Report of the Select Committee on Local Government and Administration, dated 18 October 2004:
NATIONAL COUNCIL OF PROVINCES
PROVINCIAL WEEK
6 - 10 September 2004
Consolidated Report
"Local Government as a vehicle for the successful implementation of
the social contract to create jobs and alleviate poverty."
Report prepared for the NCOP by the Research Unit of Parliament
Structure of the report
Part 1 - overview of the objectives of Provincial Week.
Part 2 - Executive Summary.
Part 3 - Transversal Trends and challenges emanating from Provincial
Week visits.
The issues are grouped under the following headings:
• Statutory compliance.
• Powers and functions.
• Delivery of municipal services.
• Infrastructure backlogs.
• Municipal finances.
• Revenue-raising.
• Operational and capital expenditure.
• Local Economic Development.
• Integrated Development Plans.
• Expanded Public Works Programme.
• Capacity issues.
• Community participation.
• SALGA.
• Traditional Leadership and Municipalities.
• Community Development Workers.
• Cross-Boundary Municipalities.
• Political tensions.
• Approval of Development Projects.
Part 4 of the report consists of the individual provincial reports:
• Eastern Cape
• Free State
• Gauteng
• Kwazulu-Natal
• Limpopo
• Mpumalanga
• Northern Cape
• North West
• Western Cape
PART 1
OVERVIEW OF THE OBJECTIVES OF THE NCOP PROVINCIAL
WEEK 2004
1.1 Prelude
On 21 May 2004 President Thabo Mbeki presented his State of the Nation
address, in which he outlined a programme for a social contract to create jobs
and promote socio-economic development.
The Expanded Public Works Programme (EPWP) is one of the key initiatives
which integrate the core objectives outlined by the President; the development of
social and economic infrastructure, poverty alleviation, enterprise development
and human resource development, all of which will be promoted through labour
intensive infrastructure development projects. The EPWP is also set to focus on
the 21 urban and rural nodes already identified in terms of the Urban Renewal
and Integrated and Sustainable Rural Development Programmes.
Infrastructure developments such as schools, roads, health facilities and housing
will use labour intensive methods with a view to creating more employment
opportunities and skills training. The vision is to combine the resources of
national and local government to implement projects, which will boost job
creation, and local economic development in identified areas, particularly where
there continues to be pockets of poverty.
Local government has been identified as playing a critical in the realisation of
government’s broad poverty alleviation programme, its strategic objectives and
targets.
The President provided clear direction to local authorities on government’s
targets for the delivery of free basic services. He made the following
commitments with respect to service delivery targets:
• Within the next five years, all households would have been provided with
easy access to clean running water;
• By December 2004, 10 million South Africans will have clean and potable
water;
• During 2004 more than 300 000 households would be provided with basic
sanitation;
• Local government, working with the state enterprise, ESKOM, will, within the
next eight years, ensure that each household has access to electricity;
• The programme to ensure easy access to clean water for all the households
within five years will also help in the fight against cholera and other
waterborne diseases.
This report presents a broad picture of the capacity of Municipalities to contribute
to the successful implementation of the social contract to create jobs and
alleviate poverty. A key issue for the 2004 Provincial Week was to determine the
readiness of local government to implement Expanded Public Works Programme
(EPWP) projects as well as other governance and finance issues facing
Municipalities. The report is intended to provide a stimulus to the NCOP as well
as relevant provincial and national Departments to provide targeted support to
Municipalities to enable the fulfillment of their constitutional mandate. This
mandate relates directly to the objectives of government’s broad poverty
alleviation programme.
In line with the NCOP’s Vision 2009 programme, of expanding its oversight to the
provinces in order to ensure continued progress towards service delivery, the
NCOP took a resolution to undertake a Provincial Week between 6 and 10
September 2004. The NCOP decided that it would be fitting that the Provincial
Week should focus on local government – the vehicle for the implementation of
the EPWP.
The permanent delegates of each province were tasked to look at the capacity,
performance and abilities of Municipalities to act as agents for the successful
implementation of the Government’s social contract to create jobs, development
and alleviate poverty, especially in poor and historically disadvantaged
communities. This was to be done with Provincial Standing Committees and
Departments responsible for Local Government, as well as SALGA, in order to
ensure a continued partnership towards improving local economic development.
PART 2
EXECUTIVE SUMMARY
Research shows that the capacity constraints, institutional weaknesses and
limited revenue hamper the ability of Municipalities to deliver these basic
services. Municipalities have come to serve much larger populations while facing
overwhelming services and infrastructure backlogs. Municipalities are therefore
faced with the task of improving not only the quantity but also the quality of basic
services being delivered to their communities.
