DEPARTMENT OF
ENVIRONMENTAL AFFAIRS AND TOURISM
STRATEGIC PLAN
1 APRIL 2004 - 31 MARCH 2007
CONTENTS
1. INTRODUCTION 1.1 Foreword by the Minister 1.2 Introduction by the Director-General 1.3 Vision and Mission 1.4 Departmental values 1.5 Overview of past performance and spending trends 1.6 Legal and constitutional mandate 2. MEDIUM TERM STRATEGY
2.3 Resource requirements per key departmental programme
3. SERVICE DELIVERY IMPROVEMENT PROGRAMME FOR 2004/2005 4. ORGANISATIONAL MANAGEMENT 4.1 Human resource strategy 4.2 Affirmative action programme 4.3 Information technology resource strategy 4.4 Organisational structure 5. PLANNING INFORMATION FOR 2004/2005 5.1 Programme and output details for year ending 31 March 2005
|
3 4 5 6 6 8
10 11 39 39 41
50 52 54 55
56 59 60 60 61
|
1. INTRODUCTION
1.1 Foreword by Minister Marthinus van Schalkwyk
The theme for our tenth anniversary of freedom and democracy is: "A people united for a better South Africa and a better world". It is a theme of unity with purpose, and it also reflects the role that the Department of Environmental Affairs and Tourism must play. The overarching vision of the department is to ensure a better life for all South Africans through the growth of tourism and the sound management and protection of our shared environment.
We face significant challenges over the next four years, not least of which is to prepare for the successful hosting of the 2010 Soccer World Cup. This presents a great opportunity for tourism, job creation, and increased investment. A Tourism Development Plan will be compiled by the department to facilitate preparations by all within the tourism industry – we will be ready.
Tourism has great potential for further growth in both international and domestic markets. Despite the recent slump in global tourism, ours is one of the few countries in which the industry has continued to grow. The department’s objective for tourism is to develop the sector by stimulating demand, and removing obstacles to growth. As a labour-intensive industry, tourism helps to create jobs and to attract foreign investment. The department aims to expand tourism infrastructure, while promoting job-creation, black economic empowerment (BEE) and transformation. Raising awareness about the opportunities for domestic travel continues to be a priority and will be accomplished through the implementation of the new Domestic Tourism Growth Strategy.
Closely interlinked with our tourism priorities is the need to further unlock the economic and social benefits of sound environmental management. This will require from the department the wider implementation of our poverty relief programmes, our Expanded Public Works Initiatives, and broad-based cooperation with communities, the private sector and our other governmental partners. We must demonstrate that the interests of the environment and those of our people are the same.
Addressing the pollution and the waste challenges of our country will be another major focus for the next four years. Issues such as air quality management will be addressed, and polluting companies will be pursued and held accountable should they not comply with their permit regulations.
In Marine and Coastal Management there will be an emphasis on the protection of marine and coastal resources, in line with the newly declared Marine Protected Areas. In fishing, the department’s objectives are: to expand the industry to accommodate subsistence, small and medium enterprises; to promote investment; and to accelerate transformation of the industry. There will also be greater focus placed on compliance and enforcement to protect marine resources from poaching, over-fishing and unreported fishing. The delivery of the first of four environmental protection vessels during November 2004 will further enhance the department’s ability to manage the compliance and pollution function more effectively and efficiently.
The basis of all of our efforts over the next four years will be to ensure that the economic potential of both tourism and our environment is realised in a sustainable manner. At the beginning of another five years of a newly-elected government, the call from the President is "A South Africa at work", a call to which we will adhere, in close co-operation with our various partners.
1.2 Introduction by Director-General Dr Crispian Olver
The constitutional and legislative mandates underpinning the work of the Department of Environmental Affairs and Tourism place a great responsibility on us to deliver on a wide range of responsibilities. The establishment and integration of tourism and environment as major contributors to economic growth in South Africa, and thereby creating a better quality of life for all South Africans, underpins the strategies set out in this plan.
Sustainable development has become a thread that runs through all our work. We are continuing to transform our society and create a better life for all. In doing so, we should all be guided by the principle of sustainable development and the sustainable use of our natural and cultural resources. The environment is not only our source of life, but the protection and efficient management of the environment, is core to our international and domestic tourism growth and development strategy.
Over the next three years we will continue to focus on:
In pursuing the above and more, we will improve our service delivery to our people (Batho Pele) in whatever we do.
Our approach to deliver on the various objectives and targets set out in the strategic plan can only be achieved in partnership with various other government departments, agencies, partners in civil society and our international friends. The Cabinet cluster system and the Directors-General cluster system are important mechanisms for us to ensure an integrated approach to sustainable development. In these forums we have already achieved a high level of interest and commitment to both our tourism strategy and environmental responsibilities.
1.3 Vision and Mission
VISION
A prosperous and equitable society living in harmony with our natural resources.
MISSION
To lead sustainable development of our environment and tourism for a better life for all, through:
Our mission also reflects the five key focus areas of the Department. These focus areas form the basis on which this Strategic Plan has been compiled.
The Department comprises of six programmes to perform our responsibilities:
Programme 1: Administration and Support
Programme 2: Environmental Quality and Protection
Programme 3: Marine and Coastal Management
Programme 4: Tourism
Programme 5: Biodiversity and Conservation
Programme 6: Auxiliary and Associated Services
1.4 Departmental values
We are guided by the following values :
1.5 Overview of past performance and spending trends
The following achievements are highlighted to illustrate the wide range of issues on which we have delivered over the last year:
Tourism growth and development
Conservation and sustainable development of natural resources
Environmental Quality and Protection
Sustainable Development
Transformation
Expenditure over the last four years is reflected in the table below.
Programme |
Expenditure outcome |
Adjusted Appropriation |
Revised Estimate |
||
Audited |
Audited |
Preliminary Outcome |
|||
R thousand |
2000/2001 |
2001/2002 |
2002/2003 |
2003/2004 |
|
1. Administration |
60 351 |
125 780 |
331 809 |
105 136 |
105 136 |
2. Environmental Quality and |
86 536 |
100 757 |
102 201 |
125 901 |
125 901 |
3. Marine and Coastal Management |
114 146 |
232 299 |
239 762 |
293 806 |
293 806 |
4. Tourism |
228 560 |
235 058 |
237 673 |
320 842 |
320 842 |
5. Biodiversity and Conservation |
108 019 |
151 608 |
198 637 |
215 881 |
215 881 |
6. Auxiliary and Associated Services |
149 491 |
218 563 |
253 004 |
404 412 |
404 412 |
Total |
747 103 |
1 064 065 |
1 363 086 |
1 465 978 |
1 465 978 |
1.6 Legal and constitutional mandate of the Department of Environmental Affairs and Tourism
The mandate and core business of the Department of Environmental Affairs and Tourism is underpinned by the Constitution and all other relevant legislation and policies applicable to the government, including the Batho Pele White Paper etc. Our specific mandate is derived from the following:
A law reform programme to address legislative gaps and outdated legislation will be concluded by 2005. The Protected Areas Amendment Bill, Air Quality Management Bill, the Waste Management Bill and the Coastal Management Bill will be made available for public comment during 2004.
