THE TRANSFORMATION OF AQUATIC SPORT IN SOUTH AFRICA
(as accepted at the Presidents Bosberaad in Johannesburg 2-3 October 1999)
CONTENTS
*EXECUTIVE SUMMARY
*BACKGROUND
*INTRODUCTION
*REVIEW OF RELEVANT STATE POLICY FOR SPORTING TRANSFORMATION
*FEATURES OF THE AQUATIC SPORT SECTOR WITH REGARDS TO TRANSFORMATION
*CONSEQUENCES OF THE FAILURE TO TRANSFORM
*PROBLEMS TO BE ADDRESSED IN TRANSFORMATION
*INTERVENTION
*OVERALL OBJECTIVES AND VISION
*PROJECTS AND PROJECT PURPOSES
*PRE-DETERMINED RESULTS AND ACTIVITIES
*ASSUMPTIONS
*PROJECT MATRICES
*IMPLEMENTATION
*ORGANISATION AND PROCEDURES
*COST ESTIMATE AND FINANCIAL PLANNING
*FACTORS ENSURING SUSTAINABILITY
*POLICY SUPPORT
*FEE STRUCTURE
*INSTITUTIONAL AND MANAGEMENT CAPACITY
*MONITORING AND EVALUATION
*MONITORING INDICATORS
*REVIEW AND EVALUATION
*CONCLUSIONS AND PROPOSALS
*
Over the last several years it has become apparent among all involved in South African sport, that the majority of South Africans still do not have access to the resources necessary for their sporting and recreational development. This is more acute in the aquatic sporting disciplines, primarily because of the major dependence on material resources such as facilities. Attempts by the key national organisations to promote and develop the discipline has largely brought little results. Recognising this, Swimming South Africa, now fully representative of all previous national aquatic organisations in the country, has embarked on a renewed campaign to promote aquatic disciplines.
A special task team was established to review the problems and present the organisation with some concrete measures in which to take the organisation into the new millenium. The proposals of the task group which was accepted at the Presidents Bosberaad on 2-3 October 1999, are presented in this report.
In order to meet the challenges facing the organisation, transformation of the structures and direction is necessary. This was identified as the key problem, arising from a number of fundamental causes. These causes are human resource, grassroots development and competition related. On the basis of this analysis of the problem, the vision of the organisation was identified as being transformation of aquatic sport, catering for the needs of the majority of South Africans and the redress of inequity created by apartheid imbalances. To meet this vision, three interventions (projects) were proposed. These were: human resource development, grassroots development and an increase in black athlete representivity at all senior competitions and teams of the organisation. It is expected that each of these projects will
Each of these projects were developed with specific results (end points) in mind – each of which in turn are achievable through a programme of activities. Each of these are conducted by a responsible agency within the organisation and measurable through a set of indicators.
The timeframe for the overall purpose of the projects are stipulated as over a period of 12 months, however, activities have a time schedule which will allow for the monitoring of responsible agencies at more regular intervals. These agencies are (from top): the National Executive, National Boards, National Development Board/Council, the Telkom LTS Programme, the National Director for Coaching, the provincial Executives, the Provincial Boards and the provincial Development Councils. The monitoring and evaluation structure that is proposed is referred to as the Transformation Monitoring Council, consisting of individuals who report directly to the Executive, or in its absence, the Management Committee.
Aquatic sport in South Africa has for a considerable period failed to reach the majority of South Africans. Based on these concerns, Swimming South Africa, following the recent unification with the Amateur Swimming Association of South Africa, embarked on an exercise to determine the way forward. Following an introductory workshop with the Management Committee of Swimming South Africa on 30 July 1999, a task group consisting of Mike Davy, Jace Naidoo, Shaun Adriaanse, Eddie Meth, Easlyn Fredericks, Rajen Naidoo, George Englebrecht, Hassim Bester and Mrs. Rwida, met for a two and half day workshop (13 - 15 August 1999). This intensive workshop debated the various issues affecting transformation of the sport in the country.