In acknowledging these challenges, President Mbeki outlined various measures
to increase the capacity of local government to discharge its responsibilities with
regard to the challenge of economic growth and development:
• Local government will invest R38 billion in infrastructure development over
the Medium Term Economic Framework period.
• Government has been reviewing the local government equitable share
allocation and formula, set to be completed by December 2004, to ensure that
Municipalities with low fiscal capacity are adequately resourced and
empowered to collect their own revenues. President Mbeki also noted that the
review would focus on systems needed to improve municipal capacity for
credit control and implementing policies that alleviate the plight of the
indigent.
• Within the next six months, government will complete the process of ensuring
the harmonisation of the municipal Integrated Development Plans, the
provincial Growth and Development Strategies and the National Spatial
Development Perspective.
It is clear then, that government’s policy of improving the living conditions of poor
households by increasing access to basic services is being strategically matched
by attention to capacity building and infrastructure development at local level.
The NCOP is also cognisant of its own role in these processes. The principles of
co-operative government embodied in Chapter 3 of the Constitution are given
practical application through the NCOP: an institution created to afford provinces
and organised local government a direct role in national legislative processes. In
addition, Section 154 of the Constitution accords to the NCOP and the provinces
the role of strengthening and supporting local authorities.
The NCOP had sent questionnaires to the 284 Municipalities prior to the
Provincial Week, to conduct an audit of the experiences, challenges and
constraints facing local authorities. The information retrieved in this manner as
well as the Report on Provincial Week 2004 will be used by the NCOP as a
framework to develop a mechanism for monitoring Municipalities in all provinces.
There may be a need for external capacity to develop such a monitoring
mechanism, and where necessary, to augment the skills within the NCOP with
additional expertise. The NCOP may, therefore, draw on the skills of external
local government specialists to assist in the finalisation of this project.
The overwhelming finding following Provincial Week is that, despite the
enormous strides made following the restructuring process, local government
continues to face severe constraints in delivering services as well as significant
financial challenges. These must be attended to in order to ensure the readiness
of Municipalities to begin implementing the EPWP.
The NCOP is committed to ensuring follow up on areas of concern raised during
its visits as well as on recommendations for interventions and support to local
government to be submitted to relevant government departments.
2.1 Provincial Week visits
Between 4 and 10 September 2004 nine delegations, comprised of NCOP
permanent delegates, embarked on a programme to assess the state of
Municipalities in all nine provinces. The programme of each delegation included
visits to at least four Municipalities, in most cases a briefing by the Local
Government MEC and provincial Department responsible for Local Government,
a briefing by the South African Local Government Association (SALGA) as well
as visits to community social development projects. Delegations were
accompanied by Provincial Standing Committees and in some instances
representatives of SALGA’s provincial offices.
Each delegation compiled a report, which highlighted the issues of concern noted
during the week’s visits and made recommendations on action to address those
concerns and weaknesses. The individual report of each province is available on
request from the Clerk of the Papers at the national Parliament. It is also
expected that provinces will follow up on many of the issues raised in those
reports.
The delegations found many Municipalities throughout the country to be well
functioning; delivering services of high standards and making real contributions
to the lives of the communities they serve. But in some areas grave concerns
were recognised and these revealed that there is much room for improvement.
This report distils the key issues examined by the delegations, areas that must
be addressed if local government is to respond to the President’s vision. National
and provincial government should take note of the findings contained in this
report to ensure that their initiatives and programmes have the desired impact at
local level.
Municipalities selected for visits during the Provincial Week were a combination
of local, district and metro Municipalities with either Mayoral Executive or plenary
type systems. This allowed delegations to assess a range of Municipalities
representing the spectrum of the local government system.
2.2 Challenges faced in compiling this report
In compiling this report a number of constraints must be noted as these impacted
to varying degrees on this report:
• Firstly, all the provincial reports depended largely on the information
provided by Municipal and Departmental officials, whether in the form of
verbal or documented presentations. While all responses were recorded,
in most cases, time constraints prevented delegations from verifying all
information provided.
• Secondly, many Municipalities appeared to lack the necessary capacity to
respond adequately to the delegations’ request for information. In such
cases, there may be a need for a follow-up visit to examine the challenges
being faced.
• Thirdly, not all Municipalities followed the prescribed process in finalising
their questionnaire; some Municipalities did not obtain the political
endorsement in the form of approval by Council.
