PREFACE
In accordance with the applicable prescripts and policies, the Department of Land Affairs (DLA) has, once again, produced a detailed strategic plan that covers all aspects of its mandate and functions. However, this strategic plan is a major improvement on the previous plan as it is a multi-year plan covering four financial years from 2002/3 to 2005/6, and is linked to the Medium Term Expenditure Framework (MTEF). Based on a more or less similar format as the one used in the previous year’s plan, this strategic plan sets out clear and measurable outputs, targets, time frames and activities, against available budgets, for the entire four-year period.
The major priority areas covered by the plan in the area of land reform include the disposal of State land, tenure reform, the increasing pace of delivery of the Land Redistribution for Agricultural Development (LRAD), and continued focus on vulnerable groups such as labour tenants, farm workers, women and youth. Another critical area where this plan reflects progress is with regard to the introduction of a new Land Redistribution for Housing Sub-programme. The Department has now committed itself to a rapid land release programme to make land available for housing purposes and, towards this end it has established a close working relationship with the Department of Housing. Whilst this is not an entirely new initiative given that the Department has, since 1995, implemented a land redistribution sub-programme for settlement purposes in both rural and urban areas, this sub-programme seeks to broaden the existing scope of delivery in order to ensure that the need for land for housing is effectively responded to. The two Departments will work jointly in a more or less similar fashion as the DLA and the National Department of Agriculture are doing in respect of LRAD.
Planning around the Tenure Reform Programme has benefited immensely from the National Tenure Reform Conference held in Durban in November 2001. The open and consultative modus operandi of the conference ensured that the Department received a rich set of recommendations on how to tackle some of the more difficult issues, particularly with regard to tenure reform in communal areas. Most importantly, the conference gave clear pointers towards the best way of addressing the issue of land administration in the communal areas in such a way that the communities, their Traditional Leaders, Provincial and Local Government structures, as well as the Department of Land Affairs can all work together and manage an efficient system that promotes rural economic development.
The Department has also ensured that the process of implementing the land reform programme should interface in a meaningful and dynamic way with the Integrated Sustainable Rural Development Programme (ISRDP) and the Urban Renewal Programme (URP). In the case of the former, emphasis continues to be placed on activities around tenure reform in all 13 ISRDP nodal areas. In the latter case, the area targeted for land acquisition and/or redistribution through the disposal of state land has been broadened to cover more URP nodal areas such as Mdantsane in the Eastern Cape, Kwa Mashu in KwaZulu/Natal and Galeshewe in Northerc Cape.
This strategic plan also continues the process of firming up functional integration within the Department by fostering synergy and synchronisation among its functional components and sharpening their various roles in the Land Reform Programme. Thus, the key technical support functions such as Deeds Registration, Cadastral Surveys and Surveys and Mapping are now undergoing a process of transformation that not only seeks to address concerns around employment equity, but also to ensure that these functions become part and parcel of the process of delivery in land reform and the improvement of the socio-economic conditions of our people. A major output in terms of this plan is, therefore, the review of the legislation relating to the Deeds Registry function in order to ensure a more equitable access to Deeds registry facilities for the inhabitants of all nine provinces of our country, as well as to address certain problematic aspects of the law, particularly those that continue to discriminate against women.
A number of major deliverables have been outlined in terms of this strategic plan in respect of the spatial planning function, which include practical work to be done in giving support to Municipalities in incorporating spatial plans into their respective Integrated Development Plans (IDPs). This is set against the backdrop of work of a very high standard that has been done in formulating relevant policy and legislative frameworks, such as the White Paper on Spatial Planning, the Land Use Management Bill, the Spatial Information Bill, and the Planning Profession Bill.
The areas of financial and human resource management, and in particular expenditure management, and the decentralisation programme have seen great improvement over the past year. This plan sets out ways and means of addressing new challenges, particularly in the areas of information technology, performance management and communication.
The Department is now demonstrating its commitment towards achieving integrated governance and delivery through increased and effective participation primarily in the Social Sector Cluster, and also in the Governance and Administration Cluster, the Economic Cluster, and the Justice, Crime Prevention and Security Cluster (JCPS) Cluster. As a result of these efforts the Department, as reflected in this plan, has factored NEPAD, SADC and the WSSD into the mainstream of its work.
Once again, we look forward to a productive and exciting year that, we believe, will be characterised by further improvement in the quality and quantity of our delivery.
Ms THOKO A DIDIZA
MINISTER FOR AGRICULTURE AND LAND AFFAIRS
DATE:
INTRODUCTION
The most important characteristic of this strategic plan is that the strategic thrust of the management process within the Department of Land Affairs (DLA or "Department") is beginning to shift from the macro to the micro level. In other words, the Department is now in the process of moving away from formulating strategies and implementation systems in respect of wider processes such as restructuring, decentralisation, policies and systems in respect of land reform and spatial planning, and the alignment of organisational structures and systems to new policy directions. This is largely because the work of strategising around these processes is now virtually complete, and what remains is to implement the strategies, systems and procedures that have been formulated. Moreover, the process of compiling this strategic plan did not focus on the formulation of the vision and mission of the Department and its key strategic objectives, as these were put in place during the course of strategic planning for the previous year.
Whilst it is true that in some areas, such as the Tenure Reform Programme, the policy formulation process is still incomplete, the various Branches, Chief Directorates and Directorates are now gearing themselves up to implement their various programmes. A key characteristic of the strategic focus at the micro level is the development and refinement of outputs and specific projects at the operational level that have to be implemented. This also demonstrates that the Department’s strategic planning framework has matured and the planning systems have become entrenched.
It may thus be said that this strategic plan is of a higher standard in a technical sense than its predecessor, and this plan clearly demonstrates that the DLA has now established a firm foundation for its planning processes. Having gone through an entire year during which the Department has tested the strategic plan that it put together for the 2001/02 financial year, the logical next step was to refine and improve on the previous plan at the levels of both its formulation and implementation. This strategic plan therefore also focuses more sharply on those aspects of the plan that require improvement, drawing from the experience we have had in implementing our strategic plan during the course of the 2001/02 financial year. The major focus of the planning process has thus been placed on key outputs, targets, measures, time frames and activities, and on priorities, as set out in various policy documents.
In order to ensure that delivery on the various outputs is realised within the targets that have been set, the issue of capacity was subjected to close scrutiny during the planning process. We are of the view that the resolution of problems and constraints relating to capacity is – notwithstanding resource constraints - firmly within our reach and is one of the primary responsibilities of management of the Department, which the managers themselves must address.
The DLA’s planning system
With regard to its planning system, the Department has achieved the following:
This approach does not only comply fully with the requirements of the Public Service Act, 1984, as amended, and the Public Service Regulations, as well as with the Public Finance Management Act, 1 of 2000 (PFMA) and Treasury Regulations, it also provides a dynamic mechanism for the effective management of the performance of the Department as a whole.
Policy framework
In more or less similar fashion as last year, the planning process of the Department was informed by the following policy documents and statements:
The Cabinet Lekgotla held in January 2002 identified a number of areas of integration across departments. The following key areas are relevant to the Constitutional mandate of the Department:
Key strategic focus areas
The key strategic focus areas for our strategic planning process are guided by the above-mentioned policy framework as well as by new priorities that the Minister articulated in her opening address to the strategic planning workshop. The key strategic focus areas for the current planning cycle are inter alia the following:
Performance Management
The effective management of the performance of managers and staff, and by extension their respective functional components, is a sine qua non of planned policy implementation. During the previous financial year, the Department thus paid special attention to performance management. In this regard the Department went through an elaborate process of aligning to the strategic plan the performance agreements of senior managers and the work plans of all other staff that are designed in terms of the Personnel Performance Management System (PPMS).
Some success was achieved in the implementation of this multi-layered and synchronised performance management system. However, there is room for improvement in this regard, and, given that lessons have been drawn from the teething problems experienced during the previous year, the management of the performance of all individual members and functional units of the Department should improve from the 2002/03 financial year onwards. All managers are expected to play an effective role in this regard.
Delivery on the various programmes of the Department is beginning to reflect a positive trend. What now remains is to increase its scale and pace. I am confident that the Department has, through this plan set a firm foundation for the realisation of the goal of increased delivery.
DR GILINGWE P MAYENDE
DIRECTOR GENERAL
DATE:
The Department held a strategic planning session from 10 to 13 February 2002 at Aventura Conference Centre in Warmbaths. The facilitator team was Lucky Mathebula, Paul van der Merwe and Johan Swart of Group Dynamics (Pty) Ltd. The document reflects the results of the workshop.
