green algae, and waterweeds (hyacinth) occurs. Apart from appearance, unpleasant odors and taste in domestic water also occur, with associated toxicity.

Madibeng Local Authority is a Water Services Authority that purifies water from the dam for domestic supply to communities around the dam, Brits and further north. However, to sustain the development around the dam, expensive water from Rand Water will in future be imported into this area. A pipeline is presently under construction for this purpose.

3.17 Site Visit to the Brits Water Purification Plant

The delegation took a guided tour of the Brits Water Purification Plant. The issue of the Plant’s aged infrastructure was raised by officials as it impedes the effective operation and performance of the purification plant.   

Issues raised:
 

Most of the water purification and sewage treatment plants in the area have reached their capacity. The Madibeng Municipality is struggling to raise funds to maintain these water and sanitation works.
It was noted that water from the Hartebeespoort Dam is costly to purify due to the extreme level of pollution in the water. 
The delegation highlighted the need for the municipality to speedily deliver basic services to the poor, especially those in the rural areas.

CHALLENGES

Transfer agreements, transfer of assets, staff and schemes in all provinces need to be monitored to effect completion. Progress on section 78 assessments and decisions by municipalities on provider options is slow, but needs assistance from DWAF, Water Boards, etc.

The changes in institutional roles and responsibilities brought about by completion of the Local Government transformation process and the Strategic Framework for Water Services must be supported by effective and efficient institutional support. It is important to ensure that the institutional reform processes contribute the increase of water services delivery.

Successful implementation of the Strategic Framework for Water Services will depend on effective institutional arrangements; this necessitates institutional reforms to make sure that water services institutions are best positioned to achieve the vision and goals of the SFWS. Other aspects that must be addressed include assessment of water quality and quantity, replacement of old infrastructure and implementation of free basic water and sanitation policies in all municipalities. The national government has set targets for clearing the water service backlog, namely, access to functioning basic water supply infrastructure for all by 2008, access to basic sanitation facilities for all by 2010 and implementation of the free basic water policy in all municipalities by 2005.


Much more investment need to be made with regards to forestry, working for water, building of dams and other projects as economic developing tools to address the poverty in the Limpopo Province.

4.5.       Water Backlogs 

Approximately, 56% of the population depends on regional or local bulk water distribution systems and close to 0,92 million people are below RDP water level.

 Water needs represent 26% of the total population. Basic water supply backlog has almost halved in the last 10 years from 46% in 1994 to 26% in 2005. There is an urgent need to address the remaining 26% in less than 3 years to achieve government’s target of 2008. The cost to eradicate basic water backlogs in the province is currently estimated at R 1.013 billion, with an annual funding of not less than R338 million.
There is a growing concern about the sustainability of water services infrastructure due to limited considerations of operation and maintenance costs. The Northwest Province might not meet the 2010 target.


4.6. Sanitation Backlogs

On sanitation, approximately 1,94 million people are below RDP sanitation level and there is still 26 000 with bucket systems (2% of population). The total number of people using unimproved pit latrines is estimated to be around 1, 872 734 million with unimproved pits (52% of population). The total sanitation needs represent 54% of the population in Northwest. The sanitation backlog has only been reduced by 10% in last 10 years. The cost to eradicate basic sanitation backlogs in the province is estimated at R1,3 billion (to replace unimproved pits with VIPs), with an annual funding of not less than R260 million.

Although considerable strides have been made, the eradication of the bucket system remains a challenge. A part from lack of funds, the problem is aggravated by lack of reliable information and statistics on backlogs and the mushrooming of new informal peri-urban settlements, which makes it difficult for municipalities to plan and budget effectively. 


4.7. Water Resources Management

There are limited surface water sources within the Province, only six major dams and the province depends on water from the Vaal River. Water resources will be increasingly stressed in future due to the increased demands from mining and increased population growth that will result especially in Bojanala Platinum District Municipality. 


4.8 Water Services Transfers

4.8.1     Outstanding water services transfers need to be monitored.  All necessary issues such as transfer agreements, transfer of assets, staff and schemes in all provinces need to be monitored.

4.8.2     Progress on section 78 assessments and decisions by municipalities on best provider options is slow, but needs assistance from DWAF, Water Boards, etc.

The monitoring of compliance with transfer agreements, and the ability to intervene and provide support, where necessary is complex.  However, the relevant stakeholders have to begin assisting in this process.

A number of challenges have emerged in terms of the funding associated with the adequacy of DWAF’s budgeted funds, the financial burden on local municipalities once the conditional grant is consolidated into the equitable share, and continuing low levels of cost recovery.  Municipal Infrastructure Grant projects (MIG) need to result in efficient, effective, equitable, economical and sustainable services.