2.3 The following Municipalities were visited:
Eastern Cape
King Sabata Dalindyebo Local
Municipality
OR Tambo District Municipality
Ntabankulu Local Municipality
Umzimvubu Local Municipality
Kouga Local Municipality
Nelson Mandela Metropolitan
Municipality
Amathole District Municipality
Jeffrey’s Bay Local Municipality
Gauteng
Johannesburg Metropolitan
Municipality
Ekurhuleni Metropolitan Municipality
Nokeng Tsa-Taemane Local
Municipality
Metsweding District Municipality
Kungwini Local Municipality
Free State
Maluti-a-Phofung Local Municipality
Mafube Local Municipality
Moqhaka Local Municipality
Motheo District Municipality
Kwazulu - Natal
Ethekwini Metropolitan Municipality
Umkhanyakude District Municipality
Newcastle Local Municipality
Hibiscus Coast Municipality
Limpopo Province
Aganang Local Municipality
Sekhukhune District Municipality
Groblersdal Local Municipality
Mopani District Municipality
Letaba Local Municipality
Vembe District Municipality
Makado Local Municipality
Mpumalanga
Steve Tshwete Municipality
Thembisile Municipality
Lekwa Municipality
Albert Luthuli Municipality
North West Province
Moretele Municipality
Kgetleng Local Municipality
Klerksdorp Municipality
Kagisano Local Municipality
Northern Cape
Sol Plaatje Municipality
Siyanda District Municipality
Hantam Municipality
Emthanjeni Municipality
Western Cape
Theewaterskloof Municipality
City of Cape Town Metro
Municipality
Drakenstein Municipality
PART 3
TRANSVERSAL TRENDS AND CHALLENGES EMANATING
FROM PROVINCIAL WEEK VISITS
The findings in this chapter are drawn from individual provincial reports that are
contained in the addendum. Hard copies can be obtained from the Clerk of
Papers of Parliament. This chapter outlines transversal trends and challenges in
a number of thematic areas. This chapter is necessarily broad in its approach
and does not attribute specific examples to specific Municipalities in specific
provinces. The nine chapters present these individual provincial reports and are
available separately as freestanding documents.
The objective of this chapter is to formulate general trends and challenges
emerging from Municipalities visited as well as to comment on their readiness to
implement national government’s priorities as set out by the President in his
State of the Nation Address in May 2004. Critical to this is the state and
readiness of Municipalities to implement the Expanded Public Works
Programme, which depends on the effective functioning of Municipalities.
3.1 The following findings are recorded:
3.1.1 Statutory Compliance
(With the suite of local government legislation, including the Municipal Finance
Management Act, Municipal Structures Act, Municipal Systems Act and Municipal
Property Rates Act.)
Generally, Municipalities indicated that they are already in the process of
implementing legislation such as the Municipal Systems Act and the Municipal
Structures. Most are challenged in the implementation of the Municipal Finance
Management Act as well as the Municipal Property Rates Act, which is not in
effect as yet. The capacity of Metro Municipalities to implement the MFMA is
good. Ekurhuleni Metro Municipality, for instance, is already in Phase 3 of
implementing the Act. In many Municipalities the capacity of the finance
department is not adequate and this may hamper the rate of compliance with the
MFMA.
Some Municipalities, as in the Eastern Cape and Free State, indicated that they
are encountering problems with implementing certain provisions of these
statutes.
With respect to specific provisions of the Municipal Systems Act, 2000, many
Municipalities indicated that, for instance, employees especially Municipal
Managers either have not yet signed or will soon sign performance contracts as
prescribed by Section 57 of the Municipal Systems Act.
The process of appointing Municipal Managers is a problem area where
legislative compliance has been lacking. In one case in the Free State, junior
staff members have been considered for the position of Municipal Manager, while
the individual continued to hold other positions. The Mayoral Committee, or the
Council as a whole, were not consulted or involved in the appointment
processes. In many Municipalities, there has been a large staff turnover,
especially of Municipal Managers.
It is therefore recommended that:
1. There is a need for ongoing monitoring and evaluation of statutory
compliance by both the national and provincial government to ensure that
the legislative framework is observed and implemented at the local level.
There is a need for focussed oversight over compliance. The key
stakeholders, who need to work cooperatively and on an ongoing basis,
include Treasury, Department of Provincial and Local Government
(DPLG), the provincial departments of Local Government, SALGA, as well
as the NCOP and provincial standing/portfolio committees.
3.1.2 Powers and functions
The redesign of the system of local government into a two-tier system continues
to provide challenges. It appears that in some provinces structural problems are
arising due to a lack of clarity around functions and powers, between local and
district Municipalities. Where district Municipalities are weak, or have poor
relationships with local Municipalities, resources located at district level are often
not shared effectively.