2. MEDIUM TERM STRATEGY
2.1 Key focus areas and departmental strategic objectives
KEY FOCUS AREA / GOAL |
STRATEGIC OBJECTIVES |
Create conditions for sustainable tourism growth and development |
Ensure effective and efficient international and domestic tourism marketing. Develop a competitive and transformed tourism product and services platform. Address gaps in the tourism logistics value chain. Strengthen cooperative governance in the tourism sector. Building a tourism nation. |
Promote the conservation and sustainable development of our natural resources |
Establish a national system of managing Biodiversity and Conservation. Ensure that conservation and fishing industry contribute towards the cost of managing natural resources. Develop and maintain a natural resource information system for effective monitoring, reporting and dissemination of information Increase participation of marginalized and local people and groups in co-operative management, equitable use and benefit-sharing of natural resources. Reduce the illegal trade and the unsustainable use of natural resources. |
Protect and improve the quality and safety of the environment |
The potential negative environmental impacts of all significant new developments are mitigated, managed and/or controlled. Increased compliance with environmental quality and protection legislation and authorizations Reduced releases of prioritized pollutants and waste streams into the environment and/or landfills |
Promote a global sustainable development agenda |
Lead South Africans in a coherent and effective engagement in international agreements and events in tourism, environment and sustainable development Promote regional and continental tourism growth Lead South Africa’s engagement in environment and tourism agreements and processes in the region and sub-region Lead South Africa in the promotion of a national sustainable development agenda Promote NEPAD programmes |
Transformation |
Improve service delivery and enhance participation by South Africans in environment, fishing and tourism Develop and retain a representative and performing team Promote economic empowerment, job creation and poverty eradication Ensure the practice of good governance within the department and public entities Promote transformation in the fishing industry, tourism and conservation sectors |
2.2 Key deliverables / outputs, targets and time frames per strategic objective for 2004-2007
Goal: Create conditions for sustainable tourism growth and development for the benefit of all South Africans
Strategic objective: Ensure effective and efficient international and domestic tourism marketing
Key outputs/deliverables |
Key performance indicators |
Key milestones |
Time frame |
Implementation and monitoring of the international and domestic tourism growth strategies to increase the number of tourists visiting SA.
|
|
|
2004-2007
2004-2007
2004-2007 Monthly
Quarterly |
Increased tourism marketing budget in order to compete effectively with main international competitors |
|
|
June 2007 March 2005 June 2004 |
Goal: Create conditions for sustainable tourism growth and development for the benefit of all South Africans
Strategic objective: Develop a competitive and transformed tourism product and services platform
Key outputs/deliverables |
Key performance indicators |
Key milestones |
Time frame |
Tourism Development Plan for hosting of 2010 Soccer World Cup |
|
|
2004-2007 |
Develop tourism products and services which are aligned to tourist market demand
|
|
|
July 2004 2004-2007
2004-2007 Quarterly 2004-2007
|
Goal: Create conditions for sustainable tourism growth and development for the benefit of all South Africans
Strategic objective: Address gaps in the tourism logistics value chain
Key outputs/deliverables |
Key performance indicators |
Key milestone |
Time frame |
Easier tourist access to South Africa, and movement of tourists within South Africa
|
|
|
2004-2007 2004-2007
2004-2007
2004-2007 |
Goal: Create conditions for sustainable tourism growth and development for the benefit of all South Africans
Strategic objective: Empower South Africans to participate in environment and tourism
Key outputs/deliverables |
Key performance indicators |
Key milestones |
Time frame |
Build a tourism nation
|
|
|
2004-2007
2004-2007
2004-2007
2004-2007 |
More effective communication |
|
|
2004-2007
|
Goal: Create conditions for sustainable tourism growth and development for the benefit of all South Africans
Strategic objective: Strengthen cooperative governance
Key outputs/deliverables |
Key performance indicators |
Key milestone |
Time frame |
Alignment and capacity enhancement of tourism partners, particularly at provincial government level, to promote tourism development |
|
|
2004-2007
2004-2007 2004-2007 |
Goal: Promote the conservation and sustainable development of our natural resources
Strategic objective: Establish a national system of managing biodiversity and conservation
OUPUT |
KEY PERFORMANCE INDICATORS |
KEY MILESTONES & EVENTS |
TIMEFRAMES |
Promulgate and implement three pieces of legislation (Protected Areas Act, Biodiversity Act, and Coastal Management Act).
|
|
Protected Areas Act
Biodiversity Act
|
2004-2007 12 months from date of promulgation
2004-2005 2004 2004-2006 2004-2007
|
New Fisheries and the selective expansion of existing fisheries |
|
Marine and Coastal Management
|
2005
2007 |
Sustainability of fishing for Subsistence fishers established. Improve co-management between the department and all rights and exemption holders |
|
|
2005 2005 |
Develop and implement National Biodiversity Strategy and Action Plan. |
|
|
2005
|
Development of an alien invasive species control programme |
|
|
2006 2005 2007 |
Implementation of a National Action Plan (NAP) to Combat desertification |
|
|
2004-2007 |
Expand and consolidate Protected Areas.
|
|
|
2007
2006 2004 2004 2004 2004 2007 |
Establish and implement Transfrontier Conservation Areas
Establish Resource Management Working Groups for existing and new fishers. |
|
|
2006 2007 2006
2005 2004 |
Expand economy through twelve new commercial fisheries and create new jobs. Regulate by catch species. Allocate Medium- and Long term Commercial Fishing rights. |
|
|
2004 - 2007 2007 2004 2005/2006 |
Implement subsistence fisheries in all unallocated areas. |
|
|
2007
2004 |
Implement 4X4 regulations.
|
|
|
2004 2004 2005 |
Goal: Promote the conservation and sustainable development of our natural resources
Strategic objective: Ensure that Conservation and fishing industries contribute towards the cost of managing the resources
OUTPUT |
KEY PERFORMANCE INDICATORS |
KEY MILESTONES & EVENTS |
TIMEFRAMES |
Increase income through better cost recovery. Finalise Harbour Rehabilitation Programme. Settle responsibility issue of proclaimed fishing harbour management. |
|
|
2005-2007
|
Goal: Promote the conservation and sustainable development of our natural resources
Strategic objective: Develop and maintain a natural resource information system for effective monitoring reporting and dissemination of information.
OUTPUT |
KEY PERFORMANCE INDICATORS |
KEY MILESTONES & EVENTS |
TIMEFRAMES |
Put in place an information management system for biodiversity and fisheries management.
Commence with a Coastal and Marine Awareness Education and Training Programme. |
|
|
2005
2005
2005 |
Goal: Promote the conservation and sustainable development of our natural resources
Strategic objective: Increase participation of marginalized and local people and groups in co-operative management, equitable use and benefit-sharing of natural resources.
OUTPUT |
KEY PERFORMANCE INDICATORS |
KEY MILESTONES & EVENTS |
TIMEFRAMES |
Develop effective co-management systems for all stakeholders |
|
|
2007
2004
2006 |
Implement Community Based Natural Resource Management (CBNRM) guidelines.
|
|
|
2005 2004
|
Goal: Promote the conservation and sustainable development of our natural resources
Strategic objective: Reduce the illegal trade in and unsustainable use of natural resources
OUTPUT |
KEY PERFORMANCE INDICATORS |
KEY MILESTONES & EVENTS |
TIMEFRAMES |
Compliance with international standards for trade in endangered species Reduce illegal marine resources trade. Boost marine inspectorate and compliance capacity.
Reduce Illegal Unreported Unregulated Fishing (IUU) fishing, report and monitor adequately.
List abalone on schedule II at CITIES. Reduce illegal trade in marine resources. Strengthen Monitoring, Control and Surveillance (MCS) of fishing harbour management.