The proposals from this workshop were taken to a national Bosberaad of the Presidents of all SSA affiliates. At this meeting consensus was reached on the proposals. The following report emerged from this bosberaad as a blueprint for transforming Swimming South Africa, its affiliates and aquatic sport in South Africa.
REVIEW OF RELEVANT STATE POLICY FOR SPORTING TRANSFORMATION
The need to transform sport in South Africa has been emotionally debated in recent years. The demand for sport to become more representative and inclusive of the vast majority of the people in this country will grow more vigorous in the months to come.
The recent White Paper on Sport, the Parliamentary Portfolio Committee on unity in sport and recent statements by the new Minister of Sport all indicate that there is a growing urgency for the Aquatic sports administrators to ensure that we create opportunities for the vast majority to participate in the sporting activities under our ambit.
The issue is not about quotas, but to ensure that the mechanisms and resources are put in place to deliver black athletes and administrators of merit throughout the organisation.
FEATURES OF THE AQUATIC SPORT SECTOR WITH REGARDS TO TRANSFORMATION
The current dominant feature of aquatic sport in South Africa, at both competitive and recreational levels is the representation of the historically advantaged community out of proportion to that of its black counterparts. This feature has been developed through strong white aquatic sporting organisations since the turn of the last century. The unification process that was started at the beginning of the decade was characterised largely by an adoption of the existing infrastructure of the dominant partner, with attempts at redressing past inequities not meeting declared objectives for reasons that are explored below.
However, the unified structures were not only driven by the infrastructure of the white based partner, but also in time developed, not a new unique culture borne out of the merging process, but the dominant culture. This culture was characterised by the rapid development of the individual, creation of a super-elite ultra-competitive grouping of athletes with the ability to bring international glory. This culture in turn determined the type of organisation necessary to deliver this result - a centrally dominant almost commandist type organisation was seen as being adequate for meeting the needs of its elite membership. The development of a mass based recreational aquatic sporting organisation remained the philosophy of the minority. This marrying of this diametrically opposing cultures resulted in the inability to either transform the organisation or properly institute grassroots development programmes in disadvantaged communities.
An organisation committed to mass based aquatic recreational activities requires structures within the organisation which can cater for this need. In the short term, a centrally driven structure may prove essential to direct the organisation to the goal of mass participation. However, in the medium to long term, an organisational structure which is transparent, democratic and accountable to its smallest unit, i.e. clubs and their membership is crucial. All attempts must be made to resist the temptation to more bureaucratic structures (often under the guise of better management, more structures result in greater alienation of the basic units of the organisation). While democracy cannot be legislated, it must be encouraged to remain a dynamic activity within aquatic sport in the country.
To this end, the national structures must ensure effective and rapid communication with clubs, allow for the participation of clubs directly into the decisionmaking structures of the organisation at all times. In the age of rapid technological advancement and almost instantaneous communication networks, our clubs must be allowed to become the driving force of our organisation. This document is optimistic that it can begin this process, given the commitment of all stakeholders.
consequences of the failure to transform
While the drive for transformation is to ensure that aquatic sport becomes a mass based activity, failure to change the direction of the organisation is likely to impact negatively at all levels of the sport, including the competitive levels. While mass based sport will certainly result in a larger pool of ultra-competitive athletes, the social constructs that exist in South African society will always ensure the production of a high calibre of elite athletes, irrespective of transformation. Notwithstanding this, failure to transform will result in possible punitive measures on part of the state, which has an obligation to its electorate. This will in all probability result in decreased grants from this source. In addition, the private sector, with its dual pronged strategy of transformation and seeking new markets among formerly disadvantaged communities, are going to demand that monies provided for sponsorship have an effect in these consumer sectors. Lack of development of aquatic sport in these communities will possibly result in such sponsorship being withdrawn (e.g. Telkom) or not forthcoming.