Within some Municipalities, there are problems with the relationships between
the offices of the Mayor and Speaker, the Executive/Mayoral Committee, the rest
of the Council and/or administration. In some cases, Executive Mayors take
decisions on their own, or only inform their Executive Committees/Council or only
a few committee or council members, at other times exercise powers and
functions belonging to other officials, acting as technical backup. Since there are
often irregular meetings of the Committee, Executive Committee members are
vulnerable to the decisions taken by the Mayor.
The relationships are often characterised by:
• Ordinary councillors being sidelined from important decision-making.
• Processes, which are centralised at the executive level.
• Lack of consultation.
• Lack of cooperation.
• Lack of or poor information sharing and communication.
• Lack of capacity building.
In some cases, Municipalities do not even enjoy cooperative relations with the
provincial government.
Furthermore, there continues to be problems regarding the division of powers
and functions between the local and district Municipalities. This confusion relating
to the division of powers, functions, as well as responsibilities of both local and
district Municipalities creates tensions that hamper the proper functioning of the
municipality, which has implications for service delivery. The amendment, as well
as the implementation, of Section 84 of the Municipal Structures Act (117 of
2000), which transferred the most significant (bulk) municipal services from local
to district Municipalities, is obviously creating problems and confusion.
In some Municipalities, the establishment of the administration has not yet been
completed. The completion of skills audits, assessments, organograms and staff
placements, as well as equity plans, should be finalised as a matter of urgency.
Many Municipalities noted that the rapid transformation of the local government
sphere since 2000 has led to Municipalities having to quickly develop financial
management, project management, personnel and management skills. Not all
Municipalities are therefore working at optimal capacity, particularly in areas with
per-existing poor revenues, weak infrastructure and weak institutions.
The implementation of the Skills Development Act, 1998, and the Growth and
Development Summit resolutions in the form of learnerships must be
accelerated.
There is need for urgent attention to ensure that there are clearer guidelines,
proactive intervention mechanisms and the monitoring of division of powers and
functions, as well as ensuring that responsibilities of both the executive and
administration at the local government are carried out. There is a need to
improve intergovernmental relations and cooperative governance, especially
between local and district Municipalities, provincial and local government levels,
as well as with national government, especially through properly functioning
Intergovernmental Relations Forums. In all municipal areas in South Africa with
District Municipalities, intergovernmental structures must be initiated in order to
facilitate co-operative governance. These structures should convene mayors of
the district and the local Municipalities, municipal managers as well as key
officials.
It is therefore recommended that:
1. Mayors must convene meetings of the Mayoral Committees on a regular
basis.
2. The responsibility of ensuring that powers and functions, as well as
responsibilities as provided for in the respective statutes are appropriate
and fully understood lies with both the national Department of Local
Government and Provincial departments of Local Government. The
NCOP, the provincial committees on local government and SALGA need
to collectively and continuously exercise oversight over the system.
3.1.3 Delivery of Municipal Services
Generally, Municipalities indicated that they are providing free basic services to
their communities and that this is informed by the existence of an indigent policy
and a register. It therefore appears that most Municipalities have made
significant progress in their provision of free basic services, a policy adopted by
Cabinet, aimed at the provision of free basic municipal services to every poor
household in the country. These services, often referred to as "a basket of
services", are solid waste, water, sanitation and electricity.
In spite of such progress, there continues to be serious backlogs in service
provision in many Municipalities. Most Municipalities are not even service
providers of water or electricity. Many depend on Eskom as their service provider
for electricity, but in most instances agreements with Eskom have not been
finalised. In other Municipalities, there are still problems with the installation of
functioning water meters; thus casting serious doubts about claims that free
basic services are being provided.
Most Municipalities have not fully restructured their service provision, with the
exception of certain Metros. Johannesburg Metro Municipality, has, for instance,
established entities to oversee the delivery of water, electricity and sanitation
services. There remains a need to establish the efficacy of these entities and
whether they are viable for other Municipalities.
Similarly, it is not clear how indigent policies or registers are administered or how
often these are updated. Many Municipalities continue to encounter difficulties in
updating their indigent registers; often the onus is left on individual community
members to come to Municipalities to provide the necessary information when
their status or circumstances have changed. There is no profiling within
Municipalities, of what constitute indigents, to determine the socio-economic
status of communities to better inform decision-making or needs analysis to
provide better and quality services to those who are in need. Given the fact that
some ward committees are dysfunctional or there are problems in setting them
up, many councillors are unable to interact with their wards or communities to get
their inputs on services needed or to collect information that can inform the socioeconomic
conditions or status of communities.