Establish an Environmental Court in Port Elizabeth.
Amend the Regulatory Framework. Improve the regulation of domestic and international trade in sustainable use of natural resources. |
|
|
2004
2004 - 20072006
2004 - 2007
2004
2004/2005
|
Leverage the tourism potential of TFCAs, harbours and other areas to provide income generating opportunities for local communities |
|
|
2004-2007 |
|
|
2004-2007
|
Goal: Protect and improve the quality and safety of the environment
Strategic objective: Mitigate, manage and control the potential negative environmental impacts of all significant new developments
OUTPUT |
KEY PERFORMANCE INDICATORS |
KEY MILESTONES & EVENTS |
TIMEFRAMES |
Control an effective environmental impact management (EIM) process. |
|
|
2006 |
Charge service fees for the delivery of an efficient environmental impact management service. |
|
|
2007 |
Review the South African EIM procedures including relevance, impact, effectiveness and efficiency. |
|
|
2007 |
Institute legally robust, monitorable, and enforceable environmental quality and protection related authorisations. |
|
|
2005 |
Goal: Protect and improve the quality and safety of the environment
Strategic objective: Increase compliance with environmental quality and protection legislation and authorisations
OUTPUT |
KEY PERFORMANCE INDICATORS |
KEY MILESTONES & EVENTS |
TIMEFRAMES |
Compile compliance monitoring reports, statistics and trends. |
|
|
2007 2004 - 2007 |
Undertake at least two high profile enforcement cases per year. |
|
|
2004 - 2007
|
Goal: Protect and improve the quality and safety of the environment
Strategic objective: Reduce releases of prioritised pollutants and waste streams into the environment and/or landfills
OUTPUT |
KEY PERFORMANCE INDICATORS |
KEY MILESTONES & EVENTS |
TIMEFRAMES |
Implement the National Air Quality Management Programme 2000 – 2010 and related National Environmental Management: Air Quality Act. |
|
|
2004 2005 2007 |
Fully implement legislation, regulation and strategies to reduce the quantity of prioritised non-hazardous waste streams entering landfills and/or the broader environment. |
|
|
2005 2006 2004-2007 |
|
|
2007 2006 |
|
Promote environmental management through tourism |
|
|
2004-2007
2004-2007 |
Goal: Promote a global sustainable development agenda
Strategic objective: Leading SA in coherent and effective engagement in international agreements and events in tourism, environment, & sustainable development
OUTPUT |
KEY PERFORMANCE INDICATORS |
KEY MILESTONES & EVENTS |
TIMEFRAMES |
Effective participation in strategic international agreements through a coherent and consolidated strategy (Tourism, World Trade Organisation (WTO), Johannesburg Plan Of Implementation, (JPOI), Multilateral Environmental Agreements (MEAs) |
|
|
June 2004 Quarterly meetings
|
Strengthening of multilateral institutions |
|
|
2004-7 |
Process well-informed and high-level of engagement with all relevant MEAs. |
|
|
2004 |
Provide environmental quality and protection legislation for the implementation of South Africa’s MEA commitments |
|
|
2006 |
DEAT resource (financial and technical) mobilisation strategy |
|
|
Annual process |
Enhanced South-South Cooperation in environment and tourism. Joint project development and implementation. |
|
|
2004
2005 |
Goal: Promote a global sustainable development agenda
Strategic objective: Lead SA engagement in environment and tourism in the region and sub-region
OUTPUT |
KEY PERFORMANCE INDICATORS |
KEY MILESTONES AND EVENTS |
TIMEFRAMES |
Mobilisation of financial and technical resources and political support for successful implementation of key SADC and NEPAD tourism and environment initiatives. |
|
|
2004-6
2004-6 |
Co-ordinated process for implementation of the NEPAD environment and tourism programmes. |
|
|
2004-6 |
Implementation of NEPAD and SADC tourism and environment action plans (particularly components on which SA is leading) |
NEPAD
SADC
|
|
2004-6
2004-6
|
Strengthening of sub-regional and regional institutions that relate to tourism and environmental management |
|
|
2004-6 |
Effective utilisation of our membership of multilateral organisations (WTO, ATA, IOTO, Commonwealth, etc) to promote NEPAD
|
|
|
2004 - 2007 |
Goal: Promote a global sustainable development agenda
Strategic objective: Lead SA in promoting a national sustainable development agenda
OUTPUT |
KEY PERFORMANCE INDICATORS |
KEY MILESTONES & EVENTS |
TIMEFRAMES |
Strengthened institutional capacity within government and SA stakeholders for promotion of a sustainable development agenda |
|
|
2004 - 2005 |
Integration of sustainable development objectives in the government planning cycle (10 year vision and MTSF) |
|
|
2004-2007 2004 2005
2005-2006 |
Monitoring and reporting the implementation of WSSD agreements and partnerships |
|
|
2004-2006 |
Promotion and monitoring of new and expanded partnerships for WSSD implementation |
|
|
A further 1 million USD in new resources by 2005 |
Stakeholder participation in implementing WSSD outcomes |
|
|
2004-7 |
Public awareness of WSSD outcomes and implications |
|
|
2004 - 6 |
Goal: Promote a sustainable global development agenda
Strategic objective: Promote regional and continental tourism growth
Key outputs/deliverables |
Key performance indicators |
Key milestones |
Time frame |
Effective utilisation of our membership of multilateral organisations (WTO, ATA, IOTO, Commonwealth, etc) to promote NEPAD
|
|
|
2004-2007
2004-2007
2004-2007 |
Goal: Transformation
Strategic objective: Improve service delivery and enhance participation by South Africans in environment, fishing and tourism
OUTPUT |
KEY PERFORMANCE INDICATORS |
MILESTONES/ACTIVITIES |
TIMEFRAMES |
Service standards develop for customer relations |
|
|
March 2005 |
Better and improved access and response system to customer needs. |
|
|
March 2005 |
EDMS Implementation |
|
|
March 2006 |
Language Policy developed and implemented. |
|
|
March 2006 |
Outreach campaigns run effectively (Welcome campaign and Greening SA campaign) |
|
|
Ongoing March 2005 |
Improved co-ordination with Statutory Bodies |
|
|
March 2005 |
Fully functional intergovernmental system of coordination & cooperation (i.e. MINMECs, Mintechs, CEC, etc) |
|
|
March 2005 |
Establishment of the National Environment Advisory Forum (NEAF) |
|
|
July 2004 Bi-annually |
Learnerships developed and Internship programme implemented. |
|
|
Annually
March 2005 March 2006 March 2005 |
Improve image by developing a "DEAT brand" |
|
|
March 2005 |
Goal: Transformation
Strategic objective: Develop and retain a representative and performing team
OUTPUT |
KEY PERFORMANCE INDICATORS |
MILESTONES/ACTIVITIES |
TIMEFRAMES |
Employment Equity plan implemented. |
|
|
September 2004 Monthly September 2004-December 2006. Quarterly Annually |
Skills Development Plan reviewed and implemented. |
|
|
Ongoing
September 2005 Ongoing |
Implementation of the Gender Policy |
|
|
September 2005 Ongoing from September 2004 June 2005 |
Revision of the recruitment policy |
|
|
30 June 2004 |
Disability policy |
|
|
Sept 2004
Ongoing |
Development and implementation of a Retention Strategy |
|
|
June 2004 September 2004 |
HIV/Aids Programme development and implementation |
|
|
March 2006 |
Develop and Implement an internal communication strategy |
|
|
December 2004 6 weekly Quarterly Ongoing |
Effective implementation of the performance management system |
|
|
Ongoing April 2005 |
Better services and motivated tourism branch |
|
|
2004-2007
2004-2007 |
Goal: Transformation
Strategic objective: Promote economic empowerment, job creation and poverty eradication
OUTPUT |
KEY PERFORMANCE INDICATORS |
MILESTONES/ACTIVITIES |
TIMEFRAMES |
Implementing labour intensive projects in such a manner that the prospects for the participants to access permanent job opportunities after the completion of the projects is enhanced (Faranani) |
|
|
March 2007 |
Recognition of local suppliers in procurement |
|
|
March 2005 |
Strategy to achieve 50% BEE usage in all departmental procurement |
|
|
March 2005 |
Set procurement targets for public entities |
|
|
April 2004 |