PROBLEMS TO BE ADDRESSED IN TRANSFORMATION
After a thorough analysis of the challenges facing the organisation, it was determined that the key problem that needs to be ultimately addressed was defined as:
"THE LACK OF TRANSFORMATION OF AQUATIC SPORT TO CATER FOR THE NEEDS OF THE MAJORITY OF SOUTH AFRICANS"
This overriding problem was considered to have several primary causes. These were categorised as:
Human resource related:
There was a lack of inclusivity of black people in the structures of the organisation. This resulted in poor representation in crucial decision making structures, with authoritative personalities in these structures. There was a lack of capacity development, especially at provincial and other lower levels. This lack of human resources has affected the effectiveness of development structures.
Competition related:
There was a general lack of the number of athletes participating in the various club, provincial and national competitions. This was linked to the next problem cause:
Grassroots participation: failure of delivery at a regional and local level
There were insufficient clubs in the townships, with little or no development taking place in the majority of disadvantaged areas.
Structural issues: Ineffective or absent black intervention within the organisation
There was no overall direction by individuals within the organisation from disadvantaged communities towards a structured programme to transforming the organisation or aquatic sport.
Financial considerations: resources are not utilised in a manner to ensure sustainability
There was a general lack of funds seen at grassroots level to develop club.
On the basis of this problem, together with its contributing causes, a number of interventions are considered crucial if the organisation is to become truly South African in the new millenium.
OVERALL OBJECTIVES AND VISION
The first step in determining appropriate interventive measures to address the problem, was the definition of a vision for the organisation. This was seen to be the transformation of aquatic sport, catering for the needs of the majority of South Africans and to redress inequity created by apartheid imbalances. Development is considered to be the process of transformation of Swimming South Africa to represent the demographics of the country, with the emphasis on Black focussed aquatic programmes providing opportunities for disadvantaged children and adults. In the short term, this would entail the demographic representivity in all structures and activities of the organisation at club, provincial and national level before 2004.
This overall objective and vision will be achieved through carefully designed "projects", each with a set of determined results attained through set activities. All of these will be measured by specified indicators, implemented by a responsible agency within the structures of SSA within timeframes.
NOTE: ALTHOUGH IN CERTAIN INSTANCES NO SPECIFIC REFERENCE IS MADE TO DISADVANTAGED COMMUNITIES OR PERSONS OF COLOUR, THE AUTHORS’ INTENT IS EXPLICIT: WHILE PROJECTS MAY EXTEND TO ADVANTAGED COMMUNITIES, STATED TARGETS AND INDICATORS ARE ONLY RECOGNISABLE IN PREVIOUSLY DISADVANTAGED AREAS AND PERSONS OF COLOUR.
In order to achieve this vision, certain objectives need to be met. Some of these objectives are attainable through the projects discussed below. It is NOT pre-supposed that these projects will definitely achieve the vision, but will transport the organisation a considerable way down this road. These objectives are:
Within the given resources (and the attainable assumption of harnessing additional resources), three projects were defined to address some of these objectives:
Project 1: Human Resource Development
Project Purpose: To develop human resource capacity to facilitate transformation
Verifiable Indicator: Capture of information of skilled persons on national database
Responsibility: The National Executive
Project 2: Grassroots Development:
Project Purpose: To achieve greater number of "Learn-to-Swim" youngsters in the country
Verifiable Indicator: Statistic returns from provinces
Responsibility: National Executive
Project 3: National Teams’ Representivity
Project Purpose: To increase the number of black aquatic athletes in national teams
Verifiable Indicator: Specific numbers of black athletes in national first level teams by 2004
Responsibility: National Boards
PRE-DETERMINED RESULTS AND ACTIVITIES
These project purposes are only achievable if certain results are attained. In order to ensure that each project is carefully measured, these results need to be specified. The results, in turn, require fulfillment by a series of activities. Both the results and activities are measured by objectively verifiable indicators. For each of the projects identified above:
Project 1: Human Resource Development
Result 1: Increase in the number of swim teachers in each region of the country
Activities:
Result 2: Increase representation at provincial level
Activities:
Result 3: Increase representation at national level
Activities:
Result 4: Increase in the number of competitive coaches
Activities:
Project 2: Grassroots Development:
Result 1: Creation of new clubs
Activities:
Result 2: Stimulation and sustaining LTS activities within existing clubs
Activities
Project 3: National Teams’ Representivity
Result 1: Establishment of provincial and national target squads
Activities:
Result 2: Increase representivity in first division provincial teams
Activities:
Result 3: Establish a National Aquatic Academy and Scholarship Programme
Activity:
As in the case of the project purpose, each of these results and their accompanying activities are measured by defined verifiable indicators and conducted by a responsible agency with the organisation within a set timeframe. These details are elaborated in the accompanying Project Matrices. These tables are vital to the success of the individual projects and provide the indicators against which delivery by the responsible agency is achieved.