2.1 Legislative, policy and planning framework
2.2 Planning guidelines
2002/03 2003/04 2004/05
R’000 R’000 R’000
Per Estimate of National Expenditure (ENE) 964 207 1 059 190 1 140 535
Allocated per this strategic plan 777 266 801 859 879 796
As a percentage of allocation per ENE 81% 76% 77%
2.3 Planning Assumptions
2.4 TRANSLATION KEY FOR ASSIGNMENT OF RESPONSIBILITY
CD:LRIMC - Chief Director : Land Reform Implementation Management and Co-ordination
CD:LRSSS - Chief Director : Land Reform Systems and Support Services
CLCC - Chief Land Claims Commissioner
CD:SPI - Chief Director : Spatial Planning and Information
CD: SM - Chief Director : Surveys and Mapping
CD:CS - Chief Director : Corporate Services
CD: FM - Chief Director : Financial Management
CRD - Chief Registrar of Deeds
CSG - Chief Surveyor -General
VISION : An equitable and sustainable land dispensation that promotes social and economic development |
|
Mission |
TO PROVIDE ACCESS TO LAND AND TO EXTEND RIGHTS IN LAND, WITH PARTICULAR EMPHASIS ON THE PREVIOUSLY DISADVANTAGED COMMUNITIES, WITHIN A WELL PLANNED ENVIRONMENT |
Strategic objectives |
|
Core business values |
|
Core clients |
|
STRATEGIC OBJECTIVE 1: Provision of Access to Land
TARGET PERSPECTIVE
Subprogramme : Land Reform Implementation Management and Co-ordination
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
Reaching Redistribution Targets |
LRAD implementation targets met |
No. of farms transferred |
308 |
299 |
327 |
352 |
CD:LRIMC |
No. of projects completed / approved |
275 |
270 |
304 |
325 |
|||
No. of hectares transferred |
112 873 |
98 765 |
114 550 |
129 240 |
|||
No. of beneficiaries benefited |
4 208 |
3 374 |
4 218 |
4 326 |
|||
No. of hectares transferred to marginalised groups (Youth, women, disabled) |
7 739 |
7 157 |
7 666 |
7 992 |
|||
Land acquired for settlement |
No. of farms transferred |
177 |
54 |
41 |
48 |
||
No. of projects completed / approved |
50 |
23 |
23 |
24 |
|||
No. of households benefited |
20 938 |
14 435 |
15 670 |
17 120 |
|||
No. of hectares transferred |
38 843 |
20 458 |
23 930 |
17 185 |
|||
No. of hectares transferred to marginalised groups (Youth, women, disabled farm workers) |
4 940 |
2 450 |
2 915 |
2 808 |
STRATEGIC OBJECTIVE 1: Provision of Access to Land (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Implementation Management and Co-ordination (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
Reaching Redistribution Targets ( continued) |
Other redistribution projects (Commonages, equities and other 126 projects) |
No. of farms transferred |
33 |
37 |
37 |
37 |
CD:LRIMC |
No. of projects completed / approved |
33 |
32 |
36 |
40 |
|||
No. of hectares transferred |
29 064 |
43 863 |
45 583 |
33 610 |
|||
No. of households benefited |
805 |
753 |
784 |
864 |
|||
No. of hectares transferred to marginalised groups (Youth, women, disabled farm workers) |
1 970
|
1 815
|
2 000
|
2 080
|
|||
Land delivered to Labour Tenants and farm workers |
No. of farms transferred |
125 |
96 |
134 |
142 |
||
No. of projects approved / completed |
201 |
155 |
191 |
183 |
|||
No. of hectares transferred |
30 810 |
29 378 |
31 795 |
30 735 |
|||
No. of households benefited |
1 264 |
1 123 |
1 263 |
1 225 |
|||
Land acquired in support of the Urban Renewal Programme |
No. of projects approved |
6 |
7 |
6 |
8 |
||
Size of land transferred-hectares |
2 638 |
1 040 |
1 010 |
1 592 |
|||
No. of households benefited |
9 200 |
8 354 |
8 250 |
7 950 |
STRATEGIC OBJECTIVE 1: Provision of Access to Land (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Implementation Management and Co-ordination (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
Decrease in state owned land |
State Agricultural land disposed of: Power of Attorney Land (528 742 ha) * Provisional |
No. of item 28(1) certificates issued |
1 421 |
- |
- |
- |
CD:LRIMC |
No. of projects approved / completed |
101 |
18 |
10 |
12 |
|||
No. of leases with option to purchase |
56 |
47 |
52 |
58 |
|||
No. of sale agreements concluded |
47 |
58 |
49 |
62 |
|||
No. of hectares under sale agreement |
46 000 |
38 500 |
27 000 |
33 750 |
|||
State Agricultural land disposed of: Agricultural land administered by DLA (382 148 ha) |
No. of projects approved completed |
224 |
234 |
266 |
305 |
||
No. of leases with option to purchase |
163 |
142 |
144 |
157 |
|||
No. of sales agreements completed |
126 |
150 |
168 |
203 |
|||
Size of land (hectares) transferred |
53 780 |
60 000 |
72 000 |
88 650 |
|||
Vesting of state land (non- DLA land) |
No. of Item 28(1) certificates issued |
3 105 |
3 444 |
3 600 |
3 813 |
* Pending the directive of the Minister with regard to the withdrawal/retention of the Powers of Attorney issued to Provincial MECs, which will determine the assignment of responsibility for the aforementioned function. In addition, validation of restitution claims affecting approximately 250 000 hectares of the aforementioned land is underway. Certainty on the number of hectares available for disposal will be determined once the validation process is concluded.
STRATEGIC OBJECTIVE 1: Provision of Access to Land (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Systems and Support Services
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
|
Provision of land use information |
Land use investigations |
No. of investigation reports |
16 |
18 |
20 |
22 |
CD: LRSSS
CD: LRSSS
|
|
Land use audits |
No. of audit reports |
12 |
14 |
16 |
20 |
|||
State land administration policy/procedures |
State land disposal: Valuation of agricultural state land and Long term Lease policy finalised |
Availability – date |
June 2002 |
|||||
Hunting policy |
Availability – date |
June 2002 |
||||||
Guidelines for administration of state land |
Availability – date |
April 2002 |
||||||
Vesting guidelines for R188 |
Availability – date |
July 2002 |
||||||
Mineral leases |
Availability – date |
June 2002 |
||||||
Communal land administration policy / legislation |
Legislation Communal Land Rights Bill |
Availability – date |
August 2002 |
|||||
Systems and procedures |
Availability-date |
Dec 2002 |
||||||
Improved system of administration and support to communal property associations |
Reviewed Communal Property Associations and other Legal entities Other legal entities |
Availability - date |
Sept 2002 |
Sept 2003 |
STRATEGIC OBJECTIVE 1: Provision of Access to Land (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Systems and Support Services (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
|
Effective project cycle |
Streamlined project cycle |
Reviewed by-date |
Dec. 2002 |
CD: LRSSS |
||||
Pro-active land acquisition strategy |
Departmental strategic decision on land acquisition |
Availability date |
March 2002 |
|||||
Private land acquisition strategy |
Availability date |
May 2002 |
||||||
Implementation Systems and procedures |
Availability date |
Dec 2002 |
||||||
Improved systems & procedures for LRAD |
Reviewed implementation systems and procedures |
Availability –short term |
May 2002 |
|||||
Availability –short term |
Dec 2002 |
|||||||
Availability –short term |
March 2003 |
|||||||
Number of progress reports |
4 |
|||||||
Land for settlement |
Revised land acquisition strategy for settlement |
Availability date |
June 2002 |
|||||
Implementation system for the acquisition of private, public and state land |
Availability date |
Dec 2002 |
STRATEGIC OBJECTIVE 1: Provision of Access to Land (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Systems and Support Services (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
||||
Land Redistribution: non-agricultural enterprises |
Product formulation process finalised |
Availability date |
January 2003 |
CD:LRSSS |
|||||||
Implementation systems and procedures finalised |
Availability date |
January 2003 |
|||||||||
Improved commonages disposal |
African Traditional Communities (ATC) Commonage strategy and implementation systems developed |
Availability date |
August 2002 |
||||||||
Improved Urban Renewal Programme |
Information and technical support to identify state and public land |
Turn around time (days) |
14 |
14 |
14 |
14 |
|||||
Proactive vesting of state land |
Inter Governmental state land vesting programme developed and supported by FOSAD and PSLDCs |
FOSAD support Obtained (service level agreement) |
June 2002 |
- |
- |
- |
|||||