Facilitate the establishment of tourism charter in terms of the Broad-Based Black Economic Empowerment Act |
|
|
June 2004 March 2005 |
Transform the tourism industry |
|
|
2004-2007
2004-2007 2004
2004-207 2004-2007 2004-2007
2004-2007 |
Improved quality in respect of tourism products and services
|
|
|
2004-2007
2004-2007 |
Develop the required tourism human resources base |
|
|
2004-2007
2004-2007
2004-2007 |
Goal: Transformation
Strategic objective: Ensure the practice of good governance within the department and public entities
OUTPUT |
KEY PERFORMANCE INDICATORS |
MILESTONES/ACTIVITIES |
TIMEFRAMES |
Department to comply with all HRM and Finance legislation |
|
|
August 2004-2007 |
Improve management tools and reporting mechanisms (both DEAT and its Public Entities) |
|
|
March 2005 |
Implementation of Moral Regeneration principles |
|
|
December 2005 |
Strengthening the environment court system |
|
||
Hotline and focus on corruption (to improve propriety) |
|
|
April 2004-2007 |
Enhance the role of Green Scorpions and MCM compliance officials |
|
|
March 2005 |
Goal: Transformation
Strategic objective: Improve service delivery
Key outputs/deliverables |
Key performance indicators |
Key milestones |
Time frame |
More efficient and effective tourism team |
|
|
2004-2007 |
Programme |
Medium term expenditure estimate |
||
R thousand |
2004/2005 |
2005/2006 |
2006/2007 |
1. Administration and support |
105 655 |
124 953 |
131 196 |
2. Environmental Quality and |
171 822 |
192 182 |
212 452 |
3. Marine and Coastal Management |
271 961 |
209 529 |
231 362 |
4. Tourism |
375 621 |
398 961 |
421 629 |
5. Biodiversity and Conservation |
276 816 |
303 326 |
316 744 |
6. Auxiliary and Associated Services |
421 532 |
422 392 |
441 068 |
Total |
1 623 407 |
1 651 343 |
1 754 451 |
The Department of Environmental Affairs and Tourism work together with all national departments, provinces and local government, in the implementation of the scope of its work. The main programmes of the Department are integrated into the various DG cluster programmes and priorities. Examples of these are given below.
DG CLUSTER |
INTEGRATED IMPLEMENTATION OF DEAT PROGRAMMES IN CLUSTERS |
MECHANISMS FOR MONITORING IMPACT ON PEOPLE’S LIVES |
Economic and Employment |
|
|
International Relations, Peace and Security (IRPS) |
|
|
Social sector |
|
|
Governance and Administration |
|
|
Justice, Crime, Peace and Security (JCPS) |
|
Number of successful prosecutions |
Cooperation with provinces is coordinated through the MINMEC Tourism and MINMEC Environment and its sub structures.
3. SERVICE DELIVERY IMPROVEMENT PROGRAMME FOR 2004/2005
The work of the Department of Environmental Affairs and Tourism, as indicated in the introduction, is underpinned by the principles of Batho Pele, poverty alleviation, black economic empowerment and SMME development.
PROGRAMME 1: ADMINISTRATION AND SUPPORT
Deliverables/Outputs |
Strategy for Delivery |
Strategy to improve Service Delivery (use Batho Pele etc) |
Budgeting efficiencies and compliance with procurement procedures. |
Introduce Financial Controls. |
BAS reports on request within an hour to responsibility and programme managers. Procurement of store items within one working day. Procurement of non store items (excluding items on government contract) within a week. Provide Programme Managers with Vulindlela (Financial Management Toolkit) |
Financial Accounting and Control |
Build sufficient financial management capability. |
Procedural support in the efficient execution of the Director-General’s accounting officer role. Provide strategic, tactical, and procedural support in financial and management accounting to DEAT officials. Subsistence and travel advances and claims to be paid through EBT’s in six days. Salary enquiries to be processed in one day. Debtors must be informed about moneys owned to the Department as soon as the debt is created. Petty cash holders and supervisors to be trained on the maintenance of petty cash. Interpret and build sufficient capacity to implement and maintain Public Finance Management Act and any other supportive legislation and regulations. Payments to be made within thirty days to suppliers from days of the invoice. Client’s enquiries to be processed in two days. Claims from other Departments to be paid within seven working days. Effective information dissemination. |
Deliverables/Outputs |
Strategy for Delivery |
Strategy to improve Service Delivery (use Batho Pele etc) |
Effective Document Management |
Introduce efficient document management system (EDMS and Intranet) |
Improved turn around time on submissions and replies Proper recording, referral, tracking and filing of documents |
Strategic Human Resource Management |
Develop HRM policies and procedures that enhance DEAT effectiveness in service delivery and to align with EE plan |
Apply the Batho Pele principles including the Transformation vision of quality and equitable services in delivering a human resources management services. |
Mobilization of financial and technical resources to support the successful Implementation of key SADC and NEPAD tourism and environment initiatives. |
Actively participate and conduct lobbying in various bilateral and multilateral forums relevant to environment and tourism |
Develop and maintain a comprehensive database and develop an international resource center Create formal and informal forums with stakeholders to promote exchange of information and enhance synergies Enhanced a more strategic engagement with multilateral and bilateral bodies based on the international engagement strategy |
A coherent and consolidated strategy for the effective participation in strategic international agreements |
Integrated positions Improved reporting Improve access to information |
Create formal and informal forums with stakeholders to promote exchange of information and enhance synergies. Greater utilisation of the DEAT web page and development of a newsletter/ publication Re-design the reporting formats for international for international meetings and create an accessible database |
Integrated state of the environment reporting system |
Most activities will be outsourced. Consultation with relevant Stakeholders |
Build and extend existing partnerships. Will establish environmental information portal. Use existing networks such as GCIS and NGO’s to distribute information to stakeholders Clear communications with stakeholders Link up with existing national and regional activities such as SA ISIS, NSIF, RANESA (Resource Accounting Network for Eastern and Southern Africa), CEEPA (Centre for Environmental and Economic Policy in Africa) and SADC indicator initiative Source DONOR funding to supplement MTEF funds |
Core set of environmental/ sustainable development indicators and indexes integrated into IDP, EIP/EMP and SoE reporting processes |
Most activities will be outsourced. Proper consultation with relevant stakeholders, especially provinces and local authorities |
Re-write technical indicator information into more user friendly documents Indicator Internet site Indicator database |
Fully functional DEAT GIS Intranet facility that can support the register of protected areas, waste management information system, wetlands information system and impact assessments |
Most activities will be outsourced. |
Development of GIS Intranet and Internet Identify user requirements Use common database |
Professional development of educators and provincial officials on developed resource materials |
The activities will be outsourced. There will be proper consultation with stakeholders and provinces |
Focus on enhancing the environmental integration in the schools curriculum provides skills on the use of resources development. |
Awareness raising through celebration of calendar days (e.g. WED, Women’s day, Disability day, Youth day) |
Some activities like WED will be outsourced. There will be proper consultation with other partners, especially provinces and communities |
Clear communication with all parties to be involved |
Support schools on eco-schools (cleaning and greening initiatives) programmes |