For several of the indicators and activities listed in the matrices that follow, success depends on certain assumptions being fulfilled. Most of these are within the control of the organisation, some external, but can be influenced. In such instances, the strength of the organisation needs to be directed to ensure the meeting of these assumptions for the successful completion of the project. Assumptions which are in the main not within the ability of the organisation to address, indicate the poor likelihood of bringing the project to fruition. In some instances these are reflected in the matrix, with specific responsibilities that may begin to address the assumption.
PROJECT PURPOSE 1: TO DEVELOP HUMAN RESOURCE CAPACITY TO FACILITATE TRANSFORMATION
INDICATOR: CAPTURE OF PEOPLE INFORMATION ON NATIONAL DATABASE
RESPONSIBILITY: NATIONAL EXECUTIVE – 12 MONTH TIMEFRAME
RESULT 1: INCREASE IN NUMBER OF SWIM TEACHERS
INTERVENTION LOGIC |
VERIFIABLE INDICATORS |
SOURCES OF VERIFICATION |
RESPONSIBILITY |
TIMEFRAME |
ASSUMPTIONS |
|
RESULTS |
Increase swim teachers |
Qualification of minimum of 24 teachers per region |
Application and presentation of certificates Reports of assessments from Regional Facilitators |
Provincial Executive |
Within next 12 months |
Access to financial resources – Telkom Access to Human resources – school teachers, etc. |
ACTIVITIES |
|
Final course ready
Nat training of additional 2 facilitators/ region Establishment of national accredition process Identification of 12 potential teachers |
Course material to provinces & national exec Completed participant evaluations Database available for scrutiny Quarterly reports from prov copies of attendance registers |
Telkom LTS
Telkom LTS
National Executive Prov Exec/LTS Prov Exec/LTS Prov Exec/LTS |
2 months
Over 12 month period Within 2 months
3 months 3 months 6 months |
Materials reflective of SA Demographics Consultation on material development Adequate criteria for selecting facilitators
Process for identifying prospective swim teachers – use of prov. structures Securing & utilisation of facilitators Common understanding of pre-requisites for swim teachers |
Pre-conditions Appropriate structure/person responsible for implementation (Shaun) Ensure Telkom LTS dovetails with activities |
PROJECT PURPOSE 1: TO DEVELOP HUMAN RESOURCE CAPACITY TO FACILITATE TRANSFORMATION
INDICATOR: CAPTURE OF PEOPLE INFORMATION ON NATIONAL DATABASE
RESPONSIBILITY: NATIONAL EXECUTIVE – 12 MONTH TIMEFRAME
RESULT 2: INCREASE REPRESENTATION AT PROVINCIAL LEVEL
INTERVENTION LOGIC |
VERIFIABLE INDICATORS |
SOURCES OF VERIFICATION |
RESPONSIBILITY |
TIMEFRAMES |
ASSUMPTIONS |
|
RESULTS |
Increase representation at provincial level |
Composition of structures at end |
Annual prov reports |
Provincial Executive |
At end of 12 months |
Available black admin in prov (Prov to seek assistance from other structures/ persons to start basic prog) |
ACTIVITIES |
|
Entered onto prov database Prov to run min 2 courses in each category – 10 trained per category
Province to hold w/shop
SSA develop legislation minimum: 20% within 2 years; 50% within 5 years |
Review of Database
Attendance registers Certification of trainees
SSA policy document |
Provincial Dev Council
Provincial Boards
Provincial DC
National Executive |