It is therefore recommended that:
1. The relevant sector Departments, at both national and provincial level,
need to monitor the provision of basic services by Municipalities, to ensure
that those services meet national norms and standards.
2. A national policy to establish minimum standards for the provision of
sanitation must be drafted as a matter of urgency.
3. The Department of Mineral and Energy and the Department of Local
Government, at national and provincial levels, must ensure the
implementation of agreements with Eskom to provide free basic electricity
to those communities where Eskom is the service provider.
3.1.4 Infrastructure backlogs
The Metros visited displayed relatively well-developed infrastructure, for instance,
most properties are metered and have water borne sanitation. Outside the
metropolitan areas, however, and particularly in informal settlements, households
continue to use the Ventilated Pit Latrines (VIPs) and a number still use the
bucket system. Most are not metered.
In many Municipalities, including the Metros, aging infrastructure requires
ongoing maintenance in order to minimise interruptions to electricity supply to
residents.
It is therefore recommended that:
1. The infrastructure required to phase out the bucket system and the use of
pit latrines must be developed by Municipalities. Optimum use should be
made of funds allocated from the Municipal Infrastructure Grant, through
the ring fencing of funds for this purpose.
2. All provincial departments should carry out an audit of the extent of
infrastructure backlogs and determine the cost of reducing those backlogs.
In this regard, the study on infrastructure backlogs by the Gauteng
Department of Local Government may provide guidance.
3.1.5 Municipal Finances
Municipalities were positive about the Municipal Finance Management Act
(MFMA) of 2004, as it is seen as an important mechanism that will help address
financial issues in an integrated manner. Yet, municipal finances continue to
pose a serious challenge for the local government sphere. Municipalities face a
range of problems; including billing, debt collection, and financial reporting and
asset management. The credit worthiness of many Municipalities is problematic
and therefore they are not able to raise loans from banks.
It is clear that not all Municipalities are fully capacitated to comply with the
MFMA. Most indicated that they have started to implement some of the
provisions of the MFMA and that some of the required financial systems have
been put in place (e.g. audit committees, tender committees, revenue collection
and credit control measures, multi-year budgets, performance management
systems, etc.).
Tender Committees are constituted by Section 57 of the Municipal Systems Act
(2000) managers, comprising the Municipal Manager as the chairperson,
together with other municipal managers. Councillors or politicians are not allowed
to serve on these Committees in terms of the MFMA. The problem encountered
with these Tender Committees is that there are no proper appeal mechanisms,
often leaving these committees to review their own decisions. There are
allegations of corruption relating to procurement or awarding of tenders within
Municipalities, and since many of the Municipalities do not have anti-corruption
policies, Municipalities are not proactively or effectively attending to the
allegations of corruption.
It is therefore recommended that:
1. Audit committees must work towards the goal of ensuring that
Municipalities receive unqualified reports.
2. A review of current tender processes, including the advertising of tenders,
awarding and the appeal of decisions, is needed, to assess whether the
processes are fair and adequate.
3.1.5.1 Revenue Raising
Municipalities across the provinces struggle with revenue collection. A number of
Municipalities have begun to employ private companies to collect arrears for
services and, so far, there appears to be marginal success and improved
recovery rates in such Municipalities. However, the use of such private
companies should be carefully monitored to ensure that they conduct their
business in the best interests of the Municipality.
In many Municipalities a significant number of households are indigent, which
has the immediate result of reducing the revenue raising capacity of those
Municipalities, since the indigent cannot pay for services.
The debt inherited by many Municipalities following the demarcation process, is
substantial. In most cases such debt has not yet been rescheduled or written off.
It appears that Municipalities require assistance to do so.
There is no uniform policy regarding credit control or collection of revenue, with
many Municipalities still being owed particularly by government departments.
There are problems with billing, collection of money for rates and services
provided by the Municipalities. Many Municipalities depend largely or exclusively
on the equitable share as their source of revenue.
It is therefore recommended that:
1. Treasury, at national and provincial level, should provide guidance to
Municipalities on the management of inherited debt. Negotiations on the
writing off of debt must be conducted. Alternatives, such as selling the
debt off to the private sector, must be employed.
2. In areas where there are low levels of economic activity, Municipalities
must be assisted by the provincial government to develop growth and
development strategies to ensure the economic development of the area.
3. A national indigent policy is needed; a holistic policy that synchronises the
criteria to enable those who qualify as indigent to receive a range of
services that may include a social grant, basic services and so forth.
4. There continues to be a need to align the financial years and processes of
national, provincial and local government.