Improved performance in the issuing of certificates for state titles |
Certificates of state titles for DLA land issued |
Response time for instructions to State Attorney (days) |
14 |
14 |
14 |
14 |
STRATEGIC OBJECTIVE 1: Provision of Access to Land (continued)
TARGET PERSPECTIVE (continued)
Programme: Restitution
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
|
Improved settlement of claims |
Claims validated |
No. of claims validated |
25 704 |
CLCC |
||||
Available date |
June 2002 |
|||||||
Claimants verified |
No. of claimants verified |
15 157 |
10 200 |
15 504 |
- |
|||
Urban claims settled |
No. of settled claims |
15 157 |
9 469 |
7 872 |
7 591 |
|||
Rural claims settled |
No. of hectares claimed |
100 000 |
150 000 |
160 000 |
170 000 |
|||
No. of households benefited |
580 000 |
363 000 |
301 200 |
290 500 |
||||
Post settlement support |
Sustainable projects linked to settled claims |
% of projects supported |
25% |
50% |
25% |
25% |
||
A Monitoring and Evaluation (M&E) system to monitor post settlement support |
Availability date |
Sept 2002 |
- |
- |
- |
|||
No. of system reviews |
1 |
1 |
1 |
1 |
||||
Effective Communication with claimants and other stakeholders |
Focused communication strategies
|
Availability date |
March 2002 |
March 2003 |
March 2004 |
March 2005 |
||
No. of Communication audit report |
1 |
1 |
1 |
1 |
||||
Restitution Policy implemented |
Existing Restitution policies reviewed |
Review date |
Sept 2002 |
|||||
Restitution Policy on State Land claims |
Draft available date |
June 2002 |
STRATEGIC OBJECTIVE 1: Provision of Access to Land (continued)
TARGET PERSPECTIVE (continued)
Programme: Spatial Planning and Information
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
|
Increase in sustainable land use |
Environmental Policy and guidelines for Land Reform |
85 % client satisfaction |
55% |
65% |
75% |
85% |
CD:SPI |
|
Implement pilot project KZN & Mpumalanga |
100% |
|||||||
Progress of roll out in other 7 provinces (%) |
10% |
50% |
75% |
100% |
||||
Better access to land administration services |
Vacant Land Analysis (VLA) |
Availability of municipal / district and provincial IDPs containing VLAs (%) |
30% |
50% |
85% |
100% |
||
Base Data (BD) to support spatial planning (SP) in municipalities / districts and nodal points |
Availability of BD for nodal points (%) |
100% |
||||||
Needs analysis report on requirements of municipalities in terms of BD for SP |
1 |
|||||||
Completed BD for the needy municipalities /districts (%) |
75% by Dec 2003 |
100% by March 2004 |
||||||
Decentralised provincial offices |
Number of line-function unit established in each province |
1 |
3 |
7 |
9 |
STRATEGIC OBJECTIVE 1: Provision of Access to Land (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Deeds Trading Account
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
||
Better access to land administration services |
Registration Facilitation Bill |
Finalisation – date |
Aug 2002 |
- |
- |
- |
CRD/ CD:CS |
||
Tabling – date |
Oct 2002 |
||||||||
Promulgation – date |
Jan 2003 |
||||||||
Amendment of Deeds Registries Act to make provision for alternate tenure forms |
Finalisation – date |
Aug 2002 |
|||||||
Tabling – date |
Oct 2002 |
||||||||
Promulgation – date |
Jan 2003 |
Programme: Surveys and Mapping
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
|||||||
Support to land reform programmes and restitution |
Service level agreement between Land Reform, Restitution and CD:S&M |
Agreement in place (date) |
30 June 2002 |
CD:SM/ (CD:LRSSS; CLCC) |
||||||||||
Advisory services |
Response time (in days) |
3 |
3 |
3 |
3 |
|||||||||
Client satisfaction (rating out of 5) |
3 |
4 |
4.5 |
4.5 |
||||||||||
Cadastral surveys (field surveys) |
Response time (in days) |
5 |
5 |
5 |
5 |
|||||||||
Client satisfaction (rating out of 5) |
3 |
4 |
4.5 |
4.5 |
||||||||||
Cartographic products (not national map series) |
Response time (in days) |
5 |
5 |
5 |
5 |
|||||||||
Client satisfaction (rating out of 5) |
3 |
4 |
4.5 |
4.5 |
STRATEGIC OBJECTIVE 1: Provision of Access to Land (continued)
TARGET PERSPECTIVE (continued)
Programme: Cadastral Surveys
DPT OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESp |
Better access to land administration systems |
Support to land and tenure reform branch |
Average response time in days |
1 |
1 |
1 |
1 |
CSG |
Less formal survey data iro PTO system captured |
% of PTOs captured |
10% |
40% |
70% |
100% |
END OF TARGET PERSPECTIVE: STRATEGIC OBJECTIVE 1
STRATEGIC OBJECTIVE 1: Provision of Access to Land (continued)
BUDGET PERSPECTIVE
Subprogramme: Land Reform Implementation Management and Co-ordination
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Reaching Redistribution Targets
|
Implementation of LRAD: (Non-loan component) (Loan component projects with Land Bank) |
118 000 |
102 000
|
108 000
|
114 000 |
18 477 |
18 000 |
20 000
|
16 000 |
||
Acquisition of Land for settlement |
60 000 |
40 000 |
50 000 |
48 000 |
|
Other Redistribution projects (Commonages, Equities and other 126 projects) |
26 000
|
22 000 |
22 000 |
23 000 |
|
Land delivered to marginalised groups (Labour Tenants and Farm workers) |
27 000 |
25 000 |
32 000 |
29 000 |
|
Acquisition of land in support of the Urban Renewal Programme |
8 000 |
9 000 |
11 000 |
14 000 |
STRATEGIC OBJECTIVE 1: Provision of Access to Land (continued)
BUDGET PERSPECTIVE (continued)
Programme: Restitution
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Claimants verified |
2 000 |
2 000 |
2 000 |
2 000 |
|
Claims settled* |
243 000 |
265 000 |
306 000 |
856 000 |
|
M&E system to monitor post settlement support |
1 000 |
1 000 |
1 000 |
1 000 |
|
Effective Communication with claimants and other stakeholders |
Focused communication strategies |
2 000 |
3 000 |
3 000 |
3 000 |
Restitution Policy on State Land claims |
5 000 |
6 000 |
6 000 |
6 000 |
|
Sufficient Resources Structure and Support Systems |
Commission capacitated (staffing, transport, equipment) |
41 000 |
43 000 |
47 000 |
104 000 |
Programme: Spatial Planning and Information
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
|
Increase in sustainable land use |
Environmental policy and guidelines |
16 000 |
16 000 |
16 000 |
10 000 |
|
Better access to land administration |
Vacant Land Analysis |
10 000 |
7 000 |
5 000 |
||
Base data (BD) to support spatial planning in municipalities / districts and nodal points |
1 000 |
500 |
500 |
500 |
*
The budget of the Restitution programme would have to be augmented to enable the Commission to finalise outstanding claims within three years as directed by the President in his State of the Nation Adress.STRATEGIC OBJECTIVE 1: Provision of Access to Land (continued)
BUDGET PERSPECTIVE (continued)
Programme: Surveys and Mapping
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Support to land reform programmes and restitution |
Service level agreement between land reform, restitution and CD:S&M |
10 |
- |
- |
- |
Advisory services |
80 |
85 |
90 |
100 |
|
Cadastral surveys (field surveys) |
800 |
900 |
950 |
1 000 |
|
Cartographic products (not national map series) |
200 |
230 |
250 |
270 |
Programme: Cadastral Surveys
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Better access to land administration systems |
Support to land and tenure reform branch |
640 |
724 |
816 |
918 |
Less formal survey data iro PTO system captured |
200 |
200 |
200 |
200 |
END OF BUDGET PERSPECTIVE: STRATEGIC OBJECTIVE 1
STRATEGIC OBJECTIVE 2: Provision of rights in Land
TARGET PERSPECTIVE
Subprogramme: Land Reform Implementation Management and Co-ordination
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
||
Increased Security of Tenure |
Confirmation of Security of Tenure |
Number of ESTA and LTA cases and / or eviction cases or threats completed |
2 220 |
1 304
|
1 203
|
1 129
|
CD:LRIMC |
||
Conversion of de facto ownership into de jure ownership |
Number of projects approved |
39
|
49 |
61 |
66 |
||||
Number of title deeds issued to individuals / households |
6 065 |
5 870 |
7 085
|
5 450
|
|||||
No of sites approved |
5 201 |
5 011 |
5 000 |
5 000 |
|||||
Contribution to implementation of ISRDP through tenure reform |
Anchor Projects: (Number of projects) approved / completed |
19
|
17
|
17
|
17
|
||||
Non Anchor Projects (No of projects) completed |
13 |
14
|
22 |
28
|
STRATEGIC OBJECTIVE 2: Provision of rights in Land (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Systems and Support Services