December ’99
Over 12 month period
December ’99
Policy within two months |
Commitment to democracy Course material available Trained facilitators are available
|
PROJECT PURPOSE 1: TO DEVELOP HUMAN RESOURCE CAPACITY TO FACILITATE TRANSFORMATION
INDICATOR: CAPTURE OF PEOPLE INFORMATION ON NATIONAL DATABASE
RESPONSIBILITY: NATIONAL EXECUTIVE – 12 MONTH TIMEFRAME
RESULT 3: INCREASE REPRESENTATION AT NATIONAL LEVEL
INTERVENTION LOGIC |
VERIFIABLE INDICATORS |
SOURCES OF VERIFICATION |
RESPONSIBILITY |
TIMEFRAMES |
ASSUMPTIONS |
|
RESULTS |
Increase representation at National level |
Composition of boards & executive |
Annual reports Bi-annual demographic skills audit |
National Executive |
Availability of individuals |
|
ACTIVITIES |
|
SSA Policy 50% by September 2000 individual appointment from database
organisation of workshop |
SSA Policy document
Reports from Boards or structures |
National Executive
National Exec/ Board/structure consulting National Dev Council
National DC |
Policy within 2 months
December ’99
December ‘99 |
PROJECT PURPOSE 1: TO DEVELOP HUMAN RESOURCE CAPACITY TO FACILITATE TRANSFORMATION
INDICATOR: CAPTURE OF PEOPLE INFORMATION ON NATIONAL DATABASE
RESPONSIBILITY: NATIONAL EXECUTIVE – 12 MONTH TIMEFRAME
RESULT 4: INCREASE IN THE NUMBER OF COMPETITIVE COACHES
INTERVENTION LOGIC |
VERIFIABLE INDICATORS |
SOURCES OF VERIFICATION |
RESPONSIBILITY |
TIMEFRAMES |
ASSUMPTIONS |
|
RESULTS |
Increase number of competitive coaches |
Composition of coaching staff of all teams Coaches assoc. reflect demographics of country |
Team lists Registration of club coaches |
National Boards |
Over 12 month period |
The will to change |
ACTIVITIES |
|
Entered onto database
Train minimum of one coach per club at provincial level
Course to be developed by Director Coaching thro’ consultation One course run at province per season Minimum of 2 coaches per province Progress of mentees’ athletes One national course One understudy per team |
Review of database
Attendance registers & certificates
Course material distributed to province. & national executive Course register/ programme Results at prov & nat competition Course register / prog Team lists |
Provincial DC
Provincial Boards
National Director of Coaching
Provincial Boards
Provincial boards Provincial DC National Director of Coaching Provincial and National Boards |
December ‘99
Over 12 month period
3 months
12 month period
12 month period
12 month period |
Database of mentor coaches
Competent understudy |
PROJECT PURPOSE 2:GREATER NUMBER OF LEARN-TO-SWIM YOUNGSTERS IN THE COUNTRY
INDICATOR: STATISTIC RETURNS FROM CLUBS
RESPONSIBILITY: NATIONAL DEVELOPMENT BOARD – 12 MONTH TIMEFRAME
RESULT 1: CREATE NEW CLUBS
INTERVENTION LOGIC |
VERIFIABLE INDICATORS |
SOURCES OF VERIFICATION |
RESPONSIBILITY |
TIMEFRAMES |
ASSUMPTIONS |
|
RESULTS |
Create new clubs
|
2 clubs affiliating to prov per season |
Registration and participation records |
Provincial Executive (assisted by TSD) |
Facilities not being utilised |
|
ACTIVITIES |
|
List of facilities from Technical Services Directors
Number of people participating in admin training Evidence of national club mailing lists Random audits of club activities Joint report by clubs Delivery of starter packs 1 Aquatic day/club/season 3 galas/per season/prov |
TSD report