4.9. The Municipal Infrastructure Grant (MIG) and sanitation targets and sustainability

Whilst Government has committed itself to eliminating the sanitation backlog by 2010, the programme is not on track in many cases due to a lack of funding, lack of implementation capacity, and the fact that the speed of delivery actually decreased during the first year of the MIG.  In many municipalities, Project Management Units (PMUs) were established months after the start of the year, and as a result, the procurement of service providers was delayed.

There were problems in many municipalities with merging DWAF and Consolidated Municipal Infrastructure Programme (CMIP) project lists and budgets, and in several municipalities, budgets for rural sanitation had to be cut due to the magnitude of prior CMIP budget commitments.  Even once programmes got underway, bureaucracy and mismanagement in certain municipalities caused payment delays and consequent slowing down of delivery. Systematic research should be undertaken in all municipalities to engage with how the processes to address financial issues are addressed, progress made and solutions that have been utilised.

Government policy on how on-site sanitation should be implemented to involve households to take ownership of their infrastructure, ensure sustainability and maximise local economic benefits is laid out in the Strategic Framework for Water Services (2003), DWAF guidelines and MIG policy documents.  However, in practice, approaches not only vary widely between municipalities and provinces, but also in many municipalities, knowledge of policy of are almost non-existent.  In these cases, technical managers base their implementation approaches on standard civil engineering models, which are highly inappropriate for on-site household sanitation.  Toilets are being built at costs that exceed the DWAF guidelines, little or no institutional and social development work is being done, little or no user education or hygiene education is being provided, and the local economic benefits are minimal. 

The sanitation backlog is still extensive and current rate of eradication is too slow. Implementation capacity needs to be enhanced.  Water backlogs might be affected by eradication of bucket systems with waterborne sanitation. The replacement of the bucket system with waterborne sanitation will increase the demand for water and as a result increase the backlog on water services for the poor. Thus, water requirements of the remaining backlog and higher levels of sanitation must be assessed by comprehensive feasibility studies.

A number of challenges have emerged in terms of the funding associated with the adequacy of DWAF’s budgeted funds, the financial burden on local municipalities once the conditional grant is consolidated into the equitable share, and continuing low levels of cost recovery.  Municipal Infrastructure Grant projects (MIG) need to result in efficient, effective, equitable, economical and sustainable services.

The MIG, in the first year and half of its inception, reflected sanitation delivery for rural areas, as being problematic.  Whilst Government has committed itself to eliminating the sanitation backlog by 2010, the programme is not on track in many cases due to a lack of funding, lack of implementation capacity, and the fact that the speed of delivery actually decreased during the first year of the MIG.  In many municipalities, Project Management Units (PMUs) were established months after the start of the year, and as a result, the procurement of service providers was delayed.

Water and Sanitation needs of associated services have to be addressed (e.g. schools and clinics). Municipalities must improve the water metering, billing and cost-recovery systems and mechanism to improve the funding capital of basic services.


The lack of accurate and consistent information on backlogs was identified as one the key challenges that negatively affects the planning process.  Most of the information and statistics on water and sanitation backlogs are outdated and in some cases underestimated.  There is a need for accurate and timeously updated information to ensure proper planning and effective budget allocations.


The changes in institutional roles and responsibilities brought about by completion of the Local Government transformation process and the Strategic Framework for Water Services must be supported by effective and efficient institutional support. This may require changes in the current institutional arrangements for water services delivery so that they can provide an enabling environment for the delivery of water services within the new policy and legislative context.

The national government has set targets for clearing the water service backlog, namely, access to functioning basic water supply infrastructure for all by 2008, access to basic sanitation facilities for all by 2010 and implementation of the free basic water policy in all municipalities by 2005. It is important to ensure that the institutional reform processes contribute the increase in the efficiency and cost-effectiveness of water services delivery. The change in institutional roles and responsibilities for water services creates major challenges at national and provincial government levels such as a need for effective sector regulation, monitoring and evaluation of the sector performance. At municipality level, the challenges are more complex, for example, there is a need to strengthen the capacity of municipalities to manage large infrastructure projects and ensure effective operation and maintenance of water and sanitation infrastructure.

The S78 assessment is a relatively short-term process that results in decisions with long-term consequences.  Once the decision is taken, it must be implemented.  Risks regarding implementation must be kept in mind when assessing options.



CONCLUSION

The Department of Water affairs and Forestry developed a checklist to provide both municipalities and DWAF with primary information on water services authority capacity, and its performance against legislative requirements.  The focus is on the following WSA functional areas:  policies and by-laws, planning, reporting, infrastructure, finance, health and environment and regulating water services provision. 

The Water Services Act gives DWAF the mandate to monitor the performance of all water services institutions to ensure compliance with all applicable norms and standards, and to promote improved sector performance.

It is important for water service authorities to ensure proper integration and alignment between their WSDPs and IDPs, in order to overcome the many challenges with regard to planning and management. 

As with most areas of service delivery, there have been successes and examples of good practice in some municipalities.  However, the overall view gained on this oversight visit, is one of slower than expected delivery. This is coupled with implementation approaches that frequently do not maximise job creation and skills development opportunities for beneficiary communities. The result of current practices is unsustainable services.