5. A national policy on credit control must be finalised, which should take
cognisance of the indigent.
6. A national policy on anti-corruption must be finalised.
7. The ongoing review of the equitable share formula must take into account
poor Municipalities and be biased towards them.
3.1.5.2 Capital and operational expenditure
In the local government sphere as a whole, operational expenditure, including
personnel expenditure, has been increasing. In one Municipality, the reason cited
for the sharp increase in operational expenditure was the perception of an
unfunded mandate.
It is therefore recommended that:
1. The reasons behind the trend of growing personnel expenditure must be
investigated. Appropriate measures must then be taken to reverse the
trend of increased operational expenditure.
2. An investigation should be done on the impact of the amalgamation
process on Municipalities and its contribution to these expenditure trends.
3. Where necessary a skills audit should be completed to ensure appropriate
staff placement within the administration.
4. SALGA should continue to monitor the non-alignment of functions with
revenue.
3.1.6 Local Economic Development
While many Municipalities pointed out that they have developed LED policies,
many are encountering problems. These policies are often wish lists, with
projects that are not properly planned and costed, aligned to their budgets and
IDPs. There is a lack of uniform policy, project planning and access to financing
or funding sources. Smaller Municipalities do not have broad economic base and
these present particular challenges. There is need to profile the socio-economic
state of all Municipalities so that there is valid data that can be used for targeted
interventions and assistance. Local Economic Development plans should take
into account the resources available in a particular area, for instance, tourism
and agriculture.
It is therefore recommended that:
Provincial governments need to provide more clarity on the nature of the
LED programme, its initiatives, strategies and implementation framework.
3.1.7 Integrated Development Plans
In the period following the December 2000 elections, Municipalities were required
to compile interim Integrated Development Plans (IDPs). It appears that
Municipalities have improved on these interim IDPS.
Most Municipalities indicated that they have linked their IDPs to their budgets, as
required by the Municipal Systems Act. Similarly, there are indications that
Municipalities in drawing their IDPs they also have aligned these to their
respective Provincial Growth and Development Strategy and the National Spatial
Development Strategy. However, there seems to be an over-reliance on
infrastructure development. There is a need to place equal emphasis on the
social, economic and capacity enhancement projects.
In spite of claims by many Municipalities that their IDPs are linked to their
budgets, there were also reports that refuted this and showed that in many
Municipalities, there is, in fact, a lack of funds to implement IDP projects. It
appears that Municipalities sometimes use funds to maintain infrastructure and
not to implement IDP projects, for instance. This also highlighted a need for
greater alignment of IDPs with Provincial Growth and Development Strategies,
which will streamline funding and allow greater co-ordination of projects.
3.1.7.1 Some of the challenges related to IDPs:
• Availability of funding to implement priority projects.
• Weak project management skills within Municipalities.
• The consequent use of consultants to draft IDPs.
• Weak capacity for the purpose of monitoring and evaluation.
• Lack of political participation in the IDP drafting process.
• Lack of participation by sector departments within provinces.
• No performance management systems are in place.
• Lack of adequate community participation.
It is therefore recommended that:
1. During the next review, IDPs need to be realigned to take into account the
EPWP. The priority projects therefore need to incorporate labour intensive
elements and focus on job creation.
2. While community participation in municipal processes is essential, it is equally
important for the Municipality to maintain an educational strategy to inform
communities about the Municipality’s priorities, challenges and constraints.
Mechanisms to ensure timeous feedback to communities should be
developed.
3. The annual IDP review process is important, so that Municipalities can
consult with communities and related stakeholders on their changing needs
and priorities.
4. The contribution of all spheres of government to the financing and execution
of Municipal IDPs must be strengthened.
3.1.8 Expanded Public Works Programme
Many Municipalities in or close to metropolitan areas indicated that they are
ready or have started to implement EPWP related projects. Those Municipalities
that have either been declared nodal areas or identified for future URP/ISRDP
projects are ahead of most in terms of projects already being implemented and
having accessed funding.
However, many Municipalities, especially smaller Municipalities who do not have
broad economic base or are depending on institutional grants such as the
Municipal Infrastructure Grant (MIG), are falling behind. It appears that these
Municipalities, across the country, are not ready to implement the EPWP. Many
are implementing job creation projects but without the labour intensive
component and with limited emphasis on skills transfer.