Proper consultation with provinces, DoE and WESSA on eco-schools programme roll out |
Provide resources on how to be part of eco-schools program and benefits for schools. Source funding for cleaning and greening initiatives for the eco-schools |
Integrated environmental planning system |
Contract in capacity to align planning frameworks in new bills Contract in capacity to develop guideline document on application of new planning framework |
Target BEE companies. If necessary, set up consortium. Skills transfer to DEAT officials to be included in contract |
Co-operative environmental governance programme |
CEC Sub-Committee to consolidate targets set in EIPs/EMPs Collaborate with Auditor General on compliance monitoring Contract in expertise for environmental planning toolkits for local government Re-structure staff establishment to ensure capacity for MINTEC/CEC secretariat |
Information dissemination through website Target BE companies. If necessary, set up consortium Skills transfer to DEAT officials to be included in contract |
Programme 2: ENVIRONMENTAL QUALITY AND PROTECTION
Deliverables / outputs |
Strategy for delivery |
Strategy to improve service delivery |
Enforcement |
Roll out of enforcement strategies to all spheres of Government, in order that transgressions are identified and addressed in regard to contravention of all authorisations. Establish inter-governmental committees to address specific cases such as asbestos and mercury clean-ups. |
Transparency and Information sharing Setting service standards Consistency and quality of communication |
Develop IEM policy and legislation |
Donor funding and consultants |
Increase human resource capacity; Implementation guidelines with new regulations; Promote public participation. |
Process EIA applications |
Fill new posts, increase capacity |
Improve turn around time for applications with the increased capacity; Proper correspondence management. |
Effective system of air quality management and country wide compliance with national air quality standards |
Donor funded pilot projects wth selected provinces and municipalities. Consultation with relevant Stakeholders |
Build and extend existing partnerships. Clear communications with stakeholders and affected communities Source donor funding to supplement MTEF funds |
Effective waste minimization and pollutions abatement regime established |
Projects coordinated through CEC and departments with Waste function. Workshops with provinces. Standards to be developed by DEAT through outsourcing and a public consultation process will be initiated SABS and other standard generating bodies invited to participate |
Build and extend existing partnerships. Clear communications with stakeholders and affected communities Source DONOR funding to supplement MTEF funds Building of enforcement capacity in DEAT |
Waste Information system |
Chapter on WIS developed in the Waste bill to make reporting compulsory |
Build and extend existing partnerships. Clear communications with stakeholders and affected communities |
Extension of recycling agreement to other major waste streams i.e. tyres, glass, paper, beverage cans |
Consultation with major recycling industries Provinces to participate in the development of the MOU and MOA through process facilitated by DEAT |
Build and extend existing partnerships. Clear communications with Stakeholders. Source donor funding to supplement MTEF funds Building of enforcement capacity in DEAT |
Implementation of the national climate change response strategy to be gazetted in 2005. |
Establish project team to in cooperation with other departments and the NCCC to develop strategy. Project team with DME to be formed Participation in the air quality steering committee for vehicle emissions |
Build and extend existing partnerships. Clear communications with stakeholders and affected communities Source DONOR funding to supplement MTEF funds Building of enforcement capacity in DEAT |
Implementation of a national ozone layer protection strategy |
Committee will be formed to coordinate the strategy |
Build and extend existing partnerships. Develop Communications Strategy. Build enforcement capacity in DEAT |
Programme 3: MARINE AND COASTAL MANAGEMENT (INLCUDING ANTARCTICA)
Deliverables / outputs |
Strategy for delivery |
Strategy to improve service delivery use Batho Pele etc |
Research and Development |
Combination of in-house capacity and in sourced professional services |
Set service standards Increase access to services Increase transparency Improve information provision Maximize cost efficiency Develop capacity retention & recruitment mechanisms Establish an internship programme |
Allocation and Verification of fishing rights |
In-house and in source capacity for specialised skills |
Specific delivery standards set and output and specific time frames set |
Improved policies, procedures and information on regulation of resources |
In source capacity |
Set service standards Increase access to services Increase transparency Improve information provision Optimise cost efficiency |
New fees, levies, applications, licenses and permits for all sectors Assess monetary value of production per fishery and the fishing industry |
Use capacity in section in close cooperation with Dept of Finance. Possible in sourcing of capacity |
More interaction with resource users and Dept. of Finance Specific delivery standards, outputs and timeframe set Maximize cost efficiency Encourage suggestions and feedback |
Coastal Management Act, implementation of ORV regulations and formation of coastal Committees |
Partly in sourcing of capacity |
Set service standards Increase access to services Increase transparency Remedy failures in service provision Optimise cost efficiency |
Resource material for awareness, education and training and high level training for Government and other stakeholders |
Develop materials as specified in tender documents. Implement project In sourcing of capacity |
Set service standards Increase access to services Increase transparency Remedy failures in service provision Optimise cost efficiency |
Information and decision-support Virtual Coastal Library and Coastal Monitoring Programme |
Develop programme and implement according to tender specifications |
Set service standards Increase access to services Increase transparency Remedy failures in service provision Optimise cost efficiency |
National, Provincial and Local Demonstration and Sustainable Coastal Livelihoods Projects (Working for the Coast, Blue Flag) |
Capacity to be in sourced via tender procedures
|
Set service standards Increase access to services Increase transparency Remedy failures in service provision Optimise cost efficiency |
Local Management Committees for Subsistence Fisheries and training and capacity building initiatives |
In-source capacity |
Set service standards Increase access to services Increase transparency Remedy failures in service provision Optimise cost efficiency |
Ballast Water Programme and updated oil spill contingency plans |
In-source capacity where applicable |
Service standards Increase access to services Increase transparency Remedy failures in service provision Optimise cost efficiency |
Effective participation in NEPAD programmes |
Combination of in-house capacity and in sourced professional services |
Specific delivery standards output and timeframes set Maximise cost efficiency Encourage suggestions and feedback |
Strategies, Sector Management plans and policies for the allocation of medium and long-term commercial fishing rights. |
Combination of in-house capacity and in-sourced professional services |
Specific delivery standards, output and timeframes set. Maximise cost efficiency Encourage suggestions and feedback |
Policy for the allocation of additional Total Allowable Effort (TAE) in the net fishery. |
In-house capacity |
Set service standards Increase access to services Increase transparency Remedy failures in service provision Maximise cost efficiency Encourage suggestions and feedback |
Verifiable databases (rights registers, permits, licences and exemptions).