Registers of attendance
National Secretarial report Executive report
Club reports
Gala Programme
Gala Programme |
LTS
Provincial DC
Provincial Exec/Boards
National & Prov Executive
National Executive (assisted by the TMC) Provincial Executive Provincial DC Provincial DC Provincial DC |
3 months
November ‘99
12 month period
12 month period
12 month period
|
TSDs are an available resource Specific admin support in SSA office |
PROJECT PURPOSE 2: GREATER NUMBER OF LEARN-TO-SWIM YOUNGSTERS IN THE COUNTRY
INDICATOR: STATISTIC RETURNS FROM CLUBS
RESPONSIBILITY: NATIONAL DEVELOPMENT BOARD – 12 MONTH TIMEFRAME
RESULT 2: SUSTAIN LTS ACTIVITIES IN EXISTING CLUBS
INTERVENTION LOGIC |
VERIFIABLE INDICATORS |
SOURCES OF VERIFICATION |
RESPONSIBILITY |
TIMEFRAME |
ASSUMPTIONS |
|
RESULTS |
Stimulation & sustaining of LTS activities within existing clubs |
6/12 return from clubs on activities & numbers |
6/12 report |
Provincial Executive |
Over 12 month period |
Province. accepting responsibility. for club support |
ACTIVITIES |
|
Names submitted to national Accreditatn committee Numbers from clubs attending courses Regular club activities, calendar, stats Development of assistance criteria Provision of funds from Prov Specified number of campaigns Submission of document by clubs to prov. National Database Number of parents in club structures Development of brochure |
Report from Comm
Course register Club calendars Club reports Circulation of criteria Treasurers report Reports from clubs Club report
Review of database Club reports and membership lists Distribution of brochure |
Provincial DC/LTS > National Accredit Committee Provincial Boards Provincial DC
National DC to develop criteria National treasurer Provincial Exec with LTS Teachers Prov DC
National DC Prov DC
Provincial DC |
3 months
3 months
3 months
3 months |
Provision of funds from SSA to prov. TSDs available – as resource
|
PROJECT PURPOSE 3: TO INCREASE BLACK PARTICIPATION IN NATIONAL TEAMS
RESULT 1: TO ESTABLISH TARGET SQUAD TEAMS
INTERVENTION LOGIC |
VERIFIABLE INDICATORS |
SOURCES OF VERIFICATION |
RESPONSIBILITY |
TIMEFRAME |
ASSUMPTIONS |
|
PROJECT PURPOSE |
To increase black participation in national teams |
Number of active participants in first level national teams by 2004: 4 in swimming 30% diving, water-polo, synchronised swimming |
Team lists |
National Boards |
2004 |
|
RESULTS |
Establish provincial and national target squads |
Prov. and national target squad team lists |
Database of squad |
Provincial DC and Provincial Boards |
||
ACTIVITIES |
|
Min 20 participants/ province. Consultation on FTP Conduct of programme Development of criteria Est national competition Selection of Team Selection Criteria Defined national prog Select national team Proposal Est. Database |
Lists provided Reports on prog Circulate FTP Provincial report Circulation of criteria National programme Circulation of criteria Reports from Boards Team lists Review of database
|
Provincial DC National DC & Director of Coaching Provincial Boards National Dev Board and other Boards National DC and Boards National Boards Director Coaching/ National DB & other Boards Nat DB and Boards National DB |
October ‘99 October ‘99 3 months 3 months January ‘00 December ‘99 December ‘99 January ‘00 January ‘00 |
Prov works with Coaches Assoc