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsI-Bility |
||||
ESTA and LTA consolidated |
A new Consolidated Act |
Availability date |
December 2002 |
LRSSS |
|||||||
Revised strategy for processing LTA applications |
Revised systems and procedures for LTA applications |
Availability date |
June 2002 |
||||||||
More effective legal assistance for farm workers / labour tenants |
Strategy / mechanisms on effective legal assistance for farm workers / labour tenants |
Availability date |
June 2002 |
||||||||
Refined title adjustment legislation |
Act 111 of 1993 and Act 119 of 1993 amended |
Availability date |
Sept 2002 |
||||||||
Operationalisation of NLTC recommendations |
Strategy on the operationalisation of NLTC recommendations |
Availability date |
March 2002 |
STRATEGIC OBJECTIVE 2: Provision of rights in Land (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Deeds Trading Account
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi- bility |
||
Increase security of tenure |
Registered title deeds with regard to new property owners (Existing manual system) |
Customer satisfaction (%) |
95 |
96 |
97 |
98 |
CRD |
||
Turnaround time (days) |
10 |
10 |
10 |
10 |
|||||
Deeds Registration System reviewed and amended |
User Satisfaction Rating (%) |
60 |
70 |
80 |
80 |
||||
Availability date |
Dec 2003 |
Programme: Cadastral Surveys
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi- bility |
||
Increase security of tenure |
A secure systems of cadastral surveys and efficient information system |
Turnaround time |
15 |
15 |
15 |
15 |
CSG |
END OF TARGET PERSPECTIVE: STRATEGIC OBJECTIVE 2
STRATEGIC OBJECTIVE 2: Provision of rights in Land (continued)
BUDGET PERSPECTIVE
Subprogramme: Land Reform Implementation Management and Co-ordination
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Increased Security of Tenure |
Confirmation of Security of Tenure |
2 220 |
1 304 |
1 203 |
1 129 |
Conversion of de facto ownership into de jure ownership |
39 |
49 |
61 |
66 |
|
6 065 |
5 870 |
7 085 |
5 450 |
||
5 201 |
5 011 |
5 000 |
5 000 |
||
Contribution to implementation of ISRDP through tenure reform |
19 |
17 |
17 |
17 |
|
13 |
14 |
22 |
28 |
Subprogramme: Land Reform Systems and Support Services
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Provision of land use information |
Land use investigations |
750 |
830 |
920 |
1 000 |
Land use audits |
|||||
State land administration policy/procedures |
State land disposal: Valuation of agricultural state land and Long term Lease policy finalized |
100 |
110 |
120 |
130 |
Hunting policy |
|||||
Guidelines for administration of state land |
|||||
Vesting guidelines for R188 |
|||||
Mineral leases |
|||||
Communal land administration policy / legislation |
Legislation and systems and procedures |
360 |
436 |
312 |
280 |
STRATEGIC OBJECTIVE 2: Provision of rights in Land (continued)
BUDGET PERSPECTIVE (continued)
Subprogramme: Land Reform Systems and Support Services (continued)
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Reviewed Communal Property Associations and other Legal entities |
Improved system of administration and support to communal property associations |
450 |
1 500 |
450 |
450 |
Reviewed Project Cycle |
Project cycle as recommended confirmed after trial period |
10 |
11 |
12 |
13 |
Pro-active land acquisition strategy |
Departmental strategic decision |
96 |
- |
- |
- |
Private land acquisition strategy |
|||||
Implementation Systems and procedures |
|||||
Implementation and review of problem areas in the implementation of LRAD |
Reviewed implementation systems and procedures |
552 |
- |
- |
- |
Revised Acquisition of land for settlement strategy |
Revised land acquisition strategy for settlement |
150 |
- |
- |
- |
Implementation system for private, public and state land |
|||||
Land Redistribution: Non-agricultural enterprises strategies |
Non-agricultural enterprises strategies |
20 |
- |
- |
- |
Improved Commonages strategy |
African Traditional Communities Commonage strategy and implementation systems |
10 |
- |
- |
- |
Improved Urban Renewal Programme |
Information and technical support to identify state and public land |
40 |
44 |
49 |
53 |
Proactive vesting of state land |
Inter Governmental state land vesting programme developed and supported by FOSAD and PSLDC’s |
50 |
55 |
60 |
66 |
STRATEGIC OBJECTIVE 2: Provision of rights in Land (continued)
BUDGET PERSPECTIVE (continued)
Subprogramme: Land Reform Systems and Support Services (continued)
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Improved performance in the issuing of certificates for state titles |
Certificates of state tittles for DLA land issued |
40 |
44 |
48 |
53 |
ESTA and LTA consolidated |
A new Consolidated Act |
173 |
2 000 |
500 |
100 |
LCC case reviewed |
Report on case law: regarding ESTA / LTA |
15 |
- |
- |
- |
Revised strategy for processing LTA applications |
Revised systems and procedures for LTA applications |
200 |
50 |
50 |
300 |
Refinement of title adjustment legislation |
Act 111 of 1993 and Act 119 of 1993 amended |
22 |
- |
- |
- |
Operationalisation of the NLTC recommendation |
Strategy on the operationalisation of NLTC recommendations |
- |
300 |
- |
- |
Subprogramme: Deeds Trading Account
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Increase security of tenure |
Registered title deeds with regard to new property owners. (Existing manual system) |
200 |
201 |
211 |
221 |
STRATEGIC OBJECTIVE 2: Provision of rights in Land (continued)
BUDGET PERSPECTIVE (continued)
Programme: Cadastral Surveys
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Increase security of tenure |
Maintain secure system of cadastral surveys and efficient information system |
43 840 |
54 755 |
58 046 |
61 518 |
END OF BUDGET PERSPECTIVE: STRATEGIC OBJECTIVE 2
STRATEGIC OBJECTIVE 3: Improvement and alignment of systems and processes
TARGET PERSPECTIVE
Subprogramme: Land Reform Implementation Management and Co-ordination
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
||||
Establishment of a decentralised delivery system |
Creation of DLD offices in all provinces |
Number of new DLD offices |
1 (KZN) |
4 (EC,FS,GP,LIM) |
4 (MP,NC, NW,WC) |
0 |
|||||
Effective M&E Systems |
Programme performance report |
No of programme evaluation reports |
4 |
4 |
4 |
4 |
|||||
Impact assessment reports:
|
No of reports |
1 |
|
|
|
||||||
|
1 |
1 |
|||||||||
|
1 |
1 |
1 |
1 |
|||||||
Statistical reports Trends report Forecasts |
No of reports |
Quarterly |
Quarterly |
Quarterly |
Quarterly |
||||||
Diagnostic evaluation reports |
No of studies |
3 |
4 |
4 |
4 |
STRATEGIC OBJECTIVE 3: Improvement and alignment of systems and processes (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Management, Management and Coordination (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
||
Effective M&E Systems (continued) |
Manual on promotion of access to information |
No of manuals |
1 |
1 |
1 |
1 |
CD:LRIMC |
||
No of translations |
3 |
4 |
5 |
6 |
|||||
No of reports |
1 |
1 |
1 |
1 |
|||||
SAHRC Socio-Economic Protocol Report |
No of reports |
1 |
1 |
1 |
1 |
||||
National Action Plan And Protection Of Human Rights |
Timeous annual submissions |
Oct 2002 |
Oct 2003 |
Oct 2004 |
Oct 2005 |
Subprogramme: Land Reform Systems and Support Services
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
||||
Effective dispute resolution for tenure legislation |
Alternative Dispute Resolution (ADR) Systems |
Availability date |
December 2002 |
CD:LRSSS |
|||||||
Better monitoring of evictions
|
Electronic Evictions Monitoring System |
System piloted (KZN) |
June 2002 |
||||||||
System operational: date |
August 2002 |
STRATEGIC OBJECTIVE 3: Improvement and alignment of systems and processes (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Systems and Support Services (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
||||||||||
Improved land information systems |
Asset register |
Availability date |
March 2003 |
CD:LRSSS |
|||||||||||||
Pilot Lease register |
Availability date |
June 2002 |
|||||||||||||||
Vesting system maintained |
Availability (%) |
98% |
98% |
98% |
98% |
||||||||||||
Public land database maintained |
Availability (%) |
98% |
98% |
98% |
98% |
||||||||||||
PSLDC application system maintained |
Availability (%) |