It will be difficult for Municipalities to find projects that comply fully with EPWP
conditions because there is still a need to train stakeholders who must participate
in the implementation of EPWP compliant projects. Some of the MIG committed
projects as well as those that are being committed are labour intensive even
though they have not been declared EPWP. Stakeholders will require training
before they can be in a position to use the system. This might complicate
reporting. The delay in the establishment of Performance Management Units
(PMUs) might negatively affect progress in the implementation of projects. Some
of the fields in the Project Registration form require information that might be
difficult to get hence it might delay the submission of forms.
It is therefore recommended that:
1. Sector Education and Training Authorities (SETAs) must conduct training
on labour intensive methods in order to capacitate Municipalities to
implement EPWP projects, specifically. Other SETAs should continue
working to capacitate Municipalities on other essential skills.
2. The project management skills within Municipalities must be developed,
using and developing the Project Management Units (PMUs) as a
resource.
3. The national Department of Public Works must take responsibility for
conducting an awareness campaign on the objectives and expected
outcomes of the EPWP.
4. Municipalities must establish steering committees representing relevant
sector Departments and senior municipal officials from district and local
Municipalities in a municipal area, to drive the implementation of the
EPWP.
3.1.9 Capacity Issues
Capacity is a pre-condition for proper functioning local government and in order
for Municipalities to discharge their constitutional and legislative mandates of
quality and sustainable service delivery. However, capacity is more than training.
Capacity includes institutional capacity, management capacity, skills
development, financial capacity, etc. Although there continues to be some form
of capacity building programmes and assistance received by Municipalities, this
is not necessarily focused or targeted to meet the specific needs of
Municipalities. Many Municipalities indicated that they are experiencing
difficulties related to capacity or lack thereof. Some Municipalities are
encountering capacity problems relating to human resources, project
management and financial management, in particular.
3.1.10 Community Participation
Community participation, which is a critical component of local government,
remains one of the challenges facing Municipalities. Although Municipalities
indicated that ward committees have been established and that they are
receiving support, it appears that many are not functioning. Community
participation is also affected by the nature of relations within the municipality’s
executive and administration. Where there are problems within the executive and
administration of the Municipalities, community participation is affected
adversely.
It appears that, in Municipalities where there are higher levels of participation, the
service delivery needs of communities tend to be better identified, which makes
targeted service delivery possible. Ward committees expressed the need for
further administrative and financial support. In addition, the fact that Ward
Councillors are part-time provides further difficulties.
It is therefore recommended that:
Ward committees should be provided with adequate administrative and
financial support.
Discussions should begin on whether Ward-Councillors should continue to
work in a part-time capacity.
3.1.11 SALGA
It was widely acknowledged by Municipalities that SALGA has a pivotal role to
play in capacitating and training Councillors and municipal officials as well as
assisting Municipalities to comply with their statutory obligations. Most
Municipalities cited the participation of their officials and Councillors in SALGA
training programmes. Nevertheless, in its own meetings with SALGA, delegations
noted the severe capacity challenges with which SALGA is currently faced. In
many provinces this shortage may be attributed to the fact that the leadership of
SALGA also hold senior, full-time posts in Municipalities.
It appears that in many cases there are inadequate mechanisms to ensure
thorough communication and report-backs from SALGA back to municipal level
and vice versa.
The role of SALGA is not clear in some Municipalities. Concerns have been
raised about the nature of relations between SALGA and Provincial Government.
Better relations between SALGA and Provincial Government are necessary in
order for these stakeholders to conduct oversight and provide capacity to local
government. However, in many provinces SALGA is facing capacity challenges.
It is therefore recommended that:
1. The internal capacity of SALGA’s provincial’s offices must be more fully
developed, both in terms of human resources and financially. This will
enable SALGA to maximise the opportunities available to represent local
government in legislative processes at national and provincial level.
2. The provincial legislatures, in general, and provincial Portfolio Committees
on Local Government, in particular, must continue to foster strong
relationships with SALGA’s provincial offices and must adopt a cooperative
stance in any relevant oversight work conducted.
3. SALGA must devise mechanisms to monitor the appropriateness and
effectiveness of its training programmes.
3.1.12 Traditional Leadership and Municipalities
In the provinces of the Eastern Cape and Kwazulu Natal, the relationship
between traditional leaders and the Council was examined. It was found that in
most cases the relationship is co-operative. Traditional leaders make input in
Council meetings through Imbizos, Indlu Yenkosi and in their traditional
institutions.
Amakhosi’s falling within the Ethekwini Metropolitan Municipality felt that it was
crucial to unite at local level to be more organised. Workshops to empower
themselves are often conducted and the aspects of workshops include
leadership, team building, etc. They are remunerated by the project. There are
problems when Amakhosi are divided but there was an appeal for unity amongst
Amakhosi. The issue of consultation between the councillors and Amakhosi in
relation to projects created problems and political alienation. There was also an
appeal for a budget for amakhosi’s.