|
Combination of in-house capacity and in-sourced professional services |
Specific delivery standards, output and timeframes set. Maximise cost efficiency Encourage suggestions and feedback |
New levies, fees for applications, permits and licenses. |
Combination of in-house capacity and in-sourced professional services |
Specific delivery standards, output and timeframes set. Maximise cost efficiency Encourage suggestions and feedback |
Programme 4: TOURISM
Deliverables/ outputs |
Strategy for delivery |
Strategy to improve service delivery |
Expedite the implementation and monitoring of the international and domestic tourism growth strategies |
Fundi training roll-out in missions in priority and watch list markets Partner with the IMC, SA Tourism and missions to promote and defend the image of South Africa Develop the Tourism Satellite Account to monitor the economic impact of tourism Market heritage sites as tourism attractions Roll-out of the Welcome Campaign in poverty nodes and townships Tourism route development in respect of poverty nodes and townships Communicate the domestic tourism growth strategy, and monitor implementation Promotional awareness |
Increased alignment and strengthened partnerships in international and domestic tourism marketing |
Development of tourism products and services which are aligned to tourist market demand |
Completion and communication of the competitiveness study Investment mobilisation into the product and service needs identified through the competitiveness study Initiation of phase 2 of the competitiveness study |
Development of the products and services that will result in maximise value extraction from tourism. |
Ensuring transformation of the industry |
Development and implementation of the tourism transformation scorecard Funding of TEP to continue with its activities, and the monitoring and evaluation of these activities Roll-out of the tourism SMME training programme, and the evaluation and monitoring of this programme Implementation of the BEE procurement database Updating and circulation of the funding and support handbooks |
Support to BEE tourism enterprises towards growing and sustaining them |
Ensuring quality in respect of tourism products and services |
Growth in the capacity of the Grading Council Training of more black assessors Increase in the number of graded products in historically black areas. |
Facilitating a high quality of service to all tourists |
Ensure the development of the required tourism human resource base |
Ensuring that THETA functions as an effective and efficient partner in the development of the necessary tourism human resources Ensuring transformation in tourist guiding Establishment of SATI as a partner in tourism human resource development |
Ensuring that skills are developed that match demand |
Facilitate easier tourist access to South Africa and movement within South Africa |
Enhanced visa and air access for tourists from priority markets Improved tourism road and air infrastructure in priority tourism areas Enhanced access to tourism information through the establishment of an effective and efficient call centre and bookings system for the parks Fundi training for frontline SARS, DHA and DFA staff |
Increased tourist arrivals to South Africa |
Promoting regional and continental tourism growth |
Tourism agreements with priority markets, and activation of existing agreements Completion of the NEPAD action plan Partnership with multilateral organizations to promote the role of tourism in NEPAD Transformation of RETOSA into an effective and efficient regional tourism marketing structure |
Effective and integrated tourism marketing of the region and the continent |
Alignment and capacity enhancement of tourism partners, particularly at provincial government level, to promote tourism development |
Training of tourism officials in provinces on tourism Provincial SMME support activities through TEP Alignment of activities through MINMEC, MIPTECH and the MIPTECH working groups Leveraging of partnerships with DBSA, TBCSA members, etc to assist provincial tourism structures to deliver against the agreed strategic objectives Sharing of research and statistics with provinces Sharing of monitoring tools with provinces |
Strengthen cooperative governance towards achieving the shared strategic objectives of tourism |
Programme 5: BIODIVERSITY AND CONSERVATION
Deliverables / Outputs |
Strategy for delivery |
Strategy to improve service delivery |
Manage the establishment of TFCAs |
Develop project teams for promotion of international, regional and local cooperation on socio-economic development through transfrontier ecosystem management, conservation of biological diversity and cultural heritage resources |
Development of Terms of Reference with clearly defined roles and responsibilities |
Manage the establishment of TFCA's and protected areas |
The promotion of international regional co-operation and social economic development through transfrontier ecosystem management, conservation of biological diversity and cultural heritage resources; ensuring the sustainable use and equitable sharing of benefits derived from these resources. |
Continuous review |
Integrated protected area programme for South Africa |
Strategy development Capacity building Sourcing existing expertise |
Consultation Needs assessment Partnerships Coordination |
Expansion of protected areas beyond boundaries |
Strategy development Capacity building Building of partnerships |
Inter-departmental cooperation Formation of PPPs Outsourcing Coordination |
Establish a national and international system of managing biodiversity and conservation |
Implementation of the Biodiversity Bill and Protected Areas Act Develop regulations to give effect to the Biodiversity Bill and Protected Areas Act Develop regulations to give effect to the World Heritage Act. Partnerships with national and provincial departments. |
Improved consultation with stakeholders and other government departments. Clear Terms of Reference for consultants. Coordination of all activities. Better enforcement |
Promote economic improvement, job creation and poverty eradication |
Proper planning and prioritizing Appointment of consultants Identification of priority projects Community involvement and buy-in Partnerships with other government departments. |
Clear plan of action. Clear Terms of Reference for consultants Proper communication with stakeholders, especially communities Proper feedback and monitoring mechanisms in place. |
4. ORGANISATIONAL MANAGEMENT
4.1 Human resource strategy 2004/2005 to 2006/2007
Purpose of human resource strategy
The human resource (HR) strategy of this department serves:
Strategic human resource objectives
The DEAT HR Strategy supports the realisation of organisational objectives through realistic and responsible human resource policies, partnerships, research and development, taking into consideration the overall transformation objectives of the public service and consists of six strategic objectives. These are the following:
The tables that follow unpack each of these objectives, and provide an indication of key performance indicators and time frames to achieve these objectives:
No. |
Strategic Objectives |
Key Outputs |
Timeframes |
||
1. |
Improve service delivery and access through Batho Pele principles |
Measurable service standards developed. Handling of complaints guidelines developed. Compliance with Access to Information Act Development of the department’s Language Policy EDMS implementation ICT and E-government * |
July 2004 July 2004 March 2004 March 2004 April 2004 June 2004 |
||
2. |
Develop and retain a representative and performing team capable of achieving the goals and objectives of the Department |
Employment equity plan implemented Skills development plan Gender policy implemented Recruitment policy revised. Retention strategy developed |
April 2004 Aug 2004 July 2004 June 2004 March 05 |
||
3. |
Empower South Africans to participate in environment and tourism through networking, outreach strategic partnerships |
Implementation of the Internship Programme Motivation and Moral Boosting Programme |
April 2004 June 2004 |
||
4. |
Promote economic improvement, job creation and poverty eradication |
Implementation of a 50% target on BEE procurement |
April 2004 |
||
5. |
Ensure the practice of good governance within the department |
Review Administrative and Human Resources Systems of Control Compliance with all Human Resources and Transport Legislation Enhancement of the Performance Management System |
August June 2004 August 2004 |
||
6. |
Institutional Review |
Human Resources Strategy Revised Organizational Organogram Revised NEMA Section 40 Policy Policy on the appointment and use of consultants |
May 2004 July 2004 July 2004 June 2004 |
4.2 Affirmative action programme
The Department aligns itself with the provisions of the Constitution and aims to address the past imbalances through an Employment Equity Plan. This Plan provided a framework for the recruitment and development of staff from a historically disadvantaged background as well as numerical targets for the achievement of representivity.