98% |
98% |
98% |
98% |
||||||||||||
Ex – SADT system data converted and incorporated in Public land database |
Availability date |
March 2003 |
March 2004 |
March 2005 |
|||||||||||||
Effective support and Training to implementers of Land Reform |
Training programmes |
Training needs analysis report |
1 |
1 |
1 |
1 |
CD: LRSSS/ CD:CS |
||||||||||
No of training programmes developed |
3 |
6 |
6 |
8 |
|||||||||||||
No of training courses conducted |
8 |
12 |
16 |
18 |
STRATEGIC OBJECTIVE 3: Improvement and alignment of systems and processes (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Systems and Support Services (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||||||
More effective communication about Land Reform Products |
Communication strategies |
No of strategy documents available at year end |
2 |
2 |
2 |
2 |
CD: LRSSS/ CD:CS |
|||||||
Media products for Land Reform |
User satisfaction rating (1 to 5) |
3 |
3.5 |
3.5 |
4 |
Subprogramme: Deeds Trading Account
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||||||
More effective management information system |
Electronic Deeds Registration System (e-DRS) |
Date of Service level agreement with SITA |
July 02 |
CRD |
||||||||||
System availability |
July 04 |
|||||||||||||
Turnaround time (days) |
8 |
6 |
4 |
|||||||||||
Service delivery improvement (%) |
10% |
30% |
||||||||||||
Decentralized delivery system |
Avg. days to est. info. Points |
10 |
10 |
10 |
10 |
|||||||||
Availability – date |
May |
|||||||||||||
Deeds Registry per province |
Report to DG |
March 02 |
||||||||||||
Offices established (date) |
July 03 |
July 04 |
July 05 |
STRATEGIC OBJECTIVE 3: Improvement and alignment of systems and processes (continued)
TARGET PERSPECTIVE (continued)
Programme: Surveys and Mapping
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
Effective information systems |
Integrated data base for topographic framework information |
% of database available at year end |
40
|
75 |
100 |
CD:S&M |
Programme: Cadastral Surveys
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||||||
Establishment of a decen-tralised delivery system |
Creation of SG offices in all provinces |
Number of new SG offices |
1 (Nelspruit) |
1 |
1 |
1 |
STRATEGIC OBJECTIVE 3: Improvement and alignment of systems and processes (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Corporate Services
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||||||
More effective management information systems |
Integrated land information through corporate data warehouse |
% of departmental databases connected |
100% |
CD:CS |
||||||||||
Availability date |
30 Nov |
|||||||||||||
% of external land-related databases connected - Agriculture and Land Bank |
100% |
|||||||||||||
Availability date |
30 June |
|||||||||||||
% of external land-related databases connected –other strategic systems; |
100% |
|||||||||||||
Availability date |
30 June |
|||||||||||||
% of land-related services delivered through Government service portal |
100% |
|||||||||||||
Availability date |
31 March |
STRATEGIC OBJECTIVE 3: Improvement and alignment of systems and processes (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Corporate Services (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||||||
More effective management information systems (continued) |
Electronic workflow and document management system |
% of pilot and top management work-flow processes implemented electronically |
100% |
CD:CS |
||||||||||
Availability date |
30 Nov |
|||||||||||||
% of SSC and DLD processes implemented electronically |
75% |
|||||||||||||
Availability date |
30 Nov |
|||||||||||||
% Departmental work-processes implemented electronically |
75% |
|||||||||||||
Availability date |
30 Nov |
|||||||||||||
% of all work-processes implemented electronically |
100% |
|||||||||||||
Availability date |
31 Mar |
|||||||||||||
Corporate management information |
% of performance monitoring indicators derived from existing databases automated and on-line |
100% |
|
- |
- |
|||||||||
% of all performance monitoring indicators automated and on-line |
100% |
|||||||||||||
End-user support |
% of end-user incidents resolved within 24 hours |
80% |
80% |
80% |
80% |
|||||||||
Network infrastructure support |
Maximum down time per service per month in hours |
8 |
8 |
8 |
8 |
STRATEGIC OBJECTIVE 3: Improvement and alignment of systems and processes (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Corporate Services (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||||||
More effective management information systems (continued) |
Web-enabled services e-DRS |
Date of Service Level Agreement with SITA |
31 Jul |
CD:CS |
||||||||||
Availability date of e-DRS design and architecture |
30 Nov |
|||||||||||||
Date of e-DRS system availability for testing |
30 Nov |
|||||||||||||
Date of user-acceptance testing |
31 Mar |
|||||||||||||
System availability |
31 July |
|||||||||||||
On-line, automated Human Resource Management system |
Availability date of skills audit database |
30 June |
- |
- |
- |
|||||||||
Availability date of HRM tools |
30 Nov |
|||||||||||||
More effective communication (internal and external)
|
More informed staff |
% of staff aware of internal |
50% |
60% |
70% |
80% |
||||||||
An external communication strategy (including development communication) |
Availability date for submission |
31 Nov |
||||||||||||
Implemented communication plan |
Implementation date |
31 May |
||||||||||||
Audit date |
31 May |
|||||||||||||
Departmental structure and establishment reviewed and aligned |
Organisation and establishment reports |
Availability date of report |
1 Apr |
|||||||||||
Annual review |
1 Apr |
1 Apr |
1 Apr |
STRATEGIC OBJECTIVE 3: Improvement and alignment of systems and processes (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Financial Management
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
||
More effective management information systems |
Corporate management information system (FBASE) Expenditure |
Date on-line & accessible |
June |
CD:CS |
|||||
% usage |
20% |
50% |
100% |
100% |
|||||
User rating on 5-point scale |
3/5 |
4/5 |
4/5 |
||||||
Corporate management information system (FBASE) General Ledgers |
Date on-line & accessible |
April |
|||||||
% usage |
20% |
50% |
100% |
||||||
User rating on 5-point scale |
3/5 |
4/5 |
4/5 |
||||||
BAS |
Date on-line & accessible |
April |
|||||||
% usage |
100% |
100% |
100% |
||||||
Establishment of decentralised delivery systems |
Decentralised support services
|
Compliance with Mutingati |
100% |
100% |
100% |
100% |
|||
Evaluation rating on 5-point scale |
3/5 |
4/5 |
4/5 |
4/5 |
END OF TARGET PERSPECTIVE: STRATEGIC OBJECTIVE 3
STRATEGIC OBJECTIVE 3: Improvement and alignment of systems and processes (continued)
BUDGET PERSPECTIVE
Subprogramme: Land Reform Implementation Management and Co-ordination
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Socio-economic impact assessment |
800 |
1 000 |
|||
Environmental impact assessment |
400 |
500 |
|||
Programs reviews (LRAD) |
300 |
||||
Annual forecasts |
100 |
50 |
50 |
- |
|
M&E information management system |
500 |
- |
- |
- |
|
Data cleaning and electronic document management system (project information) |
(Donor funds) |
||||
Diagnostic evaluation studies |
Des report |
150 |
250 |
300 |
300 |
Information planning and co-ordination |
Manual on promotion of access to information |
200 |
300 |
370 |
200 |
STRATEGIC OBJECTIVE 3: Improvement and alignment of systems and processes (continued)
BUDGET PERSPECTIVE (continued)
Subprogramme: Land Reform Systems and Support Services
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Effective dispute resolution for tenure legislation |
Alternative Dispute Resolution (ADR) Systems |
640 |
200 |
200 |
110 |
Better monitoring of evictions |
Electronic Evictions Monitoring System |
685 |
300 |
350 |
100 |
Improved land information systems |
Asset register |
600 |
350 |
350 |
350 |
Availability date |
|||||
Availability of Vesting system maintained |
|||||
Availability of Public land database maintained |
|||||
Availability of PSLDC application system maintained |
|||||
Availability of Ex – SADT system data converted and incorporated in Public and database |
Subprogramme: Deeds Trading Account
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
More effective management information system |