Boards monitor progress of activities
Coaches must consult with specialists |
PROJECT PURPOSE 3: TO INCREASE BLACK PARTICIPATION IN NATIONAL TEAMS
RESULT 2: INCREASE BLACK COMPETITORS AT PROVINICIAL LEVELS
INTERVENTION LOGIC |
VERIFIABLE INDICATORS |
SOURCES OF VERIFICATION |
RESPONSIBILITY |
TIMEFRAME |
ASSUMPTIONS |
|
RESULT |
Increase representation in Prov. teams |
40% in all prov teams all discip by 2004 |
Database of squad |
Provincial Exec/ Boards |
||
ACTIVITIES |
Utilise "B" Q/Standards for First Time entry Provide incentives for "A" qualifiers |
Entry in national events at "B" level Entry in national events at "A" level |
Championship programme |
Provincial Boards & Provincial DC |
Commitment from coaches/ parents Commitment by prov boards |
PROJECT PURPOSE 3: TO INCREASE BLACK PARTICIPATION IN NATIONAL TEAMS
RESULT 3: INVESTIGATE THE ESTABLISHMENT OF AN AQUATIC ACADEMY AND SCHOLARSHIP PROGRAMME
INTERVENTION LOGIC |
VERIFIABLE INDICATORS |
SOURCES OF VERIFICATION |
RESPONSIBILITY |
TIMEFRAME |
ASSUMPTIONS |
|
RESULTS |
Establishment of National Swimming Academy and set up Scholarship programme |
Development of a proposal |
Circulation of proposal |
National Executive |
2 years |
Availability of funding |
ACTIVITIES |
Investigate the development of an academy Identify institution for swim scholarship programme Identify athletes – based on criteria |
Proposal
Letter of agreement
Development of criteria Selection of athletes |
Reports to Exec |
National Executive
Provincial Executive and Prov DC |
2 years
2 years |
Province to investigate at prov level SSA to investigate at Nat/ Internat
Institution to provide bursaries/ scholarship (to be negotiated.) |
The success of these projects in addressing the overall objective and vision lies in the commitment and will of all sectors of the organisation. The above matrices clearly identify the responsible agency. This section summarises the above tables by responsible agency:
National Executive
National Director for Coaching/ Coaches Association
National Treasurer
Telkom LTS Programme
National Boards
National Development Board
Provincial Executive
Provincial Boards
Provincial Development Council
cost estimate and financial planning
The success of the above listed projects rests squarely on the ability to harness appropriate resources for its implementation and conduct. The two key material resources required are human and financial. It is not the intention of this report to spell out a detailed budget for each of the projects. This is primarily because of the nature of the responsibilities rest in various agencies. The latter implies that together with implementive responsibility rests financial responsibility. In the process of finalising this document, and in making submissions back to the National Executive, the responsible agencies should consider the financial implications of these projects for their respective structures. Additionally, such submissions should be accompanied by suggested budgets from these agencies. It is not intended for these projects to be funded from the national centre, but in all instances to become part of the functioning of the responsible agency.
However, it is prudent that this document records some potential sources of financial income for the projects.