DEAT workforce profile as at 28 May 2004
LEVEL 1-8 |
Total Posts |
781 |
|||||||
|
Male |
% |
Female |
% |
Total |
% |
Filled |
596 |
|
Blacks |
247 |
41.4% |
162 |
27.2% |
409 |
69% |
Vacant |
185 |
|
- Africans |
106 |
17.8% |
123 |
20.6% |
229 |
38% |
|||
- Coloureds |
138 |
23.2% |
35 |
5.9% |
173 |
29% |
Vacancy Rate |
24% |
|
- Indians |
3 |
0.5% |
4 |
0.7% |
7 |
1% |
|||
|
|
|
|
|
|
|
Males |
59% |
|
Whites |
107 |
18.0% |
80 |
13.4% |
187 |
31% |
Females |
41% |
|
Women |
- |
242 |
242 |
41% |
|||||
ASSISTANT DIRECTORS |
Total Posts |
192 |
|||||||
|
Male |
% |
Female |
% |
Total |
% |
Filled |
125 |
|
Blacks |
33 |
26.4% |
30 |
24.0% |
63 |
50% |
Vacant |
67 |
|
- Africans |
22 |
17.6% |
19 |
15.2% |
41 |
33% |
|||
- Coloureds |
6 |
4.8% |
9 |
7.2% |
15 |
12% |
Vacancy Rate |
35% |
|
- Indians |
5 |
4.0% |
2 |
1.6% |
7 |
6% |
|||
|
|
|
|
|
|
|
Males |
54% |
|
Whites |
35 |
28.0% |
27 |
21.6% |
62 |
50% |
Females |
46% |
|
Women |
- |
57 |
57 |
46% |
|||||
DEPUTY DIRECTORS |
Total Posts |
134 |
|||||||
|
Male |
% |
Female |
% |
Total |
% |
Filled |
75 |
|
Blacks |
27 |
36.0% |
19 |
25.3% |
46 |
61% |
Vacant |
59 |
|
- Africans |
21 |
28.0% |
16 |
21.3% |
37 |
49% |
|||
- Coloureds |
3 |
4.0% |
3 |
4.0% |
6 |
8% |
Vacancy Rate |
44% |
|
- Indians |
3 |
4.0% |
0 |
0.0% |
3 |
4% |
|||
|
|
|
|
|
|
|
Males |
68% |
|
Whites |
24 |
32.0% |
5 |
6.7% |
29 |
39% |
Females |
32% |
|
Women |
- |
24 |
24 |
32% |
|||||
SENIOR MANAGEMENT SERVICE |
Total Posts |
75 |
|||||||
|
Male |
% |
Female |
% |
Total |
% |
Filled |
59 |
|
Blacks |
23 |
39.0% |
14 |
23.7% |
37 |
63% |
Vacant |
16 |
|
- Africans |
15 |
25.4% |
11 |
18.6% |
26 |
44% |
|||
- Coloureds |
6 |
10.2% |
2 |
3.4% |
8 |
14% |
Vacancy Rate |
21% |
|
- Indians |
2 |
3.4% |
1 |
1.7% |
3 |
5% |
|||
|
|
|
|
|
|
|
Males |
71% |
|
Whites |
19 |
32.2% |
3 |
5.1% |
22 |
37% |
Females |
29% |
|
DEAT Consolidated Statistics |
|||||||||
Total Posts |
1182 |
Blacks |
64.9% |
||||||
Filled |
855 |
- Africans |
38.9% |
||||||
Vacant |
327 |
- Coloureds |
23.6% |
||||||
- Indians |
2.3% |
||||||||
Vacancy Rate |
28% |
|
|
||||||
Whites |
35.1% |
||||||||
Males |
60.2% |
||||||||
Females |
39.8% |
4.3 Information technology resource strategy
The IT functions of the department have been outsourced to the State Information and Technology Agency (SITA). The IT strategy for DEAT has the following objectives :
Breakdown of the IT strategy :
5. PLANNING INFORMATION FOR 2004/2005
5.1 Programme and output details for year ending 31 March 2005
Administration
Environmental Quality and Protection |
|||
Measurable objective: Efficiently and effectively restore, enhance, protect and maintain environmental quality, through legislative and other measures that give effect to the constitutional right of all South Africans to an environment that is not harmful to health and well-being. |
|||
Subprogramme |
Output |
Measure/Indicator |
Target |
Regulatory Services |
An effective environmental impact management process |
Revised list of activities requiring environmental impact assessments (EIAs) |
Revised list published by December 2004 |
Introduction of an appropriate environmental management tool to assess activities with potential negative environmental impacts but which are not suited to the EIA process |
December 2004 |
||
Increasing compliance with environmental quality and protection legislation |
Fully functional environmental quality and protection compliance monitoring structure, which triggers appropriate enforcement actions |
March 2005 |
|
Efficient and effective enforcement or other corrective measures for non-compliance |
Reduction in cases of serious or repeated non-compliance every year |
Decrease by April 2005 |
|
Pollution and Waste Management |
Increasing the quality of ambient air |
Reduction of atmospheric emissions |
Decrease by March 2005 |
Reduction in the quantity of prioritised, hazardous waste streams entering landfills |
Implementation of new legislation, regulations, strategies and environmental management systems for 3 prioritised hazardous waste streams |
March 2007 |
|
Measurable reduction in the quantity of prioritised, non-hazardous waste streams entering landfills |
At least 2 waste separation and recycling pilot projects under way in middle- and high-income residential areas |
April 2004 |
The aim of the Administration programme is to conduct the overall management of the department. The programme includes policy formulation by the Minister, the Deputy Minister and senior management. Other activities comprise: organising the department; providing centralised administrative, legal, and office support services; managing personnel and financial administration; determining working methods and procedures; and providing for the costs of the head office. The programme also aims to provide information to support effective environmental management and public participation in environmental governance and assess follow-up on WSSD.
Marine and Coastal Management
Measurable objective: Ensure the sustainable utilisation and conservation of marine and coastal resources through implementing an information system by 2005. |
|||
Subprogramme |
Output |
Measure/Indicator |
Target |
Antarctic Supply Vessel |
Relief voyages to Antarctica and Marion and Gough islands |
Number of voyages resulting in the successful transportation of equipment and personnel |
1 voyage per year to each destination |
Contributions (to Marine Living Resources Fund) |
Levies and fees collected as required by the Marine and Living Resources Act |
Revenue collected |
Increase revenue to exceed R150 million by December 2005 |
Allocate long-term fishing rights timeously and equitably |
BEE allocation as a proportion of all fishing rights granted |
40% in 2005 |
|
Sustainable utilisation of marine resources |
Number of new fisheries established |
3 per year |
|
Extend area of coastline under protection |
Number of enforcement officers per kilometre of coastline |
1 officer per 5km of coastline by 2006/07 |
Tourism
Measurable objective: Increase international and domestic tourism through the development of appropriate products and marketing strategies. |
|||
Subprogramme |
Output |
Measure/Indicator |
Target |
Tourism Development |
Increased tourism and public sector infrastructure investment in tourism priority areas |
Rate of increase in tourism investment |
50% increase in tourism investment by March 2007 |
Timely and accurate tourism statistics for government and the industry |
Frequency of analysis of arrival statistics |
Monthly |
|
Tourism Support |
Improved tourism industry service quality |
Percentage of tourism businesses graded |
20% of all tourism businesses graded by December 2004 |
Increased tourist visits |
Percentage increase in tourist arrivals |
4% increase in arrivals in 2004 |
Biodiversity and Conservation
Measurable objective: Protect and sustainably utilise South Africa’s natural resources through the establishment of a national system of biodiversity and conservation. |
|||
Subprogramme |
Output |
Measure/Indicator |
Target |
Biodiversity and Heritage
|
Strategies and plans for biodiversity policy
|
National biodiversity strategy and plan approved |
March 2005 |
First protective area identified in terms of national conservation strategy |
December 2004 |
||
Invasive species strategy approved |
December 2004 |
||
Enactment of the Biodiversity Bill |
April 2004 |
||
Transfrontier Conservation Areas and Protected Areas
|
Establishment of 6 transfrontier parks |
Legal agreements for the establishment and management of transfrontier areas finalised |
Memorandum of Understanding (MoU) for Limpopo/Shashe transfrontier conservation areas signed December 2004 |
Treaty for Limpopo/Shashe transfrontier conservation area signed by December 2005 |
Auxiliary and Associated Services
Measurable objective: Number of jobs and small scale enterprises created through environment and tourism projects. |
|||
Subprogramme |
Output |
Measure/Indicator |
Target |
Antarctic and Island Research |
Relief voyages |
Successful planning and executing of relief voyages to Antarctica and the Marion and Gough island bases |
1 scheduled trip per year |
Land, Buildings and Structures |
New Marion Island base |
Completion of new Marion Island base |
2006 |
Financial Assistance |
Infrastructure development and job creation |
Number of temporary job days created |
5,1 million job days by March 2007 |
Number of permanent jobs created |
3 000 permanent jobs by March 2007 |
||
Number of training days provided |
510 000 training days by March 2007 |
||
Number of SMMEs created |
900 new SMMEs by March 2007 |
5.2 Trends in the budget for 2002/2003
Expenditure in 2000/01 was R747,1 million, and then increased to R1,5 billion in 2003/04. This increase was mainly due to earmarked allocations for poverty relief, the acquisition of fisheries patrol vessels, transfers to public entities such as South African Tourism for international tourism marketing, and the Johannesburg World Summit Company for the hosting of the World Summit on Sustainable Development.