The committee resolved to raise the concerns of the communities with the district and local municipalities and discuss it further in Parliament.

6 RECOMMENDATIONS

It is against the above information that detailed recommendations will be provided.

6.1        Whilst government has made strides in beginning to deliver water resources and infrastructure thereof, a major challenge exist still around equal access to water.  Thus a concerted intervention is required led by DWAF to assist municipalities to ensure that communities in particular, gain access to clean drinking potable water using the relevant finances that have been approved, expediting reticulation processes where resources have been exhausted, providing skilled human resources to municipalities. To also apply the water reallocation process where communities are without clean drinking water. To also assist municipalities to spend monies allocated for drought relief where access to no water occurs.

In many municipalities, sanitation programmes are being run in accordance with government policy, with great success.  It is therefore recommended that in order to appoint sanitation programme implementers, unit-based rates tenders for project management services, not traditional engineering consultants’ tenders are required. 


Process should be seen as an opportunity to strengthen a sound working and cooperative relationship in supporting the development of good governance in the water services sector.  This compliance checklist, if captured correctly, could be used as a powerful tool to indicate areas that need urgent attention by the municipality, DWAF and other sector players.  Support and intervention strategies could be devised to look at implications of non-compliance and impact on service delivery.

A study to provide support on enhancement of WSDPs and implementation of section 78 of the Municipal Systems Act should be undertaken in all provinces.

Involvement of communities in water, sanitation and forestry is a requirement of the National Water Act and Forestry Act. To this end communities should be involved so as to impart their indigenous knowledge on water, sanitation and forestry. If not done, community development workers need to be trained on water and forestry so as to empower communities, allow them to take ownership and bring an end to vandalism of water resources and to monitor and attend to water quality issues, services etc.

Feasibility studies must address all sustainability aspects, including operational financing, viability, operating capacity, skills audits, customer affordability, cost-recovery strategies, maintenance plans, etc.


Successful implementation of the Strategic Framework for Water Services will depend on effective institutional arrangements; this necessitates institutional reforms to make sure that water services institutions are best positioned to achieve the vision and goals of the SFWS. Other aspects that must be addressed include assessment of water quality and quantity, replacement of old infrastructure and implementation of free basic water and sanitation policies in all municipalities.

Municipalities are making key decisions about service provision arrangements in keeping with Section 78 of the Municipal Systems Act.  The decisions made through the process have far reaching implications for effective, efficient, sustainable, affordable water services. It is important that the knowledge gained from municipal experience is documented and shared so that WSAs can learn from each other, replicate good practice and avoid making similar errors.

An assessment of the state of WSDPs and IDPs in the country should be undertaken, and to enable municipalities to show what they have achieved, and point out what is frustrating their actions in the intergovernmental system. This needs to be an ongoing process.

Proper integration and alignment of Water Service Authorities’ WSDPs and IDPs, in order to overcome the many challenges with regard to planning and management. A study to provide support on enhancement of WSDPs and implementation of section 78 of the Municipal Systems Act should be undertaken in all provinces, as undertaken in the Western Cape in 2004.

An urgent operation and maintenance process should be initiated where schemes, boreholes and other relevant resources that are inoperable are prohibiting communities to gain access to water.

DWAF to provide speedier assistance towards municipalities in overcoming water quality challenges that prohibit all to gain access to clean, safe drinking water including those caused by sanitation through VIP’s.

DWAF to obtain certainty from the Department of Environment and Tourism about bringing the delay of the construction of the Asgisa  project, the De Hoop Dam to a close so as to allow further augmentatation to much needed access to water for various uses.

DWAF together with SALGA to engage with the Department of Public Works in handing over the water scheme to the relevant Water Service Authority in Mopani. Also DWAF to finalise the sec 78 application of the Mopani Municipality.

DWAF and relevant municipality to engage further with the authorities of the Kruger National Park to bring consensus on all the water related issues, forestry and working for water programmes; as well as investigating whether any attention needs to be given to the neighbouring areas with regards to any access in an equitable manner of water.

A provincial strategy supported by DWAF, SALGA, municipalities and the Provincial legislature to overcome the vandalism of water resources and infrastructure by communities.

Waterboards be more involved in ensuring that service delivery obligations are met through providing skills, financial support and an intergrated approach towards government’s objectives of eradicating the backlogs in water sanitation.

An investigation to be held into the Vhembe District by DWAF supplying water allegedly only when the Portfolio Committee arrived.

DWAF together with The Department on Mineral and Energy to look into the issue of sand mining, its licensing and its effects on water resources.

6.20      It is recommended that the Minister of Water Affairs and Forestry liaise with the Lebohang Gweriri district and local municipalities to ensure that the new borehole is speedily relocated.


Ms C C SEPTEMBER, MP