Electronic Deeds Registration System (e-DRS) |
30 000 |
25 000 |
25 000 |
25 000 |
Decentralized delivery system |
7 000 |
9 000 |
9 000 |
9 000 |
STRATEGIC OBJECTIVE 3: Improvement and alignment of systems and processes (continued)
BUDGET PERSPECTIVE (continued)
Programme: Surveys and Mapping
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Effective information systems |
Integrated data base for topographic framework information |
500 |
1 500 |
1 000 |
Subprogramme: Corporate Services
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
More effective management information systems |
Integrated land information through corporate data warehouse |
4 500 |
1 500 |
1 550 |
2 600 |
Electronic workflow and document management system |
3 000 |
2 000 |
2 500 |
1 000 |
|
Corporate management information |
1 900 |
500 |
- |
- |
|
End-user support |
700 |
750 |
800 |
850 |
|
Network infrastructure support |
11 000 |
12 000 |
12 500 |
13 000 |
|
On-line, automated Human Resource Management system |
900 |
- |
- |
- |
|
More effective communication (internal and external) |
More informed staff |
8 430 |
10 291 |
10 908 |
11 671 |
An external communication strategy (including development communication) |
|||||
Implemented communication plan |
|||||
Provision of office accommodation |
Refurbishment programme for National office |
14 000 |
15 400 |
16 900 |
- |
Establishment of a decentralised delivery system |
Established SSC and DLD offices in all the provinces |
1 000 |
1 100 |
1 200 |
1 300 |
End of budget perspective : Strategic Objective 3
STRATEGIC OBJECTIVE 4: Improvement of Stakeholder Relations
TARGET PERSPECTIVE
Subprogramme: Land Reform Implementation Management and Co-ordination
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||
Integrated Land Information Systems |
LAND BASE System Configurations / Fields agreed to |
Availability date |
April 2002 |
CD:LRIMC |
||||||
All project and budget information |
Availability date |
Sept 2002 |
||||||||
Cash flow planning and management improvement |
% improvement rating |
5% |
5% |
5% |
5% |
|||||
Financial Analysis Management Improved |
% improvement rating |
5% |
5% |
5% |
5% |
|||||
Decentralised Delivery System |
Principles and Standards from Pilot outlined |
Credibility rating ( 1 to 5) |
3.5 |
3.5 |
3.5 |
3.5 |
||||
Deliberations PLROs / Top Management considered |
Satisfaction rating |
70% |
75% |
890% |
85% |
|||||
Pilot Structure / Systems Match and Gap Analysis per PLRO |
Process Credibility and Report authenticity date (%) |
90 |
90 |
90 |
90 |
|||||
Principle and / standard review per PLRO |
Process Credibility & Report Authenticity (%) |
90 |
90 |
90 |
90 |
STRATEGIC OBJECTIVE 4: Improvement of Stakeholder Relations (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Implementation Management and Co-ordination (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
||||
Improved Stakeholder Relations |
Signed working agreement between DLA & respective Local Authorities; between DLA & relevant Provincial Departments |
Date available |
March 2002 |
March 2003 |
March 2004 |
March 2005 |
|||||
Stakeholder data / Information collection and collation |
Date available |
Sept 2002 |
March 2003 |
March 2004 |
March 2005 |
||||||
Performance Review and Accreditation update |
Date available |
Sept 2002 |
March 2003 |
March 2004 |
March 2005 |
||||||
Systems updated / standardised |
Date available |
Sept 2002 |
March 2003 |
March 2004 |
March 2005 |
STRATEGIC OBJECTIVE 4: Improvement of Stakeholder Relations (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Implementation, Management and Co-ordination (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|
Improved Stakeholder Relations |
Generic Guidelines implemented and concretised |
Guidelines implementation-date |
July 2002 |
- |
- |
- |
CD: LRIMC |
|
Inter-departmental forums |
Inter-departmental stakeholder satisfaction rating (%) |
50% |
60% |
70% |
80% |
|||
Inter-Local Authority stakeholder satisfaction (%) |
50% |
60% |
70% |
80% |
||||
Information and Capacity Building Strategy agreed facilitated |
Guidelines implemented date |
November 2002 |
||||||
Consultation Forums established |
Date available |
November 2002 |
||||||
Signed working agreement between DLA & Respective Local Authorities |
Date available |
November 2002 |
||||||
Between DLA & Relevant Provincial Departments |
Date available |
November 2002 |
||||||
Generic guidelines implemented |
Date available |
November 2002 |
STRATEGIC OBJECTIVE 4: Improvement of Stakeholder Relations (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Systems and Support Services
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
||
Improved stakeholder involvement |
Generic guidelines for co-ordination of Land Reform initiatives at National Level developed with governmental and non governmental organisation Interaction with identified stakeholders |
Availability date
|
June 2002
|
|
|
|
CD: LRSSS |
||
Satisfaction rating |
3,5 |
3,5 |
3,5 |
3,5 |
|||||
Support for Minister’s Cabinet and parliamentary duties |
Inputs into parliamentary processes |
100% of parliamentary inquiries
|
100% |
100% |
100% |
100% |
|||
Number of meetings per year |
12 |
12 |
12 |
12 |
|||||
Execution of co-operative projects |
Service Level Agreements |
Agreed memoranda of SLAs |
15 |
17 |
17 |
17 |
|||
Provision of co-operative assistance for capacity building |
Guidelines for capacity building provision and training on Land Reform
|
Availability date
|
June 2002 |
||||||
Number of training programmes |
5 |
6 |
10 |
8 |
STRATEGIC OBJECTIVE 4: Improvement of Stakeholder Relations (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Land Reform Systems and Support Services (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
||||
Provision of support and advice to implementers of Land Reform (PLROs) |
Support and advice on requests and sometimes proactively Identification of training programmes |
Turn around time |
48 hours desktop 5 working days for a visit |
48 hours desktop 5 working days for a visit |
48 hours desktop 5 working days for a visit |
48 hours desktop 5 working days for a visit |
CD: LRSSS |
||||
No of training programmes developed |
3 |
6 |
6 |
8 |
|||||||
No of training courses conducted |
8 |
12 |
16 |
18 |
|||||||
More effective communications about Land Reform Products |
Communication strategies |
No of strategy documents available at year end |
2 |
2 |
2 |
2 |
|||||
Media products for Land Reform |
User satisfaction rating ( 1 to 5) |
3 |
3.5 |
3.5 |
4 |
STRATEGIC OBJECTIVE 4: Improvement of Stakeholder Relations (continued)
TARGET PERSPECTIVE (continued)
Programme: Spatial Planning and Information
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||||||
More knowledge of planning systems in provincial and local government authorities |
Provincial Planning Systems Audit Report |
Number of reports by August each year |
1 |
1 |
1 |
1 |
CD: SPI |
|||||||
Improved and clarified interaction with the Department of Provincial and Local Government (DPLG) |
Signed working agreement between DLA &DPLG |
Date available |
March 2002 |
|||||||||||
Cordial working relations with all provincial departments responsible for development planning |
Inter-departmental forums |
Inter-departmental stakeholder satisfaction rating (%) |
40% |
60% |
80% |
85% |
STRATEGIC OBJECTIVE 4: Improvement of Stakeholder Relations (continued)
TARGET PERSPECTIVE (continued)
Programme: Surveys and Mapping
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|
Stakeholder partnerships |
Service level agreement with other departments and institutions with respect to surveying and mapping services and products |
Satisfied clients (rating: 1 to 5) |
4 |
4.5 |
4.5 |
4.5 |
CD:SM |
|
Partnerships with higher education institutions |
Number of students in surveying / geomatics supported |
38 |
70 |
70 |
70 |
|||
Partnerships with professional bodies |
Contribution to profession (rating: 1 to 5) |
4.5 |
4.5 |
4.5 |
4.5 |
|||
Active participation in relevant international structures and projects that are beneficial to South Africa and Africa |
Agreement on surveying and mapping, including spatial information, support for NEPAD |
Completion of agreement at year end (as %) |
30 |
100 |
||||
Development projects |
Client satisfaction per project (rating: 1 to 5) |
4 |
4.5 |
4.6 |
4.6 |
|||