The budget includes provision for purchasing patrol vessels for the Marine and Coastal Management subprogramme. Between 2001/02 and 2004/05, a total of R501,0 million has been allocated for the purchase of the patrol vessels – one offshore and three inshore vessels.
The department’s budget increases to R1,8 billion in 2006/07. The replacement of one marine research vessel will begin in 2004/05, and the allocation will increase as building progresses over the MTEF period. The poverty relief allocation rose rapidly from R133,0 million in 2000/01 to R305,6 million in 2003/04 and further increases to R383,9 million in 2006/07.
Transfers and subsidies are a significant part of the department’s budget, totaling R1,2 billion in 2004/05. These transfers go to a wide range of bodies, but in general are for organisations promoting tourism (R341,8 million), those managing national parks and gardens (R239,0 million), fisheries (R169,2 million) and for poverty relief projects (R340,0 million).
5.3 Services to be scaled down or abolished during 2003/2004
Consideration currently being given to transferring the following functions to other departments:
Programme and outputs |
Strategies to phase out or scale down programme |
Target dates for strategies |
Biodiversity & Conservation
Marine and Coastal Management
Environmental Quality & Protection
|
Transfer to National Department of Agriculture Transfer to National Department of Agriculture Transfer to National Department of Science & Technology Transfer to SANPARKS Transfer to various parks authorities
Transfer to Department of Transport
Transfer to relevant national department (e.g. DTI, DME, Transport) |
To be determined |
5.4 Capital transfers
Programmes |
2004/05 |
2005/06 |
2006/07 |
R’000 |
R’000 |
R’000 |
|
3. Marine and Coastal Management |
119 000 |
47 302 |
67 783 |
5. Biodiversity and Conservation |
67 500 |
67 500 |
67 500 |
6. Auxiliary and Associated Services |
1 |
1 |
1 |
Total |
186 501 |
114 803 |
135 284 |
5.5 Public entities reporting to the Minister of Environmental Affairs and Tourism
South African Tourism (SA Tourism)
South African Tourism’s main aim is to market South Africa internationally as a tourism destination. It promotes tourism to and within South Africa, regulates the industry, maintains and enhances the standards of facilities and services, and coordinates the marketing activities of role-players in the industry.
Its key objectives are to:
National Botanical Institute (NBI)
The National Botanical Institute promotes the conservation and sustainable use of indigenous plant life. The institute keeps records of 25 000 plant species, and maintains three research centres and eight botanical gardens with a total of 10 000 different plant species. The gardens are important tourist attractions, receiving more than 1 million paying visitors each year.
During the past year the institute has completed new visitor facilities in Kirstenbosch, and will complete new education, restaurant and visitor facilities in the Lowveld, Pretoria, Witwatersrand and Free State gardens during 2004. Many of these capital projects have been co-financed by the Department of Environmental Affairs and Tourism’s Poverty Relief Unit, and the new facilities will provide significant increases in income and employment-generating activities by the institute.
The National Botanical Institute is the management agency for the US$12 million Cape Action Plan for People and the Environment (CAPE) project, which aims to protect threatened species from Saldanha Bay to Port Elizabeth. It is also the management agency for the US$5 million Southern African Botanical Diversity Network (Sabonet) project that is aimed at upgrading facilities and strengthening the level of botanical expertise throughout the subcontinent. The participating countries are Angola, Botswana, Lesotho, Malawi, Mozambique, Namibia, South Africa, Swaziland, Zambia and Zimbabwe. The institute has also taken over the management of the R30,0 million Working for Wetlands project.
South African National Parks (SANParks)
SANParks is the conservation authority in all national parks in South Africa. South African National Parks manages a system of 20 national parks representative of the country’s most important ecosystems and unique natural features. Commercial development and tourism (in excess of 3 million visitors per year), conservation development, and the involvement of local communities are regarded as key indicators of performance. More land was brought under protection resulting in the expansion of the Addo Elephant and Mountain Zebra National parks in the Eastern Cape; Marakele in the Limpopo Province; Namaqua in the Northern Cape; as well as Agulhas and Cape Peninsula in the Western Cape. The Free State government agreed in principle to link Qwa-Qwa Game Reserve with Golden Gate Highland National Park and to bring the two areas under SANParks’ management. Agreement has also been reached with the Eastern Cape government on the management of Woody Cape by SANParks as an integral part of the greater Addo National Park.
SANParks contributed to socio-economic development among historically disadvantaged neighbouring communities in a number of ways. Over 75 per cent of approximately R35 million of commercial development projects went to empowerment contracts.
South African Weather Service (SAWS)
The establishment of the South African Weather Services was accomplished through the South African Weather Services Act. The South African Weather Services was listed as a public entity in accordance with the Public Finance Management Act.
The objectives of the South African Weather Service are:
Marine Living Resources Fund (MLRF)
The Marine Living Resources Fund was listed as a public entity in terms of the PFMA. It aims to finance activities related to the management of sustainable utilisation and conservation of marine living resources as well as the preservation of marine biodiversity and the minimisation of marine pollution. Other socio-economic objectives include broadening access to resources by restructuring the industry to address historical imbalances and promote economic growth.
The Fund is financed from its own revenue as well as money appropriated by Parliament, in terms of section 10 of the Marine Living Resources Act. Own resources are derived mainly from fish levies, fishing permits, harbour fees and the proceeds of the sale of confiscated fish products.
Greater St Lucia Wetland Park (GSLWP)
The Greater St Lucia Wetland Park Authority, which began operating in April 2002, was established through the World Heritage Convention Act (49 of 1999). Its objectives include conservation of the Greater St Lucia Wetland Park areas’ world heritage values, and optimising tourism development, local economic development and transformation. Achievements to date include effective corporate governance, settling land claims and consolidating land in the park, constructing major infrastructure in the park, reintroducing game, and returning large tracts of forestry land to tourism and conservation. A commercialisation process is well under way, including tenders for tourism investment sites and concessioning activities. The objective of these processes is to transform the tourism sector and create employment while simultaneously ensuring the financial sustainability of the park.