It is therefore recommended that:
• A budget should be allocated for the amakhosi to execute their functions,
for instance, the budget must address compensation for the cost of
attending meetings.
• Government should involve the amakhosi when dealing with issues such
as land use.
• The role of the amakhosi within the Constitutional and legislative
framework, it was argued, should be amended to allow for greater
decision-making.
• There is a need for the swift establishment of local traditional councils.
3.1.13 Community Development Workers (CDWs)
The Community Development Workers programme has been rolled out in most
provinces and many CDWs have been deployed in Municipalities.
3.1.14 Cross-boundary Municipalities
The long-term viability of many Cross-Boundary Municipalities is questionable.
Yet it appears that there is little interaction between affected Municipalities and
the Demarcation Board.
In Gauteng it was found that the cross-boundary District Municipality,
Metsweding, and its two local Municipalities, are without a sustainable economic
development plan and this impacts negatively on service delivery and job
creation. In such a case the NCOP has recommended that the provincial
government assist the Municipalities to develop a growth and development
strategy, aligned with the Gauteng Provincial Growth and Development Strategy,
to ensure sustainable economic development in the district.
It is therefore recommended that:
1. The participation of communities in the finalisation of the demarcation of
Cross-Boundary Municipalities is important, so that the merging or
incorporation of such Municipalities serves the interests and needs of the
affected communities.
2. The viability of these Municipalities must be determined and in this regard
there must be frequent interaction between the Demarcation Board, the
Municipalities themselves and the Department of Provincial and Local
Government.
3.1.15 Political tensions
In many Municipalities there are real tensions between the different political
parties in Council. In some cases, these tensions are divisive and have a
negative impact on the functioning of Council. Often these tensions extend to the
relationship between Councillors and officials. Accusations of interference in the
administration of the Municipality are levelled against Councillors while it was
noted that officials often disregard Council resolutions. These tensions are
exacerbated in cases where Councillors lack the relevant skills and experience.
In Metro Municipalities, particularly in Gauteng province, which has the highest
number of Metros, there appears to be limited party political tensions.
It is therefore recommended that:
1. Councils should devise mechanisms to track resolutions and monitor the
implementation of decisions.
2. There should be clear guidelines on the roles and responsibilities of
Councillors and officials, as well as the Councillors, Mayor and the
Municipal Manager and between the Mayor and the Speaker’s office.
Regard should be had to the relevant legislative provisions on these
responsibilities, for instance, the provisions of the MFMA.
3.1.16 The approval of development projects
Many Municipalities raised concerns with the delays in the process of securing
approval for development projects. Such delays were attributed either to a lack of
capacity or the Environmental Impact Assessment processes, which are often
seen as cumbersome.
It is therefore recommended that:
A discussion be convened between DPLG and the national Department of
Environmental Affairs and Tourism on the unintended consequences of
environmental laws, particularly the Environmental Impact Assessment
requirements.
3.1.17. Further issues to consider:
Many issues were raised during Provincial Week meetings that do not fall within
the purview of the local government portfolio or the themes that were considered.
It is recommended that they be taken up for consideration in future, either by the
relevant Select Committee or the appropriate sector Department. Two such
issues are: the provision of Municipal Health services and the social grants
payment system.
In this regard, it is recommended that:
The joint Health and Local Government MinMec process to discuss the
implications around municipal health services must be speeded up.
There is a need to improve the payment system for social grants, to
eliminate queues and provide adequate facilities at the payout venues.
3.1.18 Further recommendations to note:
We recommend that relevant departments take note of the priority areas
identified in the report, where their assistance could be most effective in the short
to medium term. In overcoming these and many other challenges, delegations
also identified a number of necessary steps to be undertaken by local authorities
towards improving the image and performance of local government:
• The need to improve the image of the local government, Municipalities
and councils to address issues such as corruption, nepotism, fraud,
amongst others.
• The need to work toward the ultimate objective of creating non-partisan
institutions in the country.
• The IDPs and EPWP projects need to be fast tracked in some
Municipalities.
• Water resources in specific areas need to be allocated and distributed
fairly to all communities within the jurisdiction.
• To conscientise communities on the need to pay for services rendered so
that Municipalities lower their debt burdens.
• To ensure that municipal officials and communities engage in relevant
dialogue to facilitate better services for all.
• To improve intergovernmental relations to ensure maximum delivery of
services.
• To capacitate, skill and enhance participation of councillors within SALGA
structures.
Report to be considered.