Contribution to international region committees and bodies |
Recognised contribution (rating: 1 to 5) |
4 |
4 |
4.2 |
4.2 |
STRATEGIC OBJECTIVE 4: Improvement of Stakeholder Relations (continued)
TARGET PERSPECTIVE (continued)
Programme: Cadastral Surveys
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||||||
Improved relations between the Chief Directorate and stakeholders |
Stakeholder partnerships |
Stake-holder value rating |
3 / 5 |
4 / 5 |
4 / 5 |
4 / 5 |
CSG |
|||||||
Stakeholder partnerships |
Partnerships with tertiary institutions (in con-junction with CDS & M) |
Number of students in training |
19 |
20 |
20 |
20 |
||||||||
International project participation |
Number of projects |
2 |
3 |
4 |
5 |
END OF TARGET PERSPECTIVE: STRATEGIC OBJECTIVE 4
STRATEGIC OBJECTIVE 4: Improvement of Stakeholder Relations (continued)
BUDGET PERSPECTIVE
Programme: Surveys and Mapping
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Stakeholder partnerships |
Service level agreement with other departments and institutions with respect to surveying and mapping services and products |
1 800 |
2 400 |
1 800 |
3 500 |
Partnerships with higher education institutions |
1 700 |
2 500 |
2 680 |
2 840 |
|
Partnerships with professional bodies |
85 |
90 |
95 |
100 |
|
Active participation in relevant international structures and projects that are beneficial to South Africa and Africa |
Agreement on surveying and mapping, including spatial information, support for NEPAD |
150 |
450 |
||
Development projects |
400 |
300 |
350 |
400 |
|
Contribution to international / Regional Committees / bodies |
170 |
200 |
100 |
120 |
Programme: Cadastral Surveys
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
|
Stakeholder partnerships |
Improve relations between the Chief Directorate and stakeholders |
300 |
330 |
363 |
399 |
|
Stakeholder partnerships |
Partnerships with tertiary institutions (in con-junction with CDS & M) |
400 |
440 |
484 |
532 |
|
Stakeholder partnerships |
Participation in international structures and projects |
150 |
165 |
181 |
200 |
END OF BUDGET PERSPECTIVE: STRATEGIC OBJECTIVE 4
STRATEGIC OBJECTIVE 5: Promotion of Intra-Departmental Excellence
TARGET PERSPECTIVE
Subprogramme: Land Reform Systems and Support Services
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||||||
Merger of PLI and SLM; TR & LR |
Merger a directorates CD structure finalised |
Completion date |
1 April 2002 |
Programme: Surveys and Mapping
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||||||
Effective departmental structures |
Approved roles and responsibilities with respect to cartographic services in DLA |
% of total maps produced by DLA produced by CD:S&M |
70 |
90 |
95 |
95 |
CD:SM |
Programme: Cadastral Surveys
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||
Support to Restitution programme |
Cadastral advisory services and research |
Average response time on request (days) |
1 |
1 |
1 |
1 |
CSG |
|||
Better access to land administration services |
Land Survey Act in line with the new Land Registration System |
Conformity with New Land Registration System (%) |
50% |
100% |
100% |
100% |
||||
Effective departmental structures |
Roles clarified in terms of Cadastral surveys |
Increased use of services (%) |
30% |
50% |
80% |
100% |
STRATEGIC OBJECTIVE 5: Promotion of Intra-Departmental Excellence (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Corporate Services
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||||
Effective Human Resource Development Programme |
Human Resource Development Strategy |
Availability date |
30 Aug |
CD:CS |
||||||||
Staff satisfaction rating |
2.5/5 |
3/5 |
3.5/5 |
3.5/5 |
||||||||
Number of staff trained |
2,800 |
3,000 |
3,100 |
3,200 |
||||||||
Availability date of bursary committee report |
30 Nov |
30 Nov |
30 Nov |
30 Nov |
||||||||
Workplace Skills Plan (including competency profiles) |
Availability date of plan |
28 Feb |
29 Feb |
28 Feb |
28 Feb |
|||||||
Training directory |
Availability date of directory |
31 Aug |
31 Aug |
31 Aug |
31 Aug |
|||||||
Annual training program for year ahead |
Availability date |
30 Nov |
30 Nov |
30 Nov |
30 Nov |
|||||||
Annual training report to PSETA |
Availability date of report |
1 Apr |
1 Apr |
1 Apr |
1 Apr |
|||||||
Mainstream HIV / AIDS programmes |
HIV / AIDS Prevention Strategy (awareness and education) |
Awareness rating of employees sensitised to HIV / AIDS |
3 |
3.5 |
4 |
4 |
||||||
Number of calendar events |
4 |
6 |
8 |
8 |
||||||||
Effective Performance Management |
Improved performance management and reporting systems. |
Annual updated system-Availability date |
30 Apr |
30 Apr |
30 Apr |
30 Apr |
STRATEGIC OBJECTIVE 5: Promotion of Intra-Departmental Excellence (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Corporate Services (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||
Effective Performance Management (continued) |
Reviewed PPMS (including non-monetary rewards) |
Annual updated Availability date |
31 Oct |
31 Oct |
31 Oct |
31 Oct |
CD:CS |
|||
Senior Management PPMS |
Availability date |
30 Apr |
||||||||
Consistent PPMS implementation plan |
% reduction of assessment results rejected |
50% |
60% |
70% |
80% |
CD: CS All managers |
||||
Availability date |
||||||||||
Greater staff buy-in and understanding of assessments |
Maximum percentage of assessed employees with grievances % Reduction of assessment results rejected |
1% |
1% |
1% |
1% |
|||||
Service Delivery Improvement Plan |
Availability date of updated service standard and commitment charter |
30 Apr |
||||||||
Availability date of reviewed document |
1 Apr |
1 Apr |
1 Apr |
|||||||
More effective departmental transformation |
Equitable work environment as required in terms of the Employment Equity Act and code of good practice |
Employment Equity plan availability date |
1 Apr |
1 Apr |
1 Apr |
1 Apr |
||||
Date of report for Department of Labour |
1 Oct |
1 Oct |
1 Oct |
1 Oct |
||||||
Transformation structures |
Provincial and national structures -Availability date |
30 Jun |
||||||||
% of identified barriers to employment equity addressed
|
30% |
40% |
50% |
60% |
STRATEGIC OBJECTIVE 5: Promotion of Intra-Departmental Excellence (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Corporate Services (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||
More effective departmental transformation |
Employment Equity
|
% of targets in EE plan |
80 |
90 |
100 |
100 |
CD:CS |
|||
Action plan for Disability awareness strategy |
Number of information sessions per province |
2 |
2 |
2 |
2 |
|||||
Number of disability forum meetings |
3 |
4 |
4 |
4 |
||||||
Improved organisational culture |
Availability date of terms of reference for service provider |
31 May |
- |
|||||||
Availability date of capacity building programme |
31 Oct |
|||||||||
% of senior managers trained |
100% |
|||||||||
% of middle managers trained |
100% |
|||||||||
% of junior staff trained |
100% |
|||||||||
Gender awareness strategy |
Number of projects in provinces |
3 |
6 |
7 |
9 |
|||||
Availability date |
June 2002 |
|||||||||
Management and co-ordination of legislation |
Managed legislation programme |
Monthly progress reports available. |
12 |
12 |
12 |
12 |
||||
Maximum days turn-around time to notify role players of programme changes |
5 |
5 |
5 |
5 |
STRATEGIC OBJECTIVE 5: Promotion of Intra-Departmental Excellence (continued)
TARGET PERSPECTIVE (continued)
Subprogramme: Financial Management
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPonsi-bility |
|||||||
Effective financial management |
Effective budget & cash flow management |
% compliance with PFMA, Treasury Regulations and Budget guidelines |
100% |
100%
|
100%
|
100%
|
CD:FM All Managers |
|||||||
Treasury deadlines met |
100% |
100% |
100% |
100% |
||||||||||
% spending |
90% |
100% |
100% |
100% |
||||||||||
Departmental reports |
12 |
12 |
12 |
12 |
||||||||||
Established Asset Management function |
Date Policy Documents availability |
Dec |
CD:FM |
|||||||||||
Date Asset Register availability |
March |
|||||||||||||
Records Accuracy |
100% |
100% |
100% |
|||||||||||
Procurement |
Service Provider D/base- Date |
September |
CD:FM All Managers |
|||||||||||
Client rating |
3/5 |
4/5 |
4/5 |
4/5 |
||||||||||
% compliance |
100% |
100% |
100% |
100% |
||||||||||
Effective risk management |
Unqualified report |
March 03 |
||||||||||||
% achievement of strategic objectives |
90% |
90% |
90% |
90% |
||||||||||
% compliance with PFMA and Treasury Regulations |
100% |
100% |
100% |
100% |
END OF TARGET PERSPECTIVE: STRATEGIC OBJECTIVE 5
STRATEGIC OBJECTIVE 5: Promotion of Intra-Departmental Excellence (continued)
BUDGET PERSPECTIVE
Programme: Surveys and Mapping
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Effective departmental structures |
Approved roles and responsibilities with respect to cartographic services in DLA |
10 |
11 |
12 |
13 |
Programme: Cadastral Surveys
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Support to Restitution programme |
Support to restitution programme |
840 |
924 |
1 016 |
1 118 |
Better access to land administration services |
Land Survey Act in line with the new Land Registration System |
200 |
220 |
242 |
266 |
Effective departmental structures |
Roles clarified in terms of Cadastral surveys |
780 |
858 |
944 |
1 038 |
STRATEGIC OBJECTIVE 5: Promotion of Intra-Departmental Excellence (continued)
BUDGET PERSPECTIVE (continued)
Subprogramme: Corporate Services
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Effective Human Resource Development Programme |
Human Resource Development Strategy |
3 487 |
3 836 |
4 220 |
4 642 |
Workplace Skills Plan (including competency profiles) |
|||||
Training directory |
|||||
Annual training program for year ahead |
|||||
Annual training report to PSETA |
|||||
Mainstream HIV / AIDS programmes |
HIV / AIDS Prevention Strategy (awareness and education) |
842 |
926 |
1 018 |
1 120 |
Effective Performance Management |
Improved performance management and reporting systems. |
800 |
900 |
1 000 |
1 200 |
Service Delivery Improvement Plan |
80 |
30 |
30 |
30 |
|
More effective departmental transformation |
Transformation structures |
60 |
70 |
80 |
100 |
Improved organisational culture |
1 000 |
1 000 |
1 000 |
- |
|
Gender awareness strategy |
1 500 |
1 500 |
1 500 |
- |
END OF BUDGET PERSPECTIVE: STRATEGIC OBJECTIVE 5
STRATEGIC OBJECTIVE 6: Effective co-ordination of integrated Spatial Planning and Information
TARGET PERSPECTIVE
Programme: Spatial Planning and Information
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
|||||||
More effective spatial integration |
Land Use Management Bill (LUMB) framework. |
Availability-date |
2nd quarter of 2002 |
CD:SPI |
||||||||||
Spatial Information Bill (SIB) |
Availability -date |
2nd quarter of 2002 |
||||||||||||
Planning Profession Bill (PPB) |
Availability-date |
2nd quarter of 2002 |
||||||||||||
|
Support municipal / District and provincial authorities in the formulation of their spatial development frameworks (SDFs) |
% of Completed IDPs with SDFs |
30% |
50% |
85% |
100% |
||||||||
Electronic and hard-copy system to capture and consolidate SDFs |
Availability-date |
March 2003 |
STRATEGIC OBJECTIVE 6: Effective co-ordination of integrated Spatial Planning and Information (continued)
TARGET PERSPECTIVE (continued)
Programme: Spatial Planning and Information (continued)
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
|||||||
More effective spatial integration (continued) |
Report on the state of the National Land Use Framework |
Availability date of report |
December 2002 |
CD:SPI |
||||||||||
Technical link between land reform projects and IDP process |
Response time on request by Land Reform/Restitution official (days) |
7 |
7 |
7 |
7 |
|||||||||
Standards for geographical information |
Availability SABS-endorsed standards-date |
March 2003 |
||||||||||||
Electronic directory of available data sets |
Minimised duplication and reduced costs to the state |
June 2003 |
||||||||||||
Operational electronic directory of available data |
Available-date |
June 2003 |
||||||||||||
International participation forums in geographic information institutions and symposia |
Impact assessment (on 5-point rating scale) |
3 |
3 |
3 |
3 |
STRATEGIC OBJECTIVE 6: Effective co-ordination of integrated Spatial Planning and Information (continued)
TARGET PERSPECTIVE (continued)
Programme: Surveys and Mapping
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
|||||||
Improved access to spatial information |
Accessible outlets |
Number of outlets –(%) increase over previous year |
20% |
20% |
10% |
10% |
CD:SM |
|||||||
Map awareness and map literacy products and workshops |
No of teaching aids |
300 |
300 |
600 |
600 |
|||||||||
No of adult learning workshops |
15 |
15 |
15 |
15 |
||||||||||
Spatial information supplied |
SDIP compliance (%) |
100 |
100 |
100 |
100 |
|||||||||
Satisfied clients (rating out of 5) |
4.5 |
4.5 |
4.5 |
4.5 |
||||||||||
Effective client relationship management (CRM) |
CRM units established (number) |
1 |
1 |
2 |
3 |
|||||||||
Client satisfaction (rating out of 5) |
2.5 |
3 |
4 |
4.5 |
||||||||||
National mapping programme |
Up to date maps and digital spatial information |
No of maps produced / revised |
1130 |
1400 |
1770 |
2100 |
||||||||
National control survey network |
Integrated spatial reference framework |
Availability at all times (%) |
95 |
95 |
95 |
95 |
||||||||
National aerial photography programme |
Aerial photography / satellite imagery |
Square km covered |
240 000 |
1 340 000 |
360 000 |
360 000 |
STRATEGIC OBJECTIVE 6: Effective co-ordination of integrated Spatial Planning and Information (continued)
TARGET PERSPECTIVE (continued)
Programme: Cadastral Surveys
DePartmental OUTCOMES |
OUTPUTS |
INDICATORS |
TARGETs 2002 / 03 |
TARGETs 2003 / 04 |
TARGETs 2004 / 05 |
TARGETs 2005 / 06 |
RESPons-ibility |
||||
Effective information systems |
Cadastral spatial information |
% accuracy of data |
80% |
90% |
95% |
98% |
CSG |
||||
% increase in users |
5% |
7% |
9% |
12% |
|||||||
More effective management information system |
An electronic cadastral survey system |
Availability / date |
March 2005 |
||||||||
Development progress (%) |
25% |
25% |
25% |
25% |
|||||||
User satisfaction rating |
4 / 5 |
4 / 5 |
4 / 5 |
4 / 5 |
END OF TARGET PERSPECTIVE: STRATEGIC OBJECTIVE 6
STRATEGIC OBJECTIVE 6: Effective co-ordination of integrated Spatial Planning and Information (continued)
BUDGET PERSPECTIVE
Progarmme : Spatial Planning and Information
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
More effective spatial integration
|
Land Use Management Bill (LUMB) framework |
600 |
50 |
- |
- |
Spatial Information Bill (SIB) |
250 |
50 |
- |
- |
|
Planning Profession Bill |
250 |
50 |
- |
- |
|
Support municipal / district and provincial authorities in the formulation their spatial development frameworks (SDFs) |
5 000 |
2 500 |
2 500 |
2 000 |
|
Technical "platform" to capture SDFs |
1 000 |
1 000 |
500 |
500 |
|
Report on the State of the National Spatial development Framework |
1 000 |
- |
- |
- |
|
Initiate formulation of the National Spatial Development Framework |
500 |
5 000 |
5 000 |
2 500 |
|
Standards for geographical information |
10 |
13 |
15 |
17 |
|
Minimise duplication in data collection |
16 |
15 |
17 |
17 |
|
International participation forums in geographic information institutions and symposia |
15 |
30 |
50 |
70 |
STRATEGIC OBJECTIVE 6: Effective co-ordination of integrated Spatial Planning and Information (continued)
BUDGET PERSPECTIVE (continued)
Programme: Surveys and Mapping
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Improved access to spatial information |
Accessible outlets |
200 |
250 |
350 |
370 |
Map awareness and map literacy products and workshops |
650 |
680 |
700 |
750 |
|
Spatial information supplied |
6 800 |
7 200 |
7 600 |
8 000 |
|
Improved access to spatial information |
Effective client relationship management |
500 |
530 |
1 000 |
1 100 |
National mapping programme |
Up to date maps and digital spatial information |
23 000 |
27 000 |
32 800 |
32 000 |
National control survey network |
Integrated spatial reference framework |
4 800 |
5 100 |
5 400 |
5 600 |
National aerial photography programme |
Aerial photography / satellite imagery |
4 000 |
12 700 |
10 000 |
11 600 |
Programme: Cadastral Surveys
Departmental outcomes |
Outputs |
Budget 2002/03 R’000 |
Budget 2003/04 R’000 |
Budget 2004/05 R’000 |
Budget 2005/06 R’000 |
Effective information systems |
Cadastral spatial information |
13 289 |
21 148 |
21 081 |
20 855 |
More effective management information system |
An electronic cadastral survey system |
280 |
308 |
338 |
372 |
End of budget perspective: Strategic Objective 6