Another aspect about funding was the need to develop self sufficiency within clubs from the disadvantaged sector. Continuous subsidy will in all likelihood result in permanent dependency, which will not bode well for structures that are developing. In order to stimulate club development, a National Club Development Fundraising event should be organised, led by someone from a Black club, but run through the national treasurer. This national event should have the following characteristics:
factors ensuring sustainability
To ensure success of the Transformation Process at all levels of the organisation, policy must be developed. In concrete terms this includes at least the following:
It is widely accepted that in order to maximise participation by all sectors of the South African community, the organisation and its structures have to become more financially accessible to increasing numbers of individuals. However, this remains a difficult tightrope: in order to deliver a comprehensive package of services to all South Africans, the financial demands on the organisation become tremendous. Recognising the need for this fine balancing act, it was decided that the elements of a fee structure should encompass the following:
The national treasurer will be provided with the necessary information to ensure that the fees are not a barrier to entry and that the SSA fee structure is not be abused. The SSA development fee will only apply to previously disadvantaged swimmers. If the province decides to reduce the national fee to the swimmer the province will be responsible for the full SSA development fee
institutional and management capacity
The success of the process envisaged in this document depends on the will and commitment of all agencies within Swimming South Africa. The process will have to be driven by the National Executive. There exists sufficient human resources capacity within the organisation to drive the process and a large potential outside.
Therefore the custodianship of this strategy will be the responsibility of the National Executive of the organisation. The Chairs of the various affiliates, boards and associate members will be accountable for the implementation and delivery of the performance targets that have been established.
To ensure effective delivery of this strategy a structure which is independent of all delivery structures (as per the attached structure) must be established. This structure should be called the Transformation Monitoring Council (TMC). The TMC will be composed of between 3-5 members appointed by the Executive. These members must not be responsible for the delivery of any specific results of the strategy so as not to cause any conflict of interest.
It was also accepted that the Development Council/Board (DC) should play a key role in the implementation of transformation and that this structure should continue. It would compose of the Co-ordinator, the four discipline development representatives and one provincial representative from each affiliate. The DC would be crucial in identifying potential administrators for the various structures of the organisation.
The DC should meet twice a year. The DC will have clear performance targets the DC and the National Coordinator should be accountable for the performance.
The necessary resources should be provided to the Development Council to ensure the effective fulfillment of their tasks. Provincial Development Officers should be provided with an allowance in order to assist with their tasks (Similar consideration may need to be given to the Learn-to-Swim teachers, once this level of human resource is in place).
Feedback will have to be provided by the accountable Chairpersons of the various structures on the progress and any problems that are encountered in delivery and the steps that will be taken to achieve the targets. This feedback will be provided directly to the Transformation Monitoring Council (TMC) on a quarterly basis in a prescribed format to the Swimming South Africa offices not later than the specific due dates which will be provided.
The TMC will consolidate the feedback and submit it to the Executive and Management Committee of Swimming South Africa. Clear indication will be provided on structures that are failing to meet the indicators and the possible interventions that may be necessary to address the problem.
The TMC will conduct regular random audits of all implementing agencies to verify delivery targets. These audits will be either of the full implementation process or a specific area. In addition specific audits will be conducted at agencies which are falling behind on their targets. These audits will either be conducted by members of the TMC or an individual acting under the authority of the TMC. This individual will not be one who is directly responsible for implementing any portion of this strategy.
Annual evaluations will be conducted to determine if the overall objective of the strategy is being achieved. If it is found necessary to amend the strategy to achieve the objectives, the TMC will make such recommendations to the Executive.
The current development programmes within Swimming South Africa has not had the desired effect of fundamentally transforming the sport to reflect the needs and aspirations of the vast majority of South Africans.
Competitive activities have seen black athletes largely restricted (because of ability and/or choice) to participating in the development activities of the organisation. There has also been a limited number of assertive and skilled administrators to ensure the sustained growth and development of the sport in the townships throughout the country.
To ensure the long term transformation of our sport it is necessary to implement this multi-pronged strategy. The strategy addresses the development of administrative and competitive skills of black people throughout the country; development and sustaining aquatic clubs and increasing the number of black individuals in administrative and competitive activities and structures.
Swimming South Africa adopted this strategy by:
This strategy will require high levels of effort, commitment and co-operation throughout the organisation. However, the long term benefits for transforming the organisation are widespread. This includes creating a large pool of competitive athletes, ensuring that swimming as a life skill is accessible to all throughout the country; and the increased administrative resources that will be